The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Clarify and confirm design requirements in the sewerage pumping station system
|
|
Identify system requirements, constraints, and areas requiring clarification from the concept proposal. Completed |
Evidence:
|
Negotiate alternative options to concept proposal to resolve problems. Completed |
Evidence:
|
Confirm design standards and specifications relevant to the sewerage pumping station system. Completed |
Evidence:
|
Define and document detailed design requirements. Completed |
Evidence:
|
Identify and apply initial data to the design. Completed |
Evidence:
|
Prepare sewerage pumping station system design
|
|
Review project design requirements prior to proceeding with detailed design. Completed |
Evidence:
|
Determine system characteristics (static and dynamic head conditions) Completed |
Evidence:
|
Establish design pump duties. Completed |
Evidence:
|
Determine pressure main and pipe work requirements. Completed |
Evidence:
|
Calculate wet well volume and operating levels. Completed |
Evidence:
|
Finalise horizontal and vertical pressure main alignment in accordance with project design requirements and design standards and specifications. Completed |
Evidence:
|
Nominate appropriate pipe materials. Completed |
Evidence:
|
Prepare structural design of pressure main. Completed |
Evidence:
|
Determine emergency storage and overflow containment requirements. Completed |
Evidence:
|
Design starter system to meet project design requirements and design standards and specifications. Completed |
Evidence:
|
Design to make allowance for OHS during construction in service life. Completed |
Evidence:
|
Prepare design drawings in accordance with design standards, codes and Water Agency requirements. Completed |
Evidence:
|
Manage documentation
|
|
Prepare supporting documentation in accordance with legislative and organisation requirements. Completed |
Evidence:
|
Maintain engineering and project records in accordance with legislative and organisation requirements. Completed |
Evidence:
|
Evaluate design
|
|
Review design to ensure objectives and specifications have been met. Completed |
Evidence:
|
Identify and evaluate compliance with environmental standards and impacts of the design. Completed |
Evidence:
|
Identify and evaluate compliance with legislation, codes and standards including OHS. Completed |
Evidence:
|
Conduct consultations with parties with an interest in the design and report on adjustments and proposed design changes. Completed |
Evidence:
|
Investigate and assess alternative design options. Completed |
Evidence:
|
Recommend the most appropriate design proposal for adoption. Completed |
Evidence:
|