The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare for work
|
|
Applicable work health and safety (WHS), legislative and organisational requirements relevant to moisture barriers and damp proof membranes are verified and complied with Completed |
Evidence:
|
Instructions and/or plans are read and interpreted to identify the process required to complete work tasks Completed |
Evidence:
|
Sub-floors are inspected in accordance with Australian Standards and treatment system identified Completed |
Evidence:
|
Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition Completed |
Evidence:
|
Material safety data sheets (MSDS), or equivalent, are read and applied during work Completed |
Evidence:
|
Materials and equipment are prepared and positioned for use Completed |
Evidence:
|
Surfaces are cleaned in accordance with manufacturer recommendations Completed |
Evidence:
|
Apply moisture suppressant
|
|
Surface coating is applied with the depth and coverage in accordance with manufacturer specifications and job requirements Completed |
Evidence:
|
Sub-floor is checked and cleared for further processing Completed |
Evidence:
|
Apply moisture barrier
|
|
Moisture is established as hydrostatic pressure, capillary moisture, or new concrete with high moisture content Completed |
Evidence:
|
Moisture content is established as reducing, construction moisture or a result of damaged membrane or capillary action Completed |
Evidence:
|
All corners, cracks and other penetrations are strengthened Completed |
Evidence:
|
barrier material is laid in accordance with manufacturer instructions Completed |
Evidence:
|
Second coating is applied as required Completed |
Evidence:
|
Sub-floor is checked and cleared for further processing Completed |
Evidence:
|
Complete housekeeping
|
|
Unused materials are stored or recycled as required Completed |
Evidence:
|
Remains of compounds used are cleaned up and disposed of appropriately Completed |
Evidence:
|
Tools and equipment are cleaned and stored appropriately Completed |
Evidence:
|
Work area is cleaned and rubbish disposed of appropriately Completed |
Evidence:
|
Workplace documentation is completed Completed |
Evidence:
|