NTISthis.com

Evidence Guide: MSFGG3016 - Fabricate and install residential windows and doors

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

MSFGG3016 - Fabricate and install residential windows and doors

What evidence can you provide to prove your understanding of each of the following citeria?

Identify work requirements

  1. Work requirements in the form of type of residential window or residential door to be fabricated and installed are identified from work instructions, including the identification of its pattern or plan
  2. Work health and safety (WHS) requirements for fabrication and installation of windows and doors, including personal protective equipment, are observed throughout the work
  3. The process for fabricating and installing windows and doors is identified
  4. Types and quantities of materials, including glass required, are calculated from plans or work instructions or by measuring the fixture opening in accordance with Australian Standards and industry practice
  5. Cutting lists are prepared from plans, work instructions or measurements of opening to suit the window or door to be installed
  6. Fittings, fixings and joining devices or materials are selected in accordance with specifications or type of materials to be joined or fixed and Australian Standards
  7. Tools and equipment appropriate to the fixing method are identified
Work requirements in the form of type of residential window or residential door to be fabricated and installed are identified from work instructions, including the identification of its pattern or plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work health and safety (WHS) requirements for fabrication and installation of windows and doors, including personal protective equipment, are observed throughout the work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

The process for fabricating and installing windows and doors is identified

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Types and quantities of materials, including glass required, are calculated from plans or work instructions or by measuring the fixture opening in accordance with Australian Standards and industry practice

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cutting lists are prepared from plans, work instructions or measurements of opening to suit the window or door to be installed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fittings, fixings and joining devices or materials are selected in accordance with specifications or type of materials to be joined or fixed and Australian Standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools and equipment appropriate to the fixing method are identified

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare for work

  1. Work sequence is determined in a logical order to suit the job and workplace procedures
  2. Tools, equipment and materials are selected and checked prior to use to ensure they are appropriate for the work, serviceable and in a safe condition
  3. Components of the window or door and hardware are checked against specifications or job order for size, quantity, finish and profile
Work sequence is determined in a logical order to suit the job and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools, equipment and materials are selected and checked prior to use to ensure they are appropriate for the work, serviceable and in a safe condition

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Components of the window or door and hardware are checked against specifications or job order for size, quantity, finish and profile

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fabricate and install window or door

  1. Materials are measured and marked to cutting list requirements and most economical use of materials
  2. Materials are cut to cutting list requirements in accordance with workplace procedures or industry practice
  3. Metal, timber or uPVC components of the window or door are assembled in accordance with recognised industry standards
  4. Fittings are installed to window or door in accordance with workplace procedures or industry practice
  5. Window or door is installed in opening using appropriate fixing method in accordance with recognised industry standard
Materials are measured and marked to cutting list requirements and most economical use of materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Materials are cut to cutting list requirements in accordance with workplace procedures or industry practice

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Metal, timber or uPVC components of the window or door are assembled in accordance with recognised industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fittings are installed to window or door in accordance with workplace procedures or industry practice

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Window or door is installed in opening using appropriate fixing method in accordance with recognised industry standard

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete work

  1. Installed window or door is inspected for quality of work and repaired, re-fabricated or reinstalled, as required, in accordance with workplace procedures
  2. Material which can be re-used is collected and stored
  3. Waste and scrap material are removed for disposal or recycling, as required
  4. Work area is cleaned and rubbish disposed of, as appropriate
  5. Tools, equipment and unused materials are cleaned and removed and stored appropriately
  6. Workplace documentation is completed in accordance with workplace requirements, including calculating the cost of glass, fittings, materials and labour
Installed window or door is inspected for quality of work and repaired, re-fabricated or reinstalled, as required, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Material which can be re-used is collected and stored

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Waste and scrap material are removed for disposal or recycling, as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work area is cleaned and rubbish disposed of, as appropriate

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools, equipment and unused materials are cleaned and removed and stored appropriately

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Workplace documentation is completed in accordance with workplace requirements, including calculating the cost of glass, fittings, materials and labour

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Identify work requirements

1.1

Work requirements in the form of type of residential window or residential door to be fabricated and installed are identified from work instructions, including the identification of its pattern or plan

1.2

Work health and safety (WHS) requirements for fabrication and installation of windows and doors, including personal protective equipment, are observed throughout the work

1.3

The process for fabricating and installing windows and doors is identified

1.4

Types and quantities of materials, including glass required, are calculated from plans or work instructions or by measuring the fixture opening in accordance with Australian Standards and industry practice

1.5

Cutting lists are prepared from plans, work instructions or measurements of opening to suit the window or door to be installed

1.6

Fittings, fixings and joining devices or materials are selected in accordance with specifications or type of materials to be joined or fixed and Australian Standards

1.7

Tools and equipment appropriate to the fixing method are identified

2

Prepare for work

2.1

Work sequence is determined in a logical order to suit the job and workplace procedures

2.2

Tools, equipment and materials are selected and checked prior to use to ensure they are appropriate for the work, serviceable and in a safe condition

2.3

Components of the window or door and hardware are checked against specifications or job order for size, quantity, finish and profile

3

Fabricate and install window or door

3.1

Materials are measured and marked to cutting list requirements and most economical use of materials

3.2

Materials are cut to cutting list requirements in accordance with workplace procedures or industry practice

3.3

Metal, timber or uPVC components of the window or door are assembled in accordance with recognised industry standards

3.4

Fittings are installed to window or door in accordance with workplace procedures or industry practice

3.5

Window or door is installed in opening using appropriate fixing method in accordance with recognised industry standard

4

Complete work

4.1

Installed window or door is inspected for quality of work and repaired, re-fabricated or reinstalled, as required, in accordance with workplace procedures

4.2

Material which can be re-used is collected and stored

4.3

Waste and scrap material are removed for disposal or recycling, as required

4.4

Work area is cleaned and rubbish disposed of, as appropriate

4.5

Tools, equipment and unused materials are cleaned and removed and stored appropriately

4.6

Workplace documentation is completed in accordance with workplace requirements, including calculating the cost of glass, fittings, materials and labour

Required Skills and Knowledge

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Identify work requirements

1.1

Work requirements in the form of type of residential window or residential door to be fabricated and installed are identified from work instructions, including the identification of its pattern or plan

1.2

Work health and safety (WHS) requirements for fabrication and installation of windows and doors, including personal protective equipment, are observed throughout the work

1.3

The process for fabricating and installing windows and doors is identified

1.4

Types and quantities of materials, including glass required, are calculated from plans or work instructions or by measuring the fixture opening in accordance with Australian Standards and industry practice

1.5

Cutting lists are prepared from plans, work instructions or measurements of opening to suit the window or door to be installed

1.6

Fittings, fixings and joining devices or materials are selected in accordance with specifications or type of materials to be joined or fixed and Australian Standards

1.7

Tools and equipment appropriate to the fixing method are identified

2

Prepare for work

2.1

Work sequence is determined in a logical order to suit the job and workplace procedures

2.2

Tools, equipment and materials are selected and checked prior to use to ensure they are appropriate for the work, serviceable and in a safe condition

2.3

Components of the window or door and hardware are checked against specifications or job order for size, quantity, finish and profile

3

Fabricate and install window or door

3.1

Materials are measured and marked to cutting list requirements and most economical use of materials

3.2

Materials are cut to cutting list requirements in accordance with workplace procedures or industry practice

3.3

Metal, timber or uPVC components of the window or door are assembled in accordance with recognised industry standards

3.4

Fittings are installed to window or door in accordance with workplace procedures or industry practice

3.5

Window or door is installed in opening using appropriate fixing method in accordance with recognised industry standard

4

Complete work

4.1

Installed window or door is inspected for quality of work and repaired, re-fabricated or reinstalled, as required, in accordance with workplace procedures

4.2

Material which can be re-used is collected and stored

4.3

Waste and scrap material are removed for disposal or recycling, as required

4.4

Work area is cleaned and rubbish disposed of, as appropriate

4.5

Tools, equipment and unused materials are cleaned and removed and stored appropriately

4.6

Workplace documentation is completed in accordance with workplace requirements, including calculating the cost of glass, fittings, materials and labour

Interpret work order and locate and apply relevant information

Apply safe handling requirements for equipment, products and materials, including use of personal protective equipment

Identify materials used in the work process

Follow work instructions, operating procedures and inspection processes to:

minimise the risk of injury to self or others

prevent damage to goods, equipment and products

maintain required production output and product quality

Measure for the installation of windows and doors and plan work from product specification data sheets and/or specified software programs

Identify and select product materials, including selection of mullions and transoms in relation to wind loading

Fabricate frame and sash components from metal and uPVC, including cutting, tooling, routing, milling, drilling and/or crimping

Identify, select and install component hardware, including weather seals, wheels, stays, hinges, guides and/or locks

Apply the WERS

Select and cut glass in accordance with AS 1288:2006 Glass in buildings - Selection and installation and AS/NZS 4667:2000 Quality requirements for cut-to-size and processed glass

Assemble frames, including glass, gaskets, tapes, sealants, adhesives, fasteners, reveal linings and flashings in accordance with AS 2047:2014 Windows in buildings - Selection and installation (Section 6)

Label frames in accordance with AS 2047:2014 Windows in buildings - Selection and installation (Section 8) and AS/NZS 4668:2000 Glossary of terms used in the glass and glazing industry

Note, wherever Australia Standards are listed they apply at the time of publication, but the most current version (including amendments) or replacement versions are to be used.

Install residential windows and doors

Calculate cost of residential windows and doors

Use mathematical ideas and techniques to correctly complete measurements, calculate area and estimate material requirements

Communicate ideas and information to enable confirmation of work requirements and specifications and the reporting of work outcomes and problems, interpret basic plans and follow safety procedures

Avoid backtracking, work flow interruptions or wastage

Work with others and in a team by recognising dependencies and using cooperative approaches to optimise work flow and productivity

Work flow requirements in relation to the fabrication and installation of windows and doors

Characteristics of glass and framing materials used and uses of products produced

Workplace safety system requirements related to the fabrication and installation of windows and doors

Correct identification of equipment, processes and procedures

AS 1288:2006 Glass in buildings - Selection and installation

AS/NZS 4667:2000 Quality requirements for cut-to-size and processed glass

AS 2047:2014 Windows in buildings - Selection and installation (Section 6)

AS 2047:2014 Windows in buildings - Selection and installation (Section 8)

AS/NZS 4668:2000 Glossary of terms used in the glass and glazing industry

Note, wherever Australia Standards are listed they apply at the time of publication, but the most current version (including amendments) or replacement versions are to be used.

Range Statement

Specifies different work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Range is restricted to essential operating conditions and any other variables essential to the work environment.

Unit context includes:

WHS requirements, including legislation, building codes, material safety management systems, hazardous and dangerous goods codes, and local safe operating procedures or equivalent

work is carried out in accordance with legislative obligations, environmental legislation, relevant health regulations, manual handling procedures and organisation insurance requirements

work requires individuals to demonstrate some discretion, judgement and problem solving

Residential windows include:

aluminium or steel sliding

timber or uPVC framed

double hung

casement and awning windows

louvre windows

double glazed windows

Residential doors include:

aluminium or steel sliding

timber framed

hinged

bi-fold doors

Tools and equipment include:

assembly benches

hand, drop and up-cut saws

pneumatic equipment

hydraulic and manual presses

frame and sash tooling

copy routers

end millers

crimpers

electric and pneumatic powered drills and screwdrivers

pop rivet guns

heat guns for uPVC

glue guns

general hand tools

Materials include:

aluminium alloys and steel

uPVC

hardware

fasteners (screws, pop rivets and knock-downs)

plastics

sealants

tapes

gaskets

flashings

timber

timber reveals

Glass includes:

annealed glass

safety glass

patterned glass

tinted

heat reflective

insulated glass units (IGU)

Hardware includes:

locks

wheels

stays

hinges

springs and balances and any component required for the operation of residential windows

Personal protective equipment includes:

that prescribed under legislation, regulation and enterprise policies and practices:

gauntlets

gloves

safety glasses

hard hats

safety footwear

aprons and overalls

Information and procedures include:

workplace procedures relating to the use of tools and equipment and personal protective equipment

work instructions, including job sheets, cutting lists, plans, drawings and designs

workplace procedures relating to reporting and communication

manufacturer specifications and operational procedures

Australian Standards:

AS 2047:2014 Windows in buildings - Selection and installation; section 6 regarding construction and section 8 on labelling and certification of glass installations

AS 1288:2006 Glass in buildings - Selection and installation

AS/NZS 4667:2000 Quality requirements for cut-to-size and processed glass

AS/NZS 4666:2012 Insulating glass units

AS/NZS 4668:2000 Glossary of terms used in the glass and glazing industry

Note, wherever Australia Standards are listed they apply at the time of publication, but the most current version (including amendments) or replacement versions are to be used.

the Window Energy Rating System (WERS)