Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

MSFFL2010 - Prepare walls for coverings

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare for work

  1. Applicable work health and safety (WHS), legislative and organisational requirements and Australian Standards relevant to wall preparation for coverings on wall substrate are verified and complied with
  2. Instructions and/or plans are read and interpreted to identify the process required to complete work tasks
  3. The condition of the walls are assessed to prepare walls to a smooth flat surface, and the extent of preparation required is confirmed
  4. Suitable primers, smoothing and repairing compounds are selected
  5. Surfaces are checked for contamination, moisture content, plane, smooth, square internal and external corners and suitable preparation
  6. Material safety data sheets (MSDS), or equivalent, are read and applied during the work
  7. Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition
  8. Sequence of work is planned, including the starting point, to ensure efficiency and quality of installation
Applicable work health and safety (WHS), legislative and organisational requirements and Australian Standards relevant to wall preparation for coverings on wall substrate are verified and complied with

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Instructions and/or plans are read and interpreted to identify the process required to complete work tasks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

The condition of the walls are assessed to prepare walls to a smooth flat surface, and the extent of preparation required is confirmed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Suitable primers, smoothing and repairing compounds are selected

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Surfaces are checked for contamination, moisture content, plane, smooth, square internal and external corners and suitable preparation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Material safety data sheets (MSDS), or equivalent, are read and applied during the work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Sequence of work is planned, including the starting point, to ensure efficiency and quality of installation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Apply levelling compounds and primers

  1. A mixing station is established where materials and equipment are prepared and positioned for use
  2. Trial applications of surface materials are made to check equipment operation, materials consistency and specified surface finish
  3. Surface coating is applied with the depth and coverage in accordance with manufacturer specifications and job requirements
  4. Internal and external corners are checked for square, wall surfaces are checked for plane and smooth and cleared for further processing
  5. Completed work is checked for flaws in installation and materials and faults rectified
A mixing station is established where materials and equipment are prepared and positioned for use

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Trial applications of surface materials are made to check equipment operation, materials consistency and specified surface finish

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Surface coating is applied with the depth and coverage in accordance with manufacturer specifications and job requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Internal and external corners are checked for square, wall surfaces are checked for plane and smooth and cleared for further processing

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Completed work is checked for flaws in installation and materials and faults rectified

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete housekeeping

  1. Unused materials are stored or recycled as required
  2. Tools and equipment are cleaned and stored appropriately
  3. Work area is cleaned and rubbish disposed of appropriately
  4. Workplace documentation is completed
Unused materials are stored or recycled as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools and equipment are cleaned and stored appropriately

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work area is cleaned and rubbish disposed of appropriately

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Workplace documentation is completed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Prepare for work

1.1

Applicable work health and safety (WHS), legislative and organisational requirements and Australian Standards relevant to wall preparation for coverings on wall substrate are verified and complied with

1.2

Instructions and/or plans are read and interpreted to identify the process required to complete work tasks

1.3

The condition of the walls are assessed to prepare walls to a smooth flat surface, and the extent of preparation required is confirmed

1.4

Suitable primers, smoothing and repairing compounds are selected

1.5

Surfaces are checked for contamination, moisture content, plane, smooth, square internal and external corners and suitable preparation

1.6

Material safety data sheets (MSDS), or equivalent, are read and applied during the work

1.7

Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition

1.8

Sequence of work is planned, including the starting point, to ensure efficiency and quality of installation

2

Apply levelling compounds and primers

2.1

A mixing station is established where materials and equipment are prepared and positioned for use

2.2

Trial applications of surface materials are made to check equipment operation, materials consistency and specified surface finish

2.3

Surface coating is applied with the depth and coverage in accordance with manufacturer specifications and job requirements

2.4

Internal and external corners are checked for square, wall surfaces are checked for plane and smooth and cleared for further processing

2.5

Completed work is checked for flaws in installation and materials and faults rectified

3

Complete housekeeping

3.1

Unused materials are stored or recycled as required

3.2

Tools and equipment are cleaned and stored appropriately

3.3

Work area is cleaned and rubbish disposed of appropriately

3.4

Workplace documentation is completed

Required Skills and Knowledge

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Prepare for work

1.1

Applicable work health and safety (WHS), legislative and organisational requirements and Australian Standards relevant to wall preparation for coverings on wall substrate are verified and complied with

1.2

Instructions and/or plans are read and interpreted to identify the process required to complete work tasks

1.3

The condition of the walls are assessed to prepare walls to a smooth flat surface, and the extent of preparation required is confirmed

1.4

Suitable primers, smoothing and repairing compounds are selected

1.5

Surfaces are checked for contamination, moisture content, plane, smooth, square internal and external corners and suitable preparation

1.6

Material safety data sheets (MSDS), or equivalent, are read and applied during the work

1.7

Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition

1.8

Sequence of work is planned, including the starting point, to ensure efficiency and quality of installation

2

Apply levelling compounds and primers

2.1

A mixing station is established where materials and equipment are prepared and positioned for use

2.2

Trial applications of surface materials are made to check equipment operation, materials consistency and specified surface finish

2.3

Surface coating is applied with the depth and coverage in accordance with manufacturer specifications and job requirements

2.4

Internal and external corners are checked for square, wall surfaces are checked for plane and smooth and cleared for further processing

2.5

Completed work is checked for flaws in installation and materials and faults rectified

3

Complete housekeeping

3.1

Unused materials are stored or recycled as required

3.2

Tools and equipment are cleaned and stored appropriately

3.3

Work area is cleaned and rubbish disposed of appropriately

3.4

Workplace documentation is completed

Interpret work order and locate and apply relevant information

Apply safe handling requirements for equipment, products and materials, including use of personal protective equipment

Identify materials used in the work process

Follow work instructions, operating procedures and inspection processes to:

minimise the risk of injury to self or others

prevent damage to goods, equipment and products

maintain required production output and product quality

Complete, to Australian Standards, a minimum of two (2) wall preparations which are to include:

a patch and repair to a wall, including internal and external corners

a skim coat to walls, including internal and external corners

Use mathematical ideas and techniques to correctly complete measurements, calculate area and estimate material requirements

Communicate ideas and information to enable confirmation of work requirements and specifications and the reporting of work outcomes and problems, interpret basic plans and follow safety procedures

Avoid backtracking, work flow interruptions or wastage

Work with others and in a team by recognising dependencies and using cooperative approaches to optimise work flow and productivity

State or territory WHS legislation, regulations, standards and codes of practice relevant to patching and smoothing techniques

Organisation and site standards, requirements, policies and procedures for applying smoothing and patching compounds

Environmental protection requirements

Established communication channels and protocols

Relevant problem identification and resolution

Types of tools and equipment and procedures for their safe use, operation and maintenance

Characteristics of materials, products and defects

Set-up and operation of equipment

Procedures for the recording, reporting and maintenance of workplace records and information

Appropriate mathematical procedures for estimation and measurement

Characteristics and requirements of substrate preparation

Type, characteristics, uses and limitations of smoothing compounds and primers

Workplace safety system requirements related to the application of smoothing compounds and primers

Range Statement

Specifies different work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Range is restricted to essential operating conditions and any other variables essential to the work environment.

Unit context includes:

WHS requirements, including legislation, building codes, material safety management systems, hazardous and dangerous goods codes, and local safe operating procedures or equivalent

work is carried out in accordance with legislative obligations, environmental legislation, relevant health regulations, manual handling procedures and organisation insurance requirements

work requires individual to demonstrate some discretion, judgement and problem solving

Wall preparation includes:

the application of primers, repairing and smoothing cement-based compounds

Substrates include:

concrete

cement rendered

fibrous cement board

medium and high density fibreboard (MDF/HDF) hard underlay

ply sheeting

hardboard

Tools and equipment include:

utility knife

straight edge

square

tape measure

spirit level

screed bar

finishing trowel

corner trowel

spatula

rollers

brushes

measuring buckets

batching buckets

angle grinder

trolley

Materials include:

sanding paper

grinding discs

carborundum brick

smoothing and repairing compounds

primers

Personal protective equipment includes:

that prescribed under legislation, regulations and enterprise policies and practices

Information and procedures include:

workplace procedures relating to the use of tools and equipment

work instructions, including job sheets, cutting lists, plans, drawings and designs

workplace procedures relating to reporting and communication

manufacturer specifications and operational procedures