NTISthis.com

Evidence Guide: MSFFL2020 - Install unpatterned tufted and bonded carpet floor coverings to stairs

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

MSFFL2020 - Install unpatterned tufted and bonded carpet floor coverings to stairs

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare for installation

  1. Applicable work health and safety (WHS), legislative and organisational requirements relevant to installing unpatterned tufted and bonded carpet to stairways are verified and complied with
  2. Instructions and/or plans are read and interpreted to identify the process required to complete work tasks
  3. Floor condition is assessed for suitability for installation of unpatterned tufted and bonded carpet
  4. Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition
  5. Sequence of work is planned, including the starting point, to ensure efficiency and quality of installation
Applicable work health and safety (WHS), legislative and organisational requirements relevant to installing unpatterned tufted and bonded carpet to stairways are verified and complied with

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Instructions and/or plans are read and interpreted to identify the process required to complete work tasks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Floor condition is assessed for suitability for installation of unpatterned tufted and bonded carpet

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Sequence of work is planned, including the starting point, to ensure efficiency and quality of installation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set out materials

  1. Carpet to be installed is checked against order
  2. Tufted and bonded carpets are acclimatised according to manufacturer recommendations
  3. Stairway or step is measured and the required amount of floor covering, and underlay, including allowances for type of stairs, is calculated and obtained
  4. Suitable adhesives, gripper strips and edge strips are selected
  5. Gripper strips are cut and installed as specified in AS/NZS 2455.1:2007 Textile floor coverings - Installation practice – General
  6. Underlay is checked against specified type and fitted as specified in AS/NZS 2455.1:2007 Textile floor coverings - Installation practice - General
Carpet to be installed is checked against order

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tufted and bonded carpets are acclimatised according to manufacturer recommendations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Stairway or step is measured and the required amount of floor covering, and underlay, including allowances for type of stairs, is calculated and obtained

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Suitable adhesives, gripper strips and edge strips are selected

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Gripper strips are cut and installed as specified in AS/NZS 2455.1:2007 Textile floor coverings - Installation practice – General

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Underlay is checked against specified type and fitted as specified in AS/NZS 2455.1:2007 Textile floor coverings - Installation practice - General

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Lay floor coverings

  1. Instructions and sequence for laying and fixing are followed
  2. Carpet floor coverings are laid out to meet allowances for type of stair requirements and minimise waste
  3. Carpet floor coverings are accurately and clearly marked for cutting
  4. Carpet floor coverings are cut to required shape with minimum waste of materials and laid
  5. Instructions, sequence, fixing methods and equipment are used following specifications and AS/NZS 2455.1:2007 Textile floor coverings - Installation practice - General
  6. Installation is completed to specification
  7. Finished stairway is checked for flaws in installation and materials and faults rectified
Instructions and sequence for laying and fixing are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carpet floor coverings are laid out to meet allowances for type of stair requirements and minimise waste

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carpet floor coverings are accurately and clearly marked for cutting

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carpet floor coverings are cut to required shape with minimum waste of materials and laid

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Instructions, sequence, fixing methods and equipment are used following specifications and AS/NZS 2455.1:2007 Textile floor coverings - Installation practice - General

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Installation is completed to specification

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Finished stairway is checked for flaws in installation and materials and faults rectified

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete housekeeping

  1. Unused materials are stored or recycled as required
  2. Tools and equipment are cleaned and stored appropriately
  3. Work area is cleaned and rubbish disposed of appropriately
  4. Workplace documentation is completed
Unused materials are stored or recycled as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools and equipment are cleaned and stored appropriately

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work area is cleaned and rubbish disposed of appropriately

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Workplace documentation is completed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Prepare for installation

1.1

Applicable work health and safety (WHS), legislative and organisational requirements relevant to installing unpatterned tufted and bonded carpet to stairways are verified and complied with

1.2

Instructions and/or plans are read and interpreted to identify the process required to complete work tasks

1.3

Floor condition is assessed for suitability for installation of unpatterned tufted and bonded carpet

1.4

Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition

1.5

Sequence of work is planned, including the starting point, to ensure efficiency and quality of installation

2

Set out materials

2.1

Carpet to be installed is checked against order

2.2

Tufted and bonded carpets are acclimatised according to manufacturer recommendations

2.3

Stairway or step is measured and the required amount of floor covering, and underlay, including allowances for type of stairs, is calculated and obtained

2.4

Suitable adhesives, gripper strips and edge strips are selected

2.5

Gripper strips are cut and installed as specified in AS/NZS 2455.1:2007 Textile floor coverings - Installation practice – General

2.6

Underlay is checked against specified type and fitted as specified in AS/NZS 2455.1:2007 Textile floor coverings - Installation practice - General

3

Lay floor coverings

3.1

Instructions and sequence for laying and fixing are followed

3.2

Carpet floor coverings are laid out to meet allowances for type of stair requirements and minimise waste

3.3

Carpet floor coverings are accurately and clearly marked for cutting

3.4

Carpet floor coverings are cut to required shape with minimum waste of materials and laid

3.5

Instructions, sequence, fixing methods and equipment are used following specifications and AS/NZS 2455.1:2007 Textile floor coverings - Installation practice - General

3.6

Installation is completed to specification

3.7

Finished stairway is checked for flaws in installation and materials and faults rectified

4

Complete housekeeping

4.1

Unused materials are stored or recycled as required

4.2

Tools and equipment are cleaned and stored appropriately

4.3

Work area is cleaned and rubbish disposed of appropriately

4.4

Workplace documentation is completed

Required Skills and Knowledge

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Prepare for installation

1.1

Applicable work health and safety (WHS), legislative and organisational requirements relevant to installing unpatterned tufted and bonded carpet to stairways are verified and complied with

1.2

Instructions and/or plans are read and interpreted to identify the process required to complete work tasks

1.3

Floor condition is assessed for suitability for installation of unpatterned tufted and bonded carpet

1.4

Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition

1.5

Sequence of work is planned, including the starting point, to ensure efficiency and quality of installation

2

Set out materials

2.1

Carpet to be installed is checked against order

2.2

Tufted and bonded carpets are acclimatised according to manufacturer recommendations

2.3

Stairway or step is measured and the required amount of floor covering, and underlay, including allowances for type of stairs, is calculated and obtained

2.4

Suitable adhesives, gripper strips and edge strips are selected

2.5

Gripper strips are cut and installed as specified in AS/NZS 2455.1:2007 Textile floor coverings - Installation practice – General

2.6

Underlay is checked against specified type and fitted as specified in AS/NZS 2455.1:2007 Textile floor coverings - Installation practice - General

3

Lay floor coverings

3.1

Instructions and sequence for laying and fixing are followed

3.2

Carpet floor coverings are laid out to meet allowances for type of stair requirements and minimise waste

3.3

Carpet floor coverings are accurately and clearly marked for cutting

3.4

Carpet floor coverings are cut to required shape with minimum waste of materials and laid

3.5

Instructions, sequence, fixing methods and equipment are used following specifications and AS/NZS 2455.1:2007 Textile floor coverings - Installation practice - General

3.6

Installation is completed to specification

3.7

Finished stairway is checked for flaws in installation and materials and faults rectified

4

Complete housekeeping

4.1

Unused materials are stored or recycled as required

4.2

Tools and equipment are cleaned and stored appropriately

4.3

Work area is cleaned and rubbish disposed of appropriately

4.4

Workplace documentation is completed

Interpret work order and locate and apply relevant information

Apply safe handling requirements for equipment, products and materials, including use of personal protective equipment

Identify materials used in the work process

Follow work instructions, operating procedures and inspection processes to:

minimise the risk of injury to self or others

prevent damage to goods, equipment and products

maintain required production output and product quality

Complete a minimum of the installation of one (1) tufted carpet and one (1) fusion bonded carpet to:

a box step stairway containing at least 12 steps, and

a kite winder treads stairway containing at least 3 steps

Use mathematical ideas and techniques to correctly complete measurements, calculate area and estimate material requirements

Communicate ideas and information to enable confirmation of work requirements and specifications and the reporting of work outcomes and problems, interpret basic plans and follow safety procedures

Avoid backtracking, work flow interruptions or wastage

Work with others and in a team by recognising dependencies and using cooperative approaches to optimise work flow and productivity

State or territory WHS legislation, regulations, standards and codes of practice relevant to installing unpatterned tufted and bonded carpet on stairs

Organisational and site standards, requirements, policies and procedures for the installation of unpatterned tufted and bonded carpet on stairs

Environmental protection requirements

Established communication channels and protocols

Relevant problem identification and resolution

Types of tools and equipment and procedures for their safe use, operation and maintenance

Characteristics of materials, products and defects

Set-up and operation of equipment

Products assembly techniques

Procedures for the recording, reporting and maintenance of workplace records and information

Appropriate mathematical procedures for estimation and measurement

Types and characteristics of stairway

Types and uses of carpet installation tools, equipment and materials

Types, uses and limitations of stairway carpet fixing techniques

Characteristics of timber and concrete sub-floors

Workplace safety system requirements related to stairway carpet installation

Work flow in relation to the installation of carpets on stairways

Range Statement

Specifies different work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Range is restricted to essential operating conditions and any other variables essential to the work environment.

Unit context includes:

WHS requirements, including legislation, building codes, material safety management systems, hazardous and dangerous goods codes and local safe operating procedures or equivalent

work is carried out in accordance with legislative obligations, environmental legislation, relevant health regulations, manual handling procedures and organisation insurance requirements

work requires individual to demonstrate some discretion, judgement and problem solving

Carpets include:

unpatterned

tufted

fusion bonded

Stairways include:

box steps

kite winder treads

Tools and equipment include:

knee kicker

stair tool

carpet gripper cutters

trimmer

hammer

staple hammer

compressor

air staple gun

utility knife

straight edge

drill

hacksaw

sewing needles

Materials include:

underlay

tapes and adhesives

trims

nosing

gripper strips

smooth edges

other accessories

Personal protective equipment includes:

that prescribed under legislation, regulations and enterprise policies and practices

Information and procedures include:

workplace procedures relating to the use of tools and equipment

work instructions, including job sheets, cutting lists, plans, drawings and designs

workplace procedures relating to reporting and communication

manufacturer specifications and operational procedures