NTISthis.com

Evidence Guide: MSACMT622A - Design a process layout

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

MSACMT622A - Design a process layout

What evidence can you provide to prove your understanding of each of the following citeria?

Identify the products and processes used in the enterprise

  1. Obtain or develop a process map of the existing process
  2. Identify all/main products/classes of products
  3. Obtain forecast sales and sales pattern of products/classes
  4. Obtain profiles of products/classes
  5. Group the products/classes into compatible families.
Obtain or develop a process map of the existing process

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify all/main products/classes of products

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain forecast sales and sales pattern of products/classes

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain profiles of products/classes

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Group the products/classes into compatible families.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Engineer the process

  1. Make a preliminary selection of required equipment/ technology/process for each family
  2. Estimate required resource times for each family
  3. Calculate total resourcing required for each family
  4. Estimate appropriate lot size
  5. Determine viability of proposed families
  6. Examine draft proposal for possible improvements in process consistent with the competitive manufacturing strategy of the enterprise
Make a preliminary selection of required equipment/ technology/process for each family

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Estimate required resource times for each family

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Calculate total resourcing required for each family

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Estimate appropriate lot size

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine viability of proposed families

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Examine draft proposal for possible improvements in process consistent with the competitive manufacturing strategy of the enterprise

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Design the infrastructure

  1. Consult on layout needs with all stakeholders
  2. Identify physical infrastructure required by system
  3. Identify information and control infrastructure required
  4. Identify work organisation required
  5. Identify workforce development and training requirements
  6. Check the availability of required infrastructure and compatibility with requirements
Consult on layout needs with all stakeholders

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify physical infrastructure required by system

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify information and control infrastructure required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify work organisation required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify workforce development and training requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check the availability of required infrastructure and compatibility with requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Layout the process

  1. Draft proposed process flow map
  2. Draft proposed configuration diagram
  3. Draft proposed space plan/layout
  4. Check availability of services/structural suitability as appropriate
  5. Validate proposed layout with all relevant stakeholders
  6. Layout the process/work cell
  7. Develop implementation plan in liaison with relevant stakeholders
  8. Review layout after implementation
Draft proposed process flow map

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Draft proposed configuration diagram

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Draft proposed space plan/layout

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check availability of services/structural suitability as appropriate

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Validate proposed layout with all relevant stakeholders

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Layout the process/work cell

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Develop implementation plan in liaison with relevant stakeholders

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Review layout after implementation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

The Evidence Guide describes the underpinning knowledge and skills that must be demonstrated to prove competence. it is essential for assessment and must be read conjunction in conjunction with the performance criteria, the range statement and the assessment guidelines of the relevant training package

Overview of assessment requirements

The assessment should confirm the ability to develop or improve a process layout in a jobbing or process manufacturing enterprise

What are the specific resource requirements for this unit?

Access to an organisation developing or redesigning its process layout.

What critical aspects of evidence is required to demonstrate competency in this unit?

Evidence of process layout or layouts undertaken should be available.

In what context should assessment occur?

Assessment will need to occur in an organisation developing or improving its process layout. Assessment could also be undertaken by project work or simulation provided adequate opportunity to test the practicality of the developed layouts exist.

Are there any other units which could or should be assessed with this unit or which relate directly to this unit?

What method of assessment should apply?

Assessors must be satisfied that the person can consistently perform the unit as a whole, as defined by the Elements, Performance Criteria, skills and knowledge. A holistic approach should be taken to the assessment.

Assessors should gather sufficient, fair, valid, reliable, authentic and current evidence from a range of sources. Sources of evidence may include direct observation, reports from supervisors, peers and colleagues, project work, samples, organisation records and questioning. Assessment should not require language, literacy or numeracy skills beyond those required for the unit.

The assessee will have access to all techniques, procedures, information, resources and aids which would normally be available in the workplace.

The method of assessment should be discussed and agreed with the assessee prior to the commencement of the assessment.

What evidence is required for demonstration of consistent performance?

Generally one significant process layout project should generate sufficient evidence

Required Skills and Knowledge

Required skills

analysis

problem solving

planning and organising

verbal and written communication

calculations

Required knowledge

processing requirements of products and jobs

capabilities of equipment

abilities and skills of workforce

business requirements from layout

Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Profiles

Profiles of products may include:

components/materials needed to manufacture

equipment/technology/processes required to manufacture

volume of activity to manufacture forecast amount

Compatible families

Compatible families are products/classes requiring identical or similar manufacturing equipment, technology or processes.

Required resource times

Required resource times may include:

set up time

equipment time

person time

process time

Lot size

Lot size may include:

external lot size

internal lot size

transfer batch size

kanban size

Viability

Viability includes:

appropriate calculated processing times

adequacy of equipment utilisation

acceptable maintenance implications

ability to meet OHS requirements

ability to meet environmental requirements

compliance with any legislative and regulatory requirements

acceptable to stakeholders

Competitive manufacturing strategy

Competitive manufacturing strategies may include one or more of:

Six sigma

Lean Manufacturing

Agile Manufacturing

Just in Time (JIT)

Supply chain management

Value Chain Management

Total Quality

Pro Active maintenance

Elimination of waste

Balanced Scorecard

Stakeholders

Stakeholders include:

employees

customers

equipment suppliers and contractors (especially if new equipment required)

Depending on the process and location stakeholders may also include:

regulatory authorities

local community representatives

utilities, eg water, power

Physical infrastructure

Physical infrastructure may include:

containers

material handling equipment

utilities supply (steam, air, gas, electricity, water)

Information and control infrastructure

Information and control infrastructure may include:

quality assurance

SPC/six sigma

planning systems/software

data collection and control systems/software

Work organisation

Work organisation includes:

number of personnel

skills mix of workforce