Evidence Guide: MSMPMC300 - Produce structural precast concrete

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

MSMPMC300 - Produce structural precast concrete

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare mould for casting

  1. Check casting schedule and job specification
  2. Clean and oil moulds according to requirements
  3. Check for mould damage and repair
Check casting schedule and job specification

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean and oil moulds according to requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check for mould damage and repair

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assemble reinforcement cage

  1. Lift preassembled reinforcing sections into mould safely
  2. Assemble additional steel to complete cage to drawings and job specification
  3. Fit additional items, including base plates, tie plates and lifting devices, according to work instructions
  4. Fit hold-ups and hold-downs as appropriate
  5. Place voids or ducts according to work specifications
  6. Run pre-stressing strands through reinforcing cages
  7. Set up guards and comply with WHS requirements for stressing
  8. Tension strands to extension dimensions and/or gauge readings according to works or engineer instructions
  9. Recheck reinforcing cage is in correct position and adjust as necessary
Lift preassembled reinforcing sections into mould safely

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assemble additional steel to complete cage to drawings and job specification

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fit additional items, including base plates, tie plates and lifting devices, according to work instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fit hold-ups and hold-downs as appropriate

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Place voids or ducts according to work specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Run pre-stressing strands through reinforcing cages

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set up guards and comply with WHS requirements for stressing

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tension strands to extension dimensions and/or gauge readings according to works or engineer instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Recheck reinforcing cage is in correct position and adjust as necessary

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Close mould and test vibrators

  1. Lift mould sides and additional parts into position and secure to specification
  2. Fit any additional items
  3. Fit vibrators to start positions
  4. Test run before casting commences
Lift mould sides and additional parts into position and secure to specification

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fit any additional items

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fit vibrators to start positions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Test run before casting commences

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Pour concrete

  1. Begin casting in accordance with work instructions
  2. Move vibrators and time vibration
  3. Screed top surface flat in preparation for final finish
  4. Patch product
  5. Clean mould and worksite in accordance with WHS requirements
Begin casting in accordance with work instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Move vibrators and time vibration

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Screed top surface flat in preparation for final finish

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Patch product

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean mould and worksite in accordance with WHS requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Control concrete quality

  1. Test raw materials
  2. Prepare test cylinders and samples
  3. Monitor and control concrete mix to keep within specifications
  4. Update all records and file all records and supplier certificates in appropriate place
  5. Raise non-conformance reports
Test raw materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare test cylinders and samples

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor and control concrete mix to keep within specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Update all records and file all records and supplier certificates in appropriate place

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Raise non-conformance reports

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cure product

  1. Cover and cure mould and test cylinders in accordance with standard procedures and work instructions
  2. Monitor curing to achieve specified stripping strength
Cover and cure mould and test cylinders in accordance with standard procedures and work instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor curing to achieve specified stripping strength

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Strip and store product

  1. Test samples to ensure specific strength has been achieved
  2. Remove mould sides and store ready for cleaning
  3. De-stress in accordance with work procedures and sequences
  4. Lift unit according to work instructions and move to store, supported only on points designated on the drawings
Test samples to ensure specific strength has been achieved

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Remove mould sides and store ready for cleaning

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

De-stress in accordance with work procedures and sequences

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Lift unit according to work instructions and move to store, supported only on points designated on the drawings

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Respond to problems

  1. Identify routine and non-routine problems in the equipment or process
  2. Rectify problems using appropriate solution within area of responsibility
  3. Report problems outside area of responsibility to designated person
Identify routine and non-routine problems in the equipment or process

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Rectify problems using appropriate solution within area of responsibility

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Report problems outside area of responsibility to designated person

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Control hazards

  1. Identify structural precast and pre-stressed concrete production hazards
  2. Assess the risks arising from those hazards
  3. Implement measures to control those risks
Identify structural precast and pre-stressed concrete production hazards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assess the risks arising from those hazards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Implement measures to control those risks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge