Evidence Guide: MSACMT221A - Apply Just in Time (JIT) procedures

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

MSACMT221A - Apply Just in Time (JIT) procedures

What evidence can you provide to prove your understanding of each of the following citeria?

Respond to indicator of demand

  1. Identify pull of product through work role
  2. Recognise indicator of flow authorisation
  3. Identify production required
Identify pull of product through work role

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Recognise indicator of flow authorisation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify production required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Make products to demand

  1. Make product as required by ticket
  2. Identify any factors likely to prevent demand being satisfied in own work or work of the team
  3. Take action in accordance with procedures
Make product as required by ticket

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify any factors likely to prevent demand being satisfied in own work or work of the team

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Take action in accordance with procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Update demand information as required

  1. Record information on ticket to procedures as required
  2. Facilitate operation of flow authorisation as part of work
Record information on ticket to procedures as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Facilitate operation of flow authorisation as part of work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Recommend improvements

  1. Examine the operation of the JIT system as it relates to own work
  2. Identify areas for improvement
  3. Identify any additional personal skill requirements to implement just in time procedures
  4. Recommend improvements
Examine the operation of the JIT system as it relates to own work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify areas for improvement

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify any additional personal skill requirements to implement just in time procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Recommend improvements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

The Evidence Guide provides advice on assessment and must be read in conjunction with the Performance Criteria, required skills and knowledge, the Range Statement and the Assessment Guidelines for this Training Package.

Overview of assessment requirements

The person will work in a JIT system, using it to authorise their own work, facilitating its operation and recommending improvements.

What are the specific resource requirements for this unit?

Access to an organisation using JIT.

What critical aspects of evidence are required to demonstrate competency in this unit?

Evidence of the routine and smooth integration of JIT into their daily work

In what context should assessment occur?

Assessment will need to occur in an organisation using JIT.

Are there any other units which could or should be assessed with this unit or which relate directly to this unit?

This unit should be assessed concurrently with relevant technical units dealing with the manufacture of product, or other units where JIT is relevant.

This unit is related to:

MSACMT421A Facilitate a Just in Time (JIT) system, and

MSACMT621A Develop a Just in Time (JIT) system

which cover the intermediate and highest skill levels in CM respectively.

What method of assessment should apply?

Assessors must be satisfied that the person can consistently perform the unit as a whole, as defined by the Elements, Performance Criteria, skills and knowledge. A holistic approach should be taken to the assessment.

Assessors should gather sufficient, fair, valid, reliable, authentic and current evidence from a range of sources. Sources of evidence may include direct observation, reports from supervisors, peers and colleagues, project work, samples, organisation records and questioning. Assessment should not require language, literacy or numeracy skills beyond those required for the unit.

The assessee will have access to all techniques, procedures, information, resources and aids which would normally be available in the workplace.

The method of assessment should be discussed and agreed with the assessee prior to the commencement of the assessment.

What evidence is required for demonstration of consistent performance?

This competency should be a routine part of the job and there should be evidence of it being consistently and routinely applied.

Required Skills and Knowledge

Required skills

reading

recording

communication

planning

problem solving

Required knowledge

relevant flow authorisations, kanban for the job

JIT methods relevant to job

procedures for recommending improvements

technical competence to do the job

Range Statement

The Range Statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording in the Performance Criteria is detailed below. Add any essential operating conditions that may be present with training and assessment depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts.

Just in time (JIT)

Just in time (JIT) is a production scheduling concept that calls for any item needed at a production operation - whether raw material, finished item, or anything in between, to be produced and available precisely when needed, neither a moment earlier nor a moment later.

Flow authorisation

A system which authorises the worker to make a product without reference to another authority.

Indicator of demand

An indicator of demand may be kanban bin, ticket or similar, or may be some other indicator of demand pull. In some plants, this may also include authorisation using SCADA software.

Ticket

A ticket may be a kanban or some other record, paper or electronic which constitutes the whole or part of the flow authorising system. Where kanban bins are used, there may be no other record.

Kanban

Kanban is a card or sheet used to authorize production or movement of an item. When fully implemented, kanban operates according to the following rules:

all production and movement of parts and material take place only as required by a downstream operation, ie all manufacturing and procurement are ultimately driven by the requirements of final assembly or the equivalent

the specific tool which authorizes production or movement is called a kanban. The word literally means card or sign, but it can legitimately refer to a container or other authorizing device. Kanban have various formats and content as appropriate for their usage (eg kanban for a vendor is different than a kanban for an internal machining operation).

Kanban is typically applied to batch type operation and the production is measured in units produced. In continuous manufacturing organisations, production is measured in terms of production rate (eg kg/h, tonne/day) and rate is increased/decreased according to the flow authorisation which may be a kanban (eg ticket, order from a supplier) or may be a SCADA signal from a remote facility (eg customer tank) saying that resupply is required or similar.

SCADA

System Control and Data Acquisition (SCADA) is a general term applied to a number of systems which automatically collect critical process data, perform required mathematical manipulations on it and then make control decisions and/or give required information personnel for action.

Pull system

A pull system is a manufacturing planning system based on making on demand as opposed to a push system based on making for stock using a sales forecast.

Procedures

Procedures include all work instructions, standard operating procedures, formulas/recipes, batch sheets, temporary instructions and similar instructions provided for the smooth running of the plant. They may be written, verbal, computer based or in some other form.

For the purposes of this Training Package, 'procedures' also includes good operating practice as may be defined by industry codes of practice (eg Good Manufacturing Practice (GMP), Responsible Care) and government regulations.