The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare mould for casting
|
|
Check casting schedule and job specification Completed |
Evidence:
|
Clean and oil moulds according to requirements Completed |
Evidence:
|
Check for mould damage and repair Completed |
Evidence:
|
Assemble reinforcement cage
|
|
Lift preassembled reinforcing sections into mould safely Completed |
Evidence:
|
Assemble additional steel to complete cage to drawings and job specification Completed |
Evidence:
|
Fit additional items, including base plates, tie plates and lifting devices, according to work instructions Completed |
Evidence:
|
Fit hold-ups and hold-downs as appropriate Completed |
Evidence:
|
Place voids or ducts according to work specifications Completed |
Evidence:
|
Run pre-stressing strands through reinforcing cages Completed |
Evidence:
|
Set up guards and comply with WHS requirements for stressing Completed |
Evidence:
|
Tension strands to extension dimensions and/or gauge readings according to works or engineer instructions Completed |
Evidence:
|
Recheck reinforcing cage is in correct position and adjust as necessary Completed |
Evidence:
|
Close mould and test vibrators
|
|
Lift mould sides and additional parts into position and secure to specification Completed |
Evidence:
|
Fit any additional items Completed |
Evidence:
|
Fit vibrators to start positions Completed |
Evidence:
|
Test run before casting commences Completed |
Evidence:
|
Pour concrete
|
|
Begin casting in accordance with work instructions Completed |
Evidence:
|
Move vibrators and time vibration Completed |
Evidence:
|
Screed top surface flat in preparation for final finish Completed |
Evidence:
|
Patch product Completed |
Evidence:
|
Clean mould and worksite in accordance with WHS requirements Completed |
Evidence:
|
Control concrete quality
|
|
Test raw materials Completed |
Evidence:
|
Prepare test cylinders and samples Completed |
Evidence:
|
Monitor and control concrete mix to keep within specifications Completed |
Evidence:
|
Update all records and file all records and supplier certificates in appropriate place Completed |
Evidence:
|
Raise non-conformance reports Completed |
Evidence:
|
Cure product
|
|
Cover and cure mould and test cylinders in accordance with standard procedures and work instructions Completed |
Evidence:
|
Monitor curing to achieve specified stripping strength Completed |
Evidence:
|
Strip and store product
|
|
Test samples to ensure specific strength has been achieved Completed |
Evidence:
|
Remove mould sides and store ready for cleaning Completed |
Evidence:
|
De-stress in accordance with work procedures and sequences Completed |
Evidence:
|
Lift unit according to work instructions and move to store, supported only on points designated on the drawings Completed |
Evidence:
|
Respond to problems
|
|
Identify routine and non-routine problems in the equipment or process Completed |
Evidence:
|
Rectify problems using appropriate solution within area of responsibility Completed |
Evidence:
|
Report problems outside area of responsibility to designated person Completed |
Evidence:
|
Control hazards
|
|
Identify structural precast and pre-stressed concrete production hazards Completed |
Evidence:
|
Assess the risks arising from those hazards Completed |
Evidence:
|
Implement measures to control those risks Completed |
Evidence:
|