NTISthis.com

Evidence Guide: MSFFL3088 - Install timber flooring to joists

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

MSFFL3088 - Install timber flooring to joists

What evidence can you provide to prove your understanding of each of the following citeria?

Determine job requirements

  1. Follow standard operating procedures (SOPs)
  2. Comply with work health and safety requirements at all times
  3. Use appropriate personal protective equipment (PPE) in accordance with SOPs
  4. Identify job requirements from plans, specifications, drawings, quality requirements and operational details
  5. Confirm subfloor suitability for installation consistent with Australian Standards and manufacturer recommendations
  6. Identify and implement signage and/or barricade requirements
  7. Inspect subfloor and joists for flatness and structural integrity and correct as required in accordance with SOPs
  8. Inspect timber flooring material and confirm species, grade, size and quantity against work orders
  9. Moisture check timber using required equipment and confirm suitability of moisture content for site conditions as per pre-site inspection procedures
  10. Set out and plan installation method in accordance with job requirements
  11. Prepare materials in accordance with client specifications
Follow standard operating procedures (SOPs)

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Comply with work health and safety requirements at all times

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Use appropriate personal protective equipment (PPE) in accordance with SOPs

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify job requirements from plans, specifications, drawings, quality requirements and operational details

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm subfloor suitability for installation consistent with Australian Standards and manufacturer recommendations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and implement signage and/or barricade requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect subfloor and joists for flatness and structural integrity and correct as required in accordance with SOPs

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect timber flooring material and confirm species, grade, size and quantity against work orders

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Moisture check timber using required equipment and confirm suitability of moisture content for site conditions as per pre-site inspection procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set out and plan installation method in accordance with job requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare materials in accordance with client specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install timber flooring

  1. Select appropriate flooring materials for the intended use according to specifications
  2. Confirm floor measurements and flooring materials to ensure minimum waste and prepare for installation
  3. Install flooring, as specified by the client, using suppliers recommended products ensuring product is installed and secured to manufacturer recommendations, industry and Australian Standards
  4. Complete installed flooring in preparation for sanding and finishing
Select appropriate flooring materials for the intended use according to specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm floor measurements and flooring materials to ensure minimum waste and prepare for installation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install flooring, as specified by the client, using suppliers recommended products ensuring product is installed and secured to manufacturer recommendations, industry and Australian Standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete installed flooring in preparation for sanding and finishing

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete housekeeping

  1. Store and recycle unused materials in accordance with workplace procedures
  2. Check, clean and store tools and equipment in accordance with workplace procedures
  3. Clean work area and dispose of rubbish safely
  4. Accurately complete required workplace documentation
Store and recycle unused materials in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check, clean and store tools and equipment in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean work area and dispose of rubbish safely

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Accurately complete required workplace documentation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge