The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare for testing and commissioning.
|
|
Check plans for the section to be tested and locate features on site. Completed |
Evidence:
|
Correctly identify and interpret the system operation requirements. Completed |
Evidence:
|
Check vacuum testing and commissioning tasks from relevant documentation and schedule appropriately. Completed |
Evidence:
|
Identify and assess potential hazards and take required preventative measures. Completed |
Evidence:
|
Select and use tools and equipment correctly. Completed |
Evidence:
|
Check testing equipment for accuracy and identify and correct malfunctions. Completed |
Evidence:
|
Maintain water system hygiene.
|
|
Arrange disinfection according to organisational and statutory requirements. Completed |
Evidence:
|
Flush and/or slug clean or swab the relevant section of the distribution system according to the required standard using approved techniques. Completed |
Evidence:
|
Dispose of flushing according to organisational requirements. Completed |
Evidence:
|
Test the pipeline system.
|
|
Fill the distribution system slowly and flush systematically to expel air and debris. Completed |
Evidence:
|
Determine the correct test pressure for the pipeline and fit gauges of the correct range to test equipment. Completed |
Evidence:
|
Carry out testing procedures according to specifications and organisational requirements. Completed |
Evidence:
|
Accurately locate and report failed pipes, joints and fittings and reschedule testing. Completed |
Evidence:
|
Vacuum test concrete access chambers using standard techniques. Completed |
Evidence:
|
Commission the distribution system.
|
|
Ensure the distribution system is made operational according to specifications and organisational procedures. Completed |
Evidence:
|
Check, maintain and store equipment, tools and materials according to manufacturer's guidelines and organisational procedures. Completed |
Evidence:
|
Restore the work site to meet environmental and organisational requirements. Completed |
Evidence:
|
Review record and report results.
|
|
Maintain workplace records according to organisational and statutory requirements. Completed |
Evidence:
|
Maintain calibration records and certificates according to organisational and statutory requirements. Completed |
Evidence:
|