NTISthis.com

Evidence Guide: MSTML2004 - Produce felt for millinery

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

MSTML2004 - Produce felt for millinery

What evidence can you provide to prove your understanding of each of the following citeria?

Determine job requirements

  1. Follow standard operating procedures (SOPs)
  2. Comply with work health and safety (WHS) requirements at all times
  3. Use appropriate personal protective equipment (PPE) in accordance with SOPs
  4. Identify job requirements from specifications, drawings, job sheets or work instructions
Follow standard operating procedures (SOPs)

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Comply with work health and safety (WHS) requirements at all times

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Use appropriate personal protective equipment (PPE) in accordance with SOPs

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify job requirements from specifications, drawings, job sheets or work instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare to produce felt for millinery

  1. Determine design and production requirements
  2. Consider use of new or recycled fibres or traditional fibres and select fibres appropriate for the production of felt
  3. Check fibres for quality and characteristics according to production requirements
  4. Identify and follow workplace procedures, including safe handling and processing of fibres, associated dyes and detergents
  5. Prepare suitable work area, materials and equipment, and resource requirements
Determine design and production requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Consider use of new or recycled fibres or traditional fibres and select fibres appropriate for the production of felt

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check fibres for quality and characteristics according to production requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and follow workplace procedures, including safe handling and processing of fibres, associated dyes and detergents

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare suitable work area, materials and equipment, and resource requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare fibres for felt production

  1. Wash and dye fibres according to design and production requirements
  2. Card and comb fibres and dry fibres, as required
  3. Transfer fibres to area for next process
Wash and dye fibres according to design and production requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Card and comb fibres and dry fibres, as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Transfer fibres to area for next process

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Undertake felting process

  1. Place and layer fibres, alternating direction with each layer
  2. Place fibres onto a suitable frame or surface to be saturated with soapy water and agitated
  3. Remove fibres from frame or surface, hand rub and shrink as required
  4. Dry fibres in preparation for blocking and shaping
  5. Repeat wash if the felting is unsuccessful
Place and layer fibres, alternating direction with each layer

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Place fibres onto a suitable frame or surface to be saturated with soapy water and agitated

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Remove fibres from frame or surface, hand rub and shrink as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Dry fibres in preparation for blocking and shaping

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Repeat wash if the felting is unsuccessful

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Finalise felting process

  1. Check felt against design and production requirements
  2. Transfer felt to appropriate area for next process or pack and store
  3. Dispose of all waste, and complete housekeeping and required documentation
Check felt against design and production requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Transfer felt to appropriate area for next process or pack and store

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Dispose of all waste, and complete housekeeping and required documentation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Determine job requirements

1.1

Follow standard operating procedures (SOPs)

1.2

Comply with work health and safety (WHS) requirements at all times

1.3

Use appropriate personal protective equipment (PPE) in accordance with SOPs

1.4

Identify job requirements from specifications, drawings, job sheets or work instructions

2

Prepare to produce felt for millinery

2.1

Determine design and production requirements

2.2

Consider use of new or recycled fibres or traditional fibres and select fibres appropriate for the production of felt

2.3

Check fibres for quality and characteristics according to production requirements

2.4

Identify and follow workplace procedures, including safe handling and processing of fibres, associated dyes and detergents

2.5

Prepare suitable work area, materials and equipment, and resource requirements

3

Prepare fibres for felt production

3.1

Wash and dye fibres according to design and production requirements

3.2

Card and comb fibres and dry fibres, as required

3.3

Transfer fibres to area for next process

4

Undertake felting process

4.1

Place and layer fibres, alternating direction with each layer

4.2

Place fibres onto a suitable frame or surface to be saturated with soapy water and agitated

4.3

Remove fibres from frame or surface, hand rub and shrink as required

4.4

Dry fibres in preparation for blocking and shaping

4.5

Repeat wash if the felting is unsuccessful

5

Finalise felting process

5.1

Check felt against design and production requirements

5.2

Transfer felt to appropriate area for next process or pack and store

5.3

Dispose of all waste, and complete housekeeping and required documentation

Required Skills and Knowledge

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Determine job requirements

1.1

Follow standard operating procedures (SOPs)

1.2

Comply with work health and safety (WHS) requirements at all times

1.3

Use appropriate personal protective equipment (PPE) in accordance with SOPs

1.4

Identify job requirements from specifications, drawings, job sheets or work instructions

2

Prepare to produce felt for millinery

2.1

Determine design and production requirements

2.2

Consider use of new or recycled fibres or traditional fibres and select fibres appropriate for the production of felt

2.3

Check fibres for quality and characteristics according to production requirements

2.4

Identify and follow workplace procedures, including safe handling and processing of fibres, associated dyes and detergents

2.5

Prepare suitable work area, materials and equipment, and resource requirements

3

Prepare fibres for felt production

3.1

Wash and dye fibres according to design and production requirements

3.2

Card and comb fibres and dry fibres, as required

3.3

Transfer fibres to area for next process

4

Undertake felting process

4.1

Place and layer fibres, alternating direction with each layer

4.2

Place fibres onto a suitable frame or surface to be saturated with soapy water and agitated

4.3

Remove fibres from frame or surface, hand rub and shrink as required

4.4

Dry fibres in preparation for blocking and shaping

4.5

Repeat wash if the felting is unsuccessful

5

Finalise felting process

5.1

Check felt against design and production requirements

5.2

Transfer felt to appropriate area for next process or pack and store

5.3

Dispose of all waste, and complete housekeeping and required documentation

Evidence required to demonstrate competence in this unit must be relevant to and satisfy the requirements of the elements and performance criteria, and include:

reading and following work instructions, standard operating procedures (SOPs), safe work practices

interpreting felt design and production requirements

selecting appropriate fibres

conducting felt production and dyeing activities on at least two (2) occasions

producing felt to design and production requirements on at least two (2) occasions

applying workplace procedures

disposing of all waste, and completing housekeeping and required documentation.

Evidence must be provided that demonstrates knowledge of:

safe work practices and procedures and use of personal protective equipment (PPE)

design and production requirements for the use of felt in millinery:

customer specifications

cost

quantity

quality

colour

tools and equipment

specific expertise

raw materials

new, recycled or traditional fibres appropriate for the production of felt:

natural

synthetic

man-made

animal

vegetable

quality and characteristics of various fibres used in the production of felt

handling requirements for the preparation of fibres

resource requirements for the preparation of fibres and the production of felt

practices for packing, labelling and storing prepared fibres and finished felt

types of frames or equipment suitable for the production of felt:

wooden

metal

plastic

requirements for rubbing and matting fibres for felt production

housekeeping requirements of the workplace

documentation requirements relevant to the production of felt:

batch number and date

record of preparation and production techniques used

customer order information

requirements for next stage of production

dye recipe

practices for recording and reporting

workplace procedures.

Range Statement

This field allows for different work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included.

Workplace procedures include one or more of the following:

requirements prescribed by legislation, awards, agreements and conditions of employment

SOPs

work instructions

PPE

oral, written and visual communication

quality practices, including responsibility for maintenance of own work quality and contribution to quality improvement of team or section output

housekeeping

tasks related to environmental protection, waste disposal, pollution control and recycling

WHS practices

Felting resource requirements include one or more of the following:

well-ventilated and lit work area

access to hot and cold water

facilities and equipment for cutting

equipment for combing and carding

facilities and equipment for washing, and using chemicals and dyes

facilities and equipment for drying

appropriate dye stuffs and chemicals

PPE

specification information

Felting materials and equipment include one or more of the following:

washing equipment

soaking equipment

detergents and scourers

cards and combs

dyes

frames

drying machine

PPE