The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Determine job requirements
|
|
Follow standard operating procedures (SOPs) Completed |
Evidence:
|
Comply with work health and safety (WHS) requirements at all times Completed |
Evidence:
|
Use appropriate personal protective equipment (PPE) in accordance with SOPs Completed |
Evidence:
|
Identify job requirements from specifications, drawings, job sheets or work instructions Completed |
Evidence:
|
Prepare to construct block
|
|
Interpret and clarify size and fit specifications and Australian Standards with designer or relevant personnel Completed |
Evidence:
|
Identify base size to be constructed and check for compatibility with fit model Completed |
Evidence:
|
Evaluate and record size and fit model specifications, body movement and comfort requirements Completed |
Evidence:
|
Select appropriate drafting principles and methods for block construction Completed |
Evidence:
|
Construct initial block
|
|
Analyse measurements of fit model and enter data into block drafting formulas and methodology Completed |
Evidence:
|
Determine ease allowance Completed |
Evidence:
|
Construct block using patternmaking technical skills and ensure compliance with safe work practices and industry requirements Completed |
Evidence:
|
Document methods and formulas Completed |
Evidence:
|
Cut and construct toiles to check accuracy Completed |
Evidence:
|
Complete final block
|
|
Transfer information from toiles to blocks, including any minor adjustments Completed |
Evidence:
|
Label final blocks and check all necessary information is accurate and complete and complies with specifications Completed |
Evidence:
|
File and store blocks according to appropriate criteria and complete all required documentation Completed |
Evidence:
|