Evidence Guide: MSFFL3117 - Install mosaic and panel parquetry flooring

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

MSFFL3117 - Install mosaic and panel parquetry flooring

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare to install mosaic and panel parquetry flooring

  1. Interpret mosaic and panel parquetry flooring installation requirements from job and manufacturer instructions and calculate the quantities of materials required
  2. Identify hazards relating to the work site, work practices, materials, tools and equipment, and check risk treatments are in place and operating
  3. Select and check all required tools and equipment are ready to use, and organise to fix any deficiencies according to workplace procedures
  4. Gather the parquetry flooring material and confirm its species, grade, size, quantity and quality against job instructions
  5. Check and confirm the parquetry flooring material’s moisture content is suitable for site conditions according to workplace procedures
  6. Gather adhesives, trims and other materials required by job instructions, and check they meet quality requirements and are prepared and ready to install according to the manufacturer instructions, product labels, safety data sheets and workplace procedures
Interpret mosaic and panel parquetry flooring installation requirements from job and manufacturer instructions and calculate the quantities of materials required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify hazards relating to the work site, work practices, materials, tools and equipment, and check risk treatments are in place and operating

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and check all required tools and equipment are ready to use, and organise to fix any deficiencies according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Gather the parquetry flooring material and confirm its species, grade, size, quantity and quality against job instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check and confirm the parquetry flooring material’s moisture content is suitable for site conditions according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Gather adhesives, trims and other materials required by job instructions, and check they meet quality requirements and are prepared and ready to install according to the manufacturer instructions, product labels, safety data sheets and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install moisture vapour barrier and underlay

  1. Confirm the subfloor is clean and suitable for installing the moisture vapour barrier and parquetry, and fix or report any deficiencies according to workplace procedures
  2. Remove or undercut door jambs, cover trims and other joinery, and store for refitting or send for machining according to job instructions
  3. Fasten the moisture vapour barrier according to manufacturer instructions
  4. Measure, mark and cut underlay to length and size to minimise waste
  5. Fasten underlay according to workplace procedures and manufacturer instructions
  6. Finish installing underlay to meet quality requirements
Confirm the subfloor is clean and suitable for installing the moisture vapour barrier and parquetry, and fix or report any deficiencies according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Remove or undercut door jambs, cover trims and other joinery, and store for refitting or send for machining according to job instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fasten the moisture vapour barrier according to manufacturer instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Measure, mark and cut underlay to length and size to minimise waste

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fasten underlay according to workplace procedures and manufacturer instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Finish installing underlay to meet quality requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cut, fit and fasten mosaic and panel parquetry flooring

  1. Establish the starting point and mark out working lines
  2. Lay out the parquetry flooring according to job instructions to maximise aesthetics with respect to material colours, grains and patterns, to minimise waste, and to ensure an efficient, quality installation
  3. Measure, mark and cut parquetry fingers or panels as required
  4. Apply adhesive to the substrate according to the according to the manufacturer instructions, product labels, safety data sheets and workplace procedures
  5. Install the parquetry flooring according to the manufacturer instructions, allowing appropriate intermediate and perimeter expansion joints
  6. Install finishing strips appropriate for the type of subfloor, refit removed items and finish installing the flooring
  7. Check the parquetry flooring is installed correctly according to job instructions and quality requirements, and fix any deficiencies
  8. Make any necessary preparations for sanding the parquetry flooring according to job instructions
Establish the starting point and mark out working lines

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Lay out the parquetry flooring according to job instructions to maximise aesthetics with respect to material colours, grains and patterns, to minimise waste, and to ensure an efficient, quality installation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Measure, mark and cut parquetry fingers or panels as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Apply adhesive to the substrate according to the according to the manufacturer instructions, product labels, safety data sheets and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install the parquetry flooring according to the manufacturer instructions, allowing appropriate intermediate and perimeter expansion joints

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install finishing strips appropriate for the type of subfloor, refit removed items and finish installing the flooring

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check the parquetry flooring is installed correctly according to job instructions and quality requirements, and fix any deficiencies

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Make any necessary preparations for sanding the parquetry flooring according to job instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete the task according to workplace procedures

  1. Clean up the work area, identify items for recycling and dispose of waste
  2. Identify, tag and report any damage to equipment and tools
  3. Check, clean and do routine maintenance on equipment and tools and store them and unused materials
  4. Complete task outcome documentation
Clean up the work area, identify items for recycling and dispose of waste

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, tag and report any damage to equipment and tools

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check, clean and do routine maintenance on equipment and tools and store them and unused materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete task outcome documentation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge