Evidence Guide: MSFFT4005 - Install and commission computer numerically controlled (CNC) software

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

MSFFT4005 - Install and commission computer numerically controlled (CNC) software

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare for software installation

  1. Program format and operational intent is accurately determined and required applications identified
  2. Specifications are checked for required operating conditions
  3. Program instructions are checked for compliance with specifications
  4. Software timers are set to specification where required
Program format and operational intent is accurately determined and required applications identified

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Specifications are checked for required operating conditions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Program instructions are checked for compliance with specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Software timers are set to specification where required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install automatic process machine control program

  1. Appropriate program loading technique is selected
  2. External loading devices are correctly connected to automatic process machine control systems
  3. Machine control system is placed in correct operational mode to accept program loading
  4. Program is downloaded in accordance with manufacturer recommended procedures and enterprise requirements
  5. Checks are made during and after downloading to ensure accurate and complete data transfer
  6. External program loading devices and connections are disconnected from process and machine control system
Appropriate program loading technique is selected

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

External loading devices are correctly connected to automatic process machine control systems

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Machine control system is placed in correct operational mode to accept program loading

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Program is downloaded in accordance with manufacturer recommended procedures and enterprise requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Checks are made during and after downloading to ensure accurate and complete data transfer

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

External program loading devices and connections are disconnected from process and machine control system

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Commission automatic process and machine control program

  1. Operation of the equipment using the program is observed
  2. Outputs are checked and measured for compliance with specifications
  3. External inputs are checked for compliance with specifications according to specified procedures
  4. Total operation is checked for compliance with specifications where applicable
  5. Location of program master copy storage is confirmed
Operation of the equipment using the program is observed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Outputs are checked and measured for compliance with specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

External inputs are checked for compliance with specifications according to specified procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Total operation is checked for compliance with specifications where applicable

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Location of program master copy storage is confirmed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Prepare for software installation

1.1

Program format and operational intent is accurately determined and required applications identified

1.2

Specifications are checked for required operating conditions

1.3

Program instructions are checked for compliance with specifications

1.4

Software timers are set to specification where required

2

Install automatic process machine control program

2.1

Appropriate program loading technique is selected

2.2

External loading devices are correctly connected to automatic process machine control systems

2.3

Machine control system is placed in correct operational mode to accept program loading

2.4

Program is downloaded in accordance with manufacturer recommended procedures and enterprise requirements

2.5

Checks are made during and after downloading to ensure accurate and complete data transfer

2.6

External program loading devices and connections are disconnected from process and machine control system

3

Commission automatic process and machine control program

3.1

Operation of the equipment using the program is observed

3.2

Outputs are checked and measured for compliance with specifications

3.3

External inputs are checked for compliance with specifications according to specified procedures

3.4

Total operation is checked for compliance with specifications where applicable

3.5

Location of program master copy storage is confirmed

Required Skills and Knowledge

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Prepare for software installation

1.1

Program format and operational intent is accurately determined and required applications identified

1.2

Specifications are checked for required operating conditions

1.3

Program instructions are checked for compliance with specifications

1.4

Software timers are set to specification where required

2

Install automatic process machine control program

2.1

Appropriate program loading technique is selected

2.2

External loading devices are correctly connected to automatic process machine control systems

2.3

Machine control system is placed in correct operational mode to accept program loading

2.4

Program is downloaded in accordance with manufacturer recommended procedures and enterprise requirements

2.5

Checks are made during and after downloading to ensure accurate and complete data transfer

2.6

External program loading devices and connections are disconnected from process and machine control system

3

Commission automatic process and machine control program

3.1

Operation of the equipment using the program is observed

3.2

Outputs are checked and measured for compliance with specifications

3.3

External inputs are checked for compliance with specifications according to specified procedures

3.4

Total operation is checked for compliance with specifications where applicable

3.5

Location of program master copy storage is confirmed

Collect, organise and understand information related to multi-trade work instructions and work orders, building and structural plans and safety procedures

Apply safe handling requirements for equipment, products and materials, including use of personal protective equipment

Identify materials used in the work process

Follow work instructions, operating procedures and inspection processes to:

minimise the risk of injury to self or others

prevent damage to goods, equipment and products

maintain required production output and product quality

Install and commission CNC software on at least two (2) different machines and:

identify requirements of tasks and organise work to achieve goals and results

select and install software programs for the CNC equipment

select and apply appropriate loading techniques

check and adjust machine operations and programming

suggest improvements

Use mathematical ideas and techniques to correctly complete measurements, calculate area and estimate material requirements

Communicate ideas and information to enable confirmation of work requirements and specifications and the reporting of work outcomes and problems, interpret basic plans and follow safety procedures

Use workplace technology related to the coordination, including communication equipment, time and management aids and other measuring devices

Avoid backtracking, work flow interruptions or wastage

Work with others and in a team by recognising dependencies and using cooperative approaches to optimise work flow and productivity

Computer science theory relevant to CNC machine operation

CNC control system characteristics, applications and limitations

Procedures and techniques for programming CNC equipment

Operation requirements of equipment and work systems to be programmed

Range Statement

Specifies different work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Range is restricted to essential operating conditions and any other variables essential to the work environment.

Unit context includes:

work health and safety (WHS) requirements, including legislation, building codes, material safety management systems, hazardous and dangerous goods codes, and local safe operating procedures or equivalent

work is carried out in accordance with legislative obligations, environmental legislation, relevant health regulations, manual handling procedures and organisation insurance requirements

work requires individuals to demonstrate analytical and organisational ability, judgement and problem solving

work involves individual and team-related activities in workplaces where the CNC equipment is either new or being substantially upgraded

work is performed without other qualified assistance

customers are normally internal

Machines requiring CNC software installation and commission include:

individual production/manufacturing or treatment machines

processing and machining centres

Personal protective equipment includes:

that prescribed under legislation, regulations and enterprise policies and practices

Information and procedures include:

manufacturer specifications and instructions

procedures for installing and commissioning CNC programs

organisation work specifications and requirements

legislation/regulation/national and industry codes and practices relevant to the installation and commissioning

quality and Australian Standards and procedures