Evidence Guide: MSFFL3083 - Install patterned and mosaic parquetry flooring

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

MSFFL3083 - Install patterned and mosaic parquetry flooring

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare for work

  1. Identify and follow work health and safety, legislative and organisational requirements
  2. Correctly identify work requirements and process from review of documentation
  3. Confirm subfloor suitability for installation consistent with Australian Standards and manufacturer recommendations
  4. Select and check tools, equipment and materials prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition
  5. Remove or undercut skirting boards or cover trims, and store for re-fitting in accordance with work requirements
  6. Plan sequence of work, and starting point, to ensure efficiency and quality of installation
Identify and follow work health and safety, legislative and organisational requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Correctly identify work requirements and process from review of documentation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm subfloor suitability for installation consistent with Australian Standards and manufacturer recommendations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and check tools, equipment and materials prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Remove or undercut skirting boards or cover trims, and store for re-fitting in accordance with work requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan sequence of work, and starting point, to ensure efficiency and quality of installation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set out mosaic parquetry flooring

  1. Inspect timber flooring material and confirm species, grade, size and quantity against work orders
  2. Moisture check timber using required equipment and confirm suitability of moisture content for site conditions as per pre-site inspection procedures
  3. Organise block parquetry flooring for fixing and use in accordance with safety management requirements
  4. Prepare required adhesives and edge strips in accordance with manufacturer instructions
  5. Accurately measure area to be covered and establish working lines and starting point
Inspect timber flooring material and confirm species, grade, size and quantity against work orders

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Moisture check timber using required equipment and confirm suitability of moisture content for site conditions as per pre-site inspection procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Organise block parquetry flooring for fixing and use in accordance with safety management requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare required adhesives and edge strips in accordance with manufacturer instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Accurately measure area to be covered and establish working lines and starting point

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Lay out and cut parquetry mosaic fingers

  1. Follow instructions and sequence for laying and fixing
  2. Lay appropriate underlay in accordance with manufacturer recommendations
  3. Lay out block parquetry flooring to meet directional sequence, pattern match, specification requirements, minimising waste and joins
  4. Maximise the aesthetics of the materials, including matching grains and colours
  5. Accurately and clearly mark parquetry fingers or panels for cutting
  6. Cut parquetry fingers or panels to provide appropriate size and shape ensuring minimum waste
Follow instructions and sequence for laying and fixing

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Lay appropriate underlay in accordance with manufacturer recommendations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Lay out block parquetry flooring to meet directional sequence, pattern match, specification requirements, minimising waste and joins

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maximise the aesthetics of the materials, including matching grains and colours

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Accurately and clearly mark parquetry fingers or panels for cutting

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cut parquetry fingers or panels to provide appropriate size and shape ensuring minimum waste

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install parquetry

  1. Use required adhesives and edge strips and/or accessories in accordance with manufacturer instructions
  2. Follow manufacturer recommendations for fixing methods and equipment
  3. Install and fix parquetry to produce required pattern
  4. Allow appropriate field and perimeter expansion joints
  5. Fit and/or re-fit skirting boards or cover trims and finish
  6. Inspect finished job and rectify any imperfections following workplace procedures
Use required adhesives and edge strips and/or accessories in accordance with manufacturer instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Follow manufacturer recommendations for fixing methods and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install and fix parquetry to produce required pattern

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Allow appropriate field and perimeter expansion joints

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fit and/or re-fit skirting boards or cover trims and finish

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect finished job and rectify any imperfections following workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete housekeeping

  1. Store and recycle unused materials in accordance with workplace procedures
  2. Check, clean and store tools and equipment in accordance with workplace procedures
  3. Clean work area and dispose of rubbish safely
  4. Accurately complete required workplace documentation
  5. Identify and follow work health and safety, legislative and organisational requirements
  6. Correctly identify work requirements and process from review of documentation
  7. Confirm subfloor suitability for installation consistent with Australian Standards and manufacturer recommendations
  8. Select and check tools, equipment and materials prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition
  9. Remove or undercut skirting boards or cover trims, and store for re-fitting in accordance with work requirements
  10. Plan sequence of work, and starting point, to ensure efficiency and quality of installation
Store and recycle unused materials in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check, clean and store tools and equipment in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean work area and dispose of rubbish safely

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Accurately complete required workplace documentation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and follow work health and safety, legislative and organisational requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Correctly identify work requirements and process from review of documentation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm subfloor suitability for installation consistent with Australian Standards and manufacturer recommendations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and check tools, equipment and materials prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Remove or undercut skirting boards or cover trims, and store for re-fitting in accordance with work requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan sequence of work, and starting point, to ensure efficiency and quality of installation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 