Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

MSFDG5004 - Install heritage leadlight and stained glass

What evidence can you provide to prove your understanding of each of the following citeria?

Plan installation requirements

  1. Identify and follow work health and safety, legislative and organisational requirements
  2. Establish, confirm and clarify location of the leadlight and stained glass panel to be installed with appropriate personnel
  3. Identify removal and reinstallation sequence and develop a work plan with approval of relevant people
Identify and follow work health and safety, legislative and organisational requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Establish, confirm and clarify location of the leadlight and stained glass panel to be installed with appropriate personnel

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify removal and reinstallation sequence and develop a work plan with approval of relevant people

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare for installation

  1. Position and check tools and equipment prior to use to ensure they are appropriate for the installation, serviceable and in a safe condition
  2. Conduct inspection of the opening where the panel is to be installed
  3. Inspect leadlight and stained glass panel to ensure its integrity prior to installation
  4. Position plans and other documents to allow for confirmation of the panel structure and placement
  5. Take photographs before installation of the panel for inclusion in reference report
Position and check tools and equipment prior to use to ensure they are appropriate for the installation, serviceable and in a safe condition

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct inspection of the opening where the panel is to be installed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect leadlight and stained glass panel to ensure its integrity prior to installation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Position plans and other documents to allow for confirmation of the panel structure and placement

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Take photographs before installation of the panel for inclusion in reference report

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install the panel

  1. Install panel in position in accordance with design
  2. Install and check panel structural supports for integrity
  3. Safely remove supporting frames from the panel
  4. Identify and accurately document structural integrity
  5. Take photographs of process during and after installation for later reference
Install panel in position in accordance with design

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install and check panel structural supports for integrity

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Safely remove supporting frames from the panel

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and accurately document structural integrity

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Take photographs of process during and after installation for later reference

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Finalise and report on the installation

  1. Inspect integrity of installed panel after installation
  2. Remove, clean and store tools and equipment in accordance with workplace procedures
  3. Clean removal area and dispose of rubbish
  4. Prepare required installation report and provide to relevant people in accordance with job requirements
Inspect integrity of installed panel after installation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Remove, clean and store tools and equipment in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean removal area and dispose of rubbish

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare required installation report and provide to relevant people in accordance with job requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge