Evidence Guide: MSFFL3037 - Install sprung timber flooring

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

MSFFL3037 - Install sprung timber flooring

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare for work

  1. Applicable work health and safety (WHS), legislative and organisational requirements relevant to the installing sprung timber flooring are verified and complied with
  2. Instructions and/or plans are read and interpreted to identify process required to complete work tasks
  3. Sub-floor condition is assessed for suitability for installation of sprung timber flooring consistent with Australian Standards, industry standards and manufacturer recommendations
  4. Suitable underlays, adhesives, trims and accessories are selected if required
  5. Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition
  6. Sequence of work is planned to identify the starting point and to ensure efficiency and quality of the work
Applicable work health and safety (WHS), legislative and organisational requirements relevant to the installing sprung timber flooring are verified and complied with

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Instructions and/or plans are read and interpreted to identify process required to complete work tasks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Sub-floor condition is assessed for suitability for installation of sprung timber flooring consistent with Australian Standards, industry standards and manufacturer recommendations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Suitable underlays, adhesives, trims and accessories are selected if required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Sequence of work is planned to identify the starting point and to ensure efficiency and quality of the work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set out materials

  1. Timber flooring to be installed is checked against order
  2. Timber flooring is acclimatised according to manufacturer recommendations
  3. Skirting boards or cover trims are removed or undercut, if required, and stored for re-fitting or sent for machining
  4. Timber flooring for fixing is organised and used in accordance with relevant safety management requirements
  5. Adhesives and edge strips are prepared for use as required
  6. Area to be covered is measured, working lines and starting point are established
Timber flooring to be installed is checked against order

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Timber flooring is acclimatised according to manufacturer recommendations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Skirting boards or cover trims are removed or undercut, if required, and stored for re-fitting or sent for machining

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Timber flooring for fixing is organised and used in accordance with relevant safety management requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Adhesives and edge strips are prepared for use as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Area to be covered is measured, working lines and starting point are established

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cut timber flooring

  1. Instructions and sequence for laying and fixing are followed
  2. Underfloor pads are laid according to manufacturer recommendations
  3. Timber flooring is laid out to meet directional sequence, pattern match, specification requirements, and to minimise waste and joins as appropriate
  4. The aesthetics of the materials are maximised, including matching grains and colours
  5. Timber flooring is accurately and clearly marked for cutting
  6. Timber flooring is cut to length and size for final laying to provide appropriate size and shape ensuring minimum waste
  7. Materials for fixing are organised and used in accordance with relevant safety management requirements
Instructions and sequence for laying and fixing are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Underfloor pads are laid according to manufacturer recommendations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Timber flooring is laid out to meet directional sequence, pattern match, specification requirements, and to minimise waste and joins as appropriate

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

The aesthetics of the materials are maximised, including matching grains and colours

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Timber flooring is accurately and clearly marked for cutting

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Timber flooring is cut to length and size for final laying to provide appropriate size and shape ensuring minimum waste

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Materials for fixing are organised and used in accordance with relevant safety management requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Lay sprung timber flooring

  1. Instructions and sequence for laying and fixing are followed
  2. Materials for fixing are organised and used in accordance with relevant safety management requirements
  3. Fixing methods and equipment are used following manufacturer recommendations
  4. Appropriate field and perimeter expansion joints are allowed
  5. Skirting boards or cover trims are fitted/re-fitted and finished
  6. Finished job is inspected and any imperfections are rectified following workplace procedures
Instructions and sequence for laying and fixing are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Materials for fixing are organised and used in accordance with relevant safety management requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fixing methods and equipment are used following manufacturer recommendations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Appropriate field and perimeter expansion joints are allowed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Skirting boards or cover trims are fitted/re-fitted and finished

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Finished job is inspected and any imperfections are rectified following workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete housekeeping

  1. Unused materials are stored or recycled as required
  2. Tools and equipment are cleaned and stored appropriately
  3. Work area is cleaned and rubbish disposed of appropriately
  4. Workplace documentation is completed
Unused materials are stored or recycled as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools and equipment are cleaned and stored appropriately

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work area is cleaned and rubbish disposed of appropriately

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Workplace documentation is completed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Prepare for work

1.1

Applicable work health and safety (WHS), legislative and organisational requirements relevant to the installing sprung timber flooring are verified and complied with

1.2

Instructions and/or plans are read and interpreted to identify process required to complete work tasks

1.3

Sub-floor condition is assessed for suitability for installation of sprung timber flooring consistent with Australian Standards, industry standards and manufacturer recommendations

1.4

Suitable underlays, adhesives, trims and accessories are selected if required

1.5

Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition

1.6

Sequence of work is planned to identify the starting point and to ensure efficiency and quality of the work

2

Set out materials

2.1

Timber flooring to be installed is checked against order

2.2

Timber flooring is acclimatised according to manufacturer recommendations

2.3

Skirting boards or cover trims are removed or undercut, if required, and stored for re-fitting or sent for machining

2.4

Timber flooring for fixing is organised and used in accordance with relevant safety management requirements

2.5

Adhesives and edge strips are prepared for use as required

2.6

Area to be covered is measured, working lines and starting point are established

3

Cut timber flooring

3.1

Instructions and sequence for laying and fixing are followed

3.2

Underfloor pads are laid according to manufacturer recommendations

3.3

Timber flooring is laid out to meet directional sequence, pattern match, specification requirements, and to minimise waste and joins as appropriate

3.4

The aesthetics of the materials are maximised, including matching grains and colours

3.5

Timber flooring is accurately and clearly marked for cutting

3.6

Timber flooring is cut to length and size for final laying to provide appropriate size and shape ensuring minimum waste

3.7

Materials for fixing are organised and used in accordance with relevant safety management requirements

4

Lay sprung timber flooring

4.1

Instructions and sequence for laying and fixing are followed

4.2

Materials for fixing are organised and used in accordance with relevant safety management requirements

4.3

Fixing methods and equipment are used following manufacturer recommendations

4.4

Appropriate field and perimeter expansion joints are allowed

4.5

Skirting boards or cover trims are fitted/re-fitted and finished

4.6

Finished job is inspected and any imperfections are rectified following workplace procedures

5

Complete housekeeping

5.1

Unused materials are stored or recycled as required

5.2

Tools and equipment are cleaned and stored appropriately

5.3

Work area is cleaned and rubbish disposed of appropriately

5.4

Workplace documentation is completed

Required Skills and Knowledge

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Prepare for work

1.1

Applicable work health and safety (WHS), legislative and organisational requirements relevant to the installing sprung timber flooring are verified and complied with

1.2

Instructions and/or plans are read and interpreted to identify process required to complete work tasks

1.3

Sub-floor condition is assessed for suitability for installation of sprung timber flooring consistent with Australian Standards, industry standards and manufacturer recommendations

1.4

Suitable underlays, adhesives, trims and accessories are selected if required

1.5

Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition

1.6

Sequence of work is planned to identify the starting point and to ensure efficiency and quality of the work

2

Set out materials

2.1

Timber flooring to be installed is checked against order

2.2

Timber flooring is acclimatised according to manufacturer recommendations

2.3

Skirting boards or cover trims are removed or undercut, if required, and stored for re-fitting or sent for machining

2.4

Timber flooring for fixing is organised and used in accordance with relevant safety management requirements

2.5

Adhesives and edge strips are prepared for use as required

2.6

Area to be covered is measured, working lines and starting point are established

3

Cut timber flooring

3.1

Instructions and sequence for laying and fixing are followed

3.2

Underfloor pads are laid according to manufacturer recommendations

3.3

Timber flooring is laid out to meet directional sequence, pattern match, specification requirements, and to minimise waste and joins as appropriate

3.4

The aesthetics of the materials are maximised, including matching grains and colours

3.5

Timber flooring is accurately and clearly marked for cutting

3.6

Timber flooring is cut to length and size for final laying to provide appropriate size and shape ensuring minimum waste

3.7

Materials for fixing are organised and used in accordance with relevant safety management requirements

4

Lay sprung timber flooring

4.1

Instructions and sequence for laying and fixing are followed

4.2

Materials for fixing are organised and used in accordance with relevant safety management requirements

4.3

Fixing methods and equipment are used following manufacturer recommendations

4.4

Appropriate field and perimeter expansion joints are allowed

4.5

Skirting boards or cover trims are fitted/re-fitted and finished

4.6

Finished job is inspected and any imperfections are rectified following workplace procedures

5

Complete housekeeping

5.1

Unused materials are stored or recycled as required

5.2

Tools and equipment are cleaned and stored appropriately

5.3

Work area is cleaned and rubbish disposed of appropriately

5.4

Workplace documentation is completed

Interpret work order and locate and apply relevant information

Apply safe handling requirements for equipment, products and materials, including use of personal protective equipment

Identify materials used in the work process

Follow work instructions, operating procedures and inspection processes to:

minimise the risk of injury to self or others

prevent damage to goods, equipment and products

maintain required production output and product quality

Complete a minimum of one (1) type of sprung timber sports floor installation

Use mathematical ideas and techniques to correctly complete measurements, calculate area and estimate material requirements

Communicate ideas and information to enable confirmation of work requirements and specifications and the reporting of work outcomes and problems, interpret basic plans and follow safety procedures

Avoid backtracking, work flow interruptions or wastage

Work with others and in a team by recognising dependencies and using cooperative approaches to optimise work flow and productivity

State or territory WHS legislation, regulations, standards and codes of practice relevant to installation of sprung timber sports flooring

Organisational and site standards, requirements, policies and procedures for the installation of sprung timber sports flooring

Environmental protection requirements

Types and uses of tools and equipment used during the installation of sprung timber sports flooring

Workplace safety system requirements relevant to the installation of sprung timber sports flooring

Work flow in relation to the laying of sprung timber sports flooring

Appropriate mathematical procedures for estimation and measurement

Procedures for the recording, reporting and maintenance of workplace records and information

Types, characteristics, uses and limitations of:

sprung timber sports flooring

installation adhesives

underfloor pads

Basic wood working techniques relevant to the installation of sprung timber sports flooring

Characteristics and requirements of sub-floor preparation

Work flow in relation to flooring installation operations

Range Statement

Specifies different work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Range is restricted to essential operating conditions and any other variables essential to the work environment.

Unit context includes:

WHS requirements, including legislation, building codes, material safety management systems, hazardous and dangerous goods codes, and local safe operating procedures or equivalent

work is carried out in accordance with legislative obligations, environmental legislation, relevant health regulations, manual handling procedures and organisation insurance requirements

work requires individuals to demonstrate some discretion, judgement and problem solving

Sprung timber flooring includes:

strip tongue and groove

parquetry floating floors

manufactured engineered flooring used for indoor sporting applications

Adhesives include:

polyvinyl alcohol (PVA)

polyurethane elastomeric

Tools and equipment include:

drop saw

jig saw

hand saw

undercut saw

hammer

bar scriber

utility knife

and may include:

circular saw

bench saw

straight edge

cramps

clamps

staple gun

secret nailer

roller

sanding machines (drum, belt and rotary)

edger

Materials include:

flooring materials

underlay

edge strips

tapes

adhesives

underfloor pads

ventilated skirtings

Underfloor pads include:

rubber

neoprene

Personal protective equipment includes:

that prescribed under legislation, regulations and enterprise policies and practices

Information and procedures include:

workplace procedures relating to the use of tools and equipment

work instructions, including job sheets, cutting lists, plans, drawings and designs

workplace procedures relating to reporting and communication

manufacturer specifications and operational procedures