The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Determine job requirements
|
|
Job requirements are established from plans, specifications, verbal instructions or visual inspections. Completed |
Evidence:
|
Installation materials are identified. Completed |
Evidence:
|
Compatibility of surface and fitting materials is identified. Completed |
Evidence:
|
Installation site of system is identified. Completed |
Evidence:
|
Select auxiliary system
|
|
Auxiliary system is selected in accordance with job requirements. Completed |
Evidence:
|
Material structure and installation procedures are identified. Completed |
Evidence:
|
Associated installation/assembly, plans/instruction are identified and verified. Completed |
Evidence:
|
Install auxiliary system
|
|
Appropriate tools for specified installation are selected. Completed |
Evidence:
|
Where applicable, structural area is cut to suit installation requirements. Completed |
Evidence:
|
Where applicable, structural reinforcement is fitted to suit job requirement. Completed |
Evidence:
|
Structural area is prepared for surface preparation. Completed |
Evidence:
|
Coating sealants and/or isolation materials are applied to suit job requirements. Completed |
Evidence:
|
Fastening methods are applied to suit job application. Completed |
Evidence:
|
Installation procedures are applied in accordance with job specification. Completed |
Evidence:
|
Clean work practices are applied. Completed |
Evidence:
|
Test operation of auxiliary system
|
|
Pre-test checks are applied and verified before standard testing procedures are actioned. Completed |
Evidence:
|
Test operation procedures are identified and verified. Completed |
Evidence:
|
Where required, test equipment is correctly set up and used in accordance with testing practice. Completed |
Evidence:
|
System is tested in accordance with specified operational procedures. Completed |
Evidence:
|
Faults are recorded/reported to appropriate authorities. Completed |
Evidence:
|
Faults are rectified and re-tested for correct operation. Completed |
Evidence:
|
Final test operation is recorded and documented according to standard operating procedures. Completed |
Evidence:
|