Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

NWP250B - Construct and install wastewater pipelines

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare construction and installation of collection pipelines.

  1. Determine work requirements for construction and installation from plans, specifications and instructions.
  2. Perform site check to prevent damage to other utilities according to legislative and organisational requirements.
  3. Select and check equipment and tools required to meet safety requirements of task and site.
  4. Identify potential risks to public and environment, and take appropriate steps to minimise and eliminate risks.
Determine work requirements for construction and installation from plans, specifications and instructions.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Perform site check to prevent damage to other utilities according to legislative and organisational requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and check equipment and tools required to meet safety requirements of task and site.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify potential risks to public and environment, and take appropriate steps to minimise and eliminate risks.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Construct and install collection pipelines.

  1. Select, fit and use personal protective equipment.
  2. Excavate and prepare trenches according to specifications and legislative and organisational requirements.
  3. Lay bedding or foundation according to specifications.
  4. Select and lay or join pipes and fittings to grade according to manufacturer guidelines and organisational requirements.
  5. Backfill excavations according to specifications.
Select, fit and use personal protective equipment.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Excavate and prepare trenches according to specifications and legislative and organisational requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Lay bedding or foundation according to specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and lay or join pipes and fittings to grade according to manufacturer guidelines and organisational requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Backfill excavations according to specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Review construction and installation of collection assets.

  1. Check constructed or installed collection pipes and fittings to ensure specifications are met.
  2. Check, maintain and store equipment, tools and materials according to manufacturer guidelines and organisational procedures.
  3. Restore work site to meet environmental and organisational requirements.
  4. Complete workplace records and as constructed drawings and process as required.
Check constructed or installed collection pipes and fittings to ensure specifications are met.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check, maintain and store equipment, tools and materials according to manufacturer guidelines and organisational procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Restore work site to meet environmental and organisational requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete workplace records and as constructed drawings and process as required.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, the range statement and the Assessment Guidelines for the Training Package.

Critical aspects for assessment and evidence required to demonstrate competency in this unit

The candidate should demonstrate the ability to construct and install wastewater collection system pipelines by:

planning work and preparing work site safely

constructing and installing pipes according to specifications and instructions

checking quality of work

clearing work site

completing documentation.

Context of and specific resources for assessment

Access to the workplace and resources including:

documentation that should normally be available in a water industry organisation

relevant codes, standards and government regulations.

Where applicable, physical resources should include equipment modified for people with disabilities.

Access must be provided to appropriate learning and assessment support when required.

Assessment processes and techniques must be culturally appropriate, and appropriate to the language and literacy capacity of the candidate and the work being performed.

Validity and sufficiency of evidence requires that:

competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace

where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice

a decision of competence should only be made when the assessor has complete confidence in the person's competence over time and in various contexts

all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence

where assessment is for the purpose of recognition (RCC/RPL), the evidence provided will need to be authenticated and show that it represents competency demonstrated over a period of time

assessment can be through simulated project-based activity and must include evidence relating to each of the elements in this unit.

Questioning will be undertaken in a manner appropriate to the skill levels of the operator and cultural issues that may affect responses to the questions, and will reflect the requirements of the competency and the work being performed.

Required Skills and Knowledge

This describes the essential skills and knowledge and their level, required for this unit.

Required skills:

install components specified for wastewater collection system, including requirements for protection

construct appropriate assets

install junctions and side lines

identify and respond to operational problems

use communication systems

follow plans, instructions, standards and standard operating procedures

perform work-related calculations

use safety equipment and personal protective equipment

use tools and machinery

identify hazards

give and receive instructions

work effectively as part of a team

use literacy skills in regard to verbal and written communication in the workplace

communicate with customers and other employees.

Required knowledge:

OHS procedures

personal work site safety

risk factors and potential hazards of construction and installation processes

equipment operation, capacity and limitations

safe use of lasers

use of automatic levels

basic levelling techniques

profiles and boning rods

pipe laying techniques

effects of weather and conditions on operation of site or plant

environmental aspects of construction and installation

component parts

shoring and levelling

construction and installation procedures and materials.

Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Add any essential operating conditions that may be present with training and assessment depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts.

Work requirements may include:

location and extent of job

risk assessment recommendations

involvement of subcontractors

equipment specifications

material specifications

utilities' location procedures

environmental protection requirements

boundary protection

signage and traffic management.

Equipment and tools may include:

hand and power tools

lifting and winching equipment

mechanical excavation equipment

levering equipment

pneumatic and motorised equipment, including:

compressors

pneumatic spades and attachments

motorised cutting equipment

pipes and associated fittings

on- and off-road vehicles

portable pumps

pipe laying laser

rotating laser

profiles

automatic level

communication equipment

breathing apparatus

gas detection equipment

rescue equipment

appropriate personal protective equipment.

Legislative and organisational requirements may include:

relevant federal and state or territory legislation and regulations

codes of practice, associated standards and guidance material

documented organisational policies, manuals and induction programs

relevant community planning and development agreements, such as land care agreements.

Pipes may include:

vitrified clay

reinforced concrete

polyvinyl chloride (PVC)

polyethylene

cast iron

ductile iron cement lined

glass reinforced piping

mild steel cement lined.

Fittings may include:

jointing systems for pipe types, e.g. gibault

tension bands

solvent cement joints

compression ring joints

bolted flanges

cathodic protection

electrofusion

butt welding.