Evidence Guide: MSFFL3016 - Install rubber floor coverings

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

MSFFL3016 - Install rubber floor coverings

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare for installation

  1. Applicable work health and safety (WHS), legislative and organisational requirements relevant to installing rubber floor coverings are verified and complied with
  2. Instructions and/or plans are read and interpreted to identify the process required to complete work tasks
  3. Sub-floor condition is assessed for suitability for installation of rubber floor coverings
  4. Suitable adhesives, trims and accessories are selected, if required
  5. Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition
  6. Sequence of work is planned, including the starting point, to ensure efficiency and quality of installation
Applicable work health and safety (WHS), legislative and organisational requirements relevant to installing rubber floor coverings are verified and complied with

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Instructions and/or plans are read and interpreted to identify the process required to complete work tasks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Sub-floor condition is assessed for suitability for installation of rubber floor coverings

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Suitable adhesives, trims and accessories are selected, if required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Sequence of work is planned, including the starting point, to ensure efficiency and quality of installation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set out materials

  1. Rubber floor covering to be installed is checked against order
  2. Rubber floor coverings are acclimatised according to manufacturer recommendations
  3. Rubber floor coverings for fixing are organised and used in accordance with relevant safety management requirements
  4. Instructions and sequence for laying and fixing are followed
  5. Working lines and starting point are established
Rubber floor covering to be installed is checked against order

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Rubber floor coverings are acclimatised according to manufacturer recommendations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Rubber floor coverings for fixing are organised and used in accordance with relevant safety management requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Instructions and sequence for laying and fixing are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Working lines and starting point are established

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Lay rubber floor coverings

  1. Instructions and sequence for laying and fixing are followed
  2. Rubber floor coverings are laid out to meet directional sequence, pattern match, specification requirements, and to minimise waste and joins as appropriate
  3. Rubber flooring materials are accurately and clearly marked for cutting
  4. Rubber floor covering materials are cut to required shape ensuring minimum waste
  5. Rubber floor covering materials for fixing are organised and used in accordance with relevant safety management requirements
  6. Adhesives and edge strips/accessories are prepared for use as required
  7. Fixing methods and equipment are used following manufacturer recommendations
  8. Finished job is inspected and any imperfections are rectified following workplace procedures
Instructions and sequence for laying and fixing are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Rubber floor coverings are laid out to meet directional sequence, pattern match, specification requirements, and to minimise waste and joins as appropriate

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Rubber flooring materials are accurately and clearly marked for cutting

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Rubber floor covering materials are cut to required shape ensuring minimum waste

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Rubber floor covering materials for fixing are organised and used in accordance with relevant safety management requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Adhesives and edge strips/accessories are prepared for use as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fixing methods and equipment are used following manufacturer recommendations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Finished job is inspected and any imperfections are rectified following workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete housekeeping

  1. Unused materials are stored or recycled as required
  2. Tools and equipment are cleaned and stored appropriately
  3. Work area is cleaned and rubbish disposed of appropriately
  4. Workplace documentation is completed
Unused materials are stored or recycled as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools and equipment are cleaned and stored appropriately

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work area is cleaned and rubbish disposed of appropriately

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Workplace documentation is completed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Prepare for installation

1.1

Applicable work health and safety (WHS), legislative and organisational requirements relevant to installing rubber floor coverings are verified and complied with

1.2

Instructions and/or plans are read and interpreted to identify the process required to complete work tasks

1.3

Sub-floor condition is assessed for suitability for installation of rubber floor coverings

1.4

Suitable adhesives, trims and accessories are selected, if required

1.5

Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition

1.6

Sequence of work is planned, including the starting point, to ensure efficiency and quality of installation

2

Set out materials

2.1

Rubber floor covering to be installed is checked against order

2.2

Rubber floor coverings are acclimatised according to manufacturer recommendations

2.3

Rubber floor coverings for fixing are organised and used in accordance with relevant safety management requirements

2.4

Instructions and sequence for laying and fixing are followed

2.5

Working lines and starting point are established

3

Lay rubber floor coverings

3.1

Instructions and sequence for laying and fixing are followed

3.2

Rubber floor coverings are laid out to meet directional sequence, pattern match, specification requirements, and to minimise waste and joins as appropriate

3.3

Rubber flooring materials are accurately and clearly marked for cutting

3.4

Rubber floor covering materials are cut to required shape ensuring minimum waste

3.5

Rubber floor covering materials for fixing are organised and used in accordance with relevant safety management requirements

3.6

Adhesives and edge strips/accessories are prepared for use as required

3.7

Fixing methods and equipment are used following manufacturer recommendations

3.8

Finished job is inspected and any imperfections are rectified following workplace procedures

4

Complete housekeeping

4.1

Unused materials are stored or recycled as required

4.2

Tools and equipment are cleaned and stored appropriately

4.3

Work area is cleaned and rubbish disposed of appropriately

4.4

Workplace documentation is completed

Required Skills and Knowledge

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Prepare for installation

1.1

Applicable work health and safety (WHS), legislative and organisational requirements relevant to installing rubber floor coverings are verified and complied with

1.2

Instructions and/or plans are read and interpreted to identify the process required to complete work tasks

1.3

Sub-floor condition is assessed for suitability for installation of rubber floor coverings

1.4

Suitable adhesives, trims and accessories are selected, if required

1.5

Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition

1.6

Sequence of work is planned, including the starting point, to ensure efficiency and quality of installation

2

Set out materials

2.1

Rubber floor covering to be installed is checked against order

2.2

Rubber floor coverings are acclimatised according to manufacturer recommendations

2.3

Rubber floor coverings for fixing are organised and used in accordance with relevant safety management requirements

2.4

Instructions and sequence for laying and fixing are followed

2.5

Working lines and starting point are established

3

Lay rubber floor coverings

3.1

Instructions and sequence for laying and fixing are followed

3.2

Rubber floor coverings are laid out to meet directional sequence, pattern match, specification requirements, and to minimise waste and joins as appropriate

3.3

Rubber flooring materials are accurately and clearly marked for cutting

3.4

Rubber floor covering materials are cut to required shape ensuring minimum waste

3.5

Rubber floor covering materials for fixing are organised and used in accordance with relevant safety management requirements

3.6

Adhesives and edge strips/accessories are prepared for use as required

3.7

Fixing methods and equipment are used following manufacturer recommendations

3.8

Finished job is inspected and any imperfections are rectified following workplace procedures

4

Complete housekeeping

4.1

Unused materials are stored or recycled as required

4.2

Tools and equipment are cleaned and stored appropriately

4.3

Work area is cleaned and rubbish disposed of appropriately

4.4

Workplace documentation is completed

Interpret work order and locate and apply relevant information

Apply safe handling requirements for equipment, products and materials, including use of personal protective equipment

Identify materials used in the work process

Follow work instructions, operating procedures and inspection processes to:

minimise the risk of injury to self or others

prevent damage to goods, equipment and products

maintain required production output and product quality

Complete a minimum of two (2) different types of installation, which are to include:

one (1) epoxy rubber tile installation to connecting rooms

one (1) polyurethane rubber sheet installation to connecting rooms

Use mathematical ideas and techniques to correctly complete measurements, calculate area and estimate material requirements

Communicate ideas and information to enable confirmation of work requirements and specifications and the reporting of work outcomes and problems, interpret basic plans and follow safety procedures

Avoid backtracking, work flow interruptions or wastage

Work with others and in a team by recognising dependencies and using cooperative approaches to optimise work flow and productivity

State or territory WHS legislation, regulations, standards and codes of practice relevant to installing rubber floor coverings

Organisational and site standards, requirements, policies and procedures for installing rubber floor coverings

Environmental protection requirements

Established communication channels and protocols

Relevant problem identification and resolution

Types of tools and equipment and procedures for their safe use, operation and maintenance

Characteristics of materials, products and defects

Set-up and operation of equipment

Products assembly techniques

Procedures for the recording, reporting and maintenance of workplace records and information

Appropriate mathematical procedures for estimation and measurement

Type, characteristics, uses and limitations of:

rubber floor covering

installation adhesives

Types and uses of installation tools and equipment

Workplace safety system requirements related to rubber floor coverings

Characteristics and requirements of sub-floor preparation

Work flow in relation to the installation of rubber floor coverings

Range Statement

Specifies different work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Range is restricted to essential operating conditions and any other variables essential to the work environment.

Unit context includes:

WHS requirements, including legislation, building codes, material safety management systems, hazardous and dangerous goods codes, and local safe operating procedures or equivalent

work is carried out in accordance with legislative obligations, environmental legislation, relevant health regulations, manual handling procedures and organisation insurance requirements

work requires individuals to demonstrate some discretion, judgement and problem solving

Rubber floor coverings include:

smooth and studded rubber in both sheet and tile and are normally vulcanised

Adhesives include:

two-part epoxy

polyurethane

acrylic

contact

Tools and equipment include:

utility knife

straight edge

square

chalk and chalk-line

tape measure

hacksaw

notched trowel

hammer

recess scriber

scribing bar

dividers

hand roller

roller

mixing equipment (epoxy)

paint brush and bucket

spatula knife

builders pencils

contact bucket

brushes

linoleum trolley

dolly rollers

Materials include:

rubber floor covering (tile or sheet)

trims and accessories

adhesives

Personal protective equipment includes:

that prescribed under legislation, regulations and enterprise policies and practices

Information and procedures include:

workplace procedures relating to the use of tools and equipment

work instructions, including job sheets, cutting lists, plans, drawings and designs

workplace procedures relating to reporting and communication

manufacturer specifications and operational procedures