Evidence Guide: NWPIRR012 - Construct open earthen channels or drains

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

NWPIRR012 - Construct open earthen channels or drains

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare for construction work

  1. Determine work requirements from design plans, specifications, instructions and work orders.
  2. Check site and identify hazards.
  3. Make appropriate drainage and diversion arrangements without damage to environment.
  4. Check equipment and open-cut excavation methods to ensure that safety requirements of task and site are met.
  5. Select suitable soil material.
Determine work requirements from design plans, specifications, instructions and work orders.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check site and identify hazards.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Make appropriate drainage and diversion arrangements without damage to environment.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check equipment and open-cut excavation methods to ensure that safety requirements of task and site are met.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select suitable soil material.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Construct channels or drains

  1. Construct earthen channels, drains and batters to planned width, depth and gradient.
  2. Compact soil, apply additives and take earth samples.
  3. Check construction works to ensure that specifications are met.
Construct earthen channels, drains and batters to planned width, depth and gradient.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Compact soil, apply additives and take earth samples.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check construction works to ensure that specifications are met.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Restore work site and equipment

  1. Check, maintain and store equipment, tools and materials.
  2. Restore work site and add environmental improvements or controls to complete work, according to plans.
Check, maintain and store equipment, tools and materials.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Restore work site and add environmental improvements or controls to complete work, according to plans.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan and prepare for construction work

  1. Determine work requirements from design plans, specifications, instructions and work orders.
  2. Check site and identify hazards.
  3. Make appropriate drainage and diversion arrangements without damage to environment.
  4. Check equipment and open-cut excavation methods to ensure that safety requirements of task and site are met.
  5. Select suitable soil material.
Determine work requirements from design plans, specifications, instructions and work orders.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check site and identify hazards.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Make appropriate drainage and diversion arrangements without damage to environment.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check equipment and open-cut excavation methods to ensure that safety requirements of task and site are met.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select suitable soil material.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Construct channels or drains

  1. Construct earthen channels, drains and batters to planned width, depth and gradient.
  2. Compact soil, apply additives and take earth samples.
  3. Check construction works to ensure that specifications are met.
Construct earthen channels, drains and batters to planned width, depth and gradient.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Compact soil, apply additives and take earth samples.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check construction works to ensure that specifications are met.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Restore work site and equipment

  1. Check, maintain and store equipment, tools and materials.
  2. Restore work site and add environmental improvements or controls to complete work, according to plans.
Check, maintain and store equipment, tools and materials.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Restore work site and add environmental improvements or controls to complete work, according to plans.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions section.

1. Plan and prepare for construction work

1.1 Determine work requirements from design plans, specifications, instructions and work orders.

1.2 Check site and identify hazards.

1.3 Make appropriate drainage and diversion arrangements without damage to environment.

1.4 Check equipment and open-cut excavation methods to ensure that safety requirements of task and site are met.

1.5 Select suitable soil material.

2. Construct channels or drains

2.1 Construct earthen channels, drains and batters to planned width, depth and gradient.

2.2 Compact soil, apply additives and take earth samples.

2.3 Check construction works to ensure that specifications are met.

3. Restore work site and equipment

3.1 Check, maintain and store equipment, tools and materials.

3.2 Restore work site and add environmental improvements or controls to complete work, according to plans.

Required Skills and Knowledge

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions section.

1. Plan and prepare for construction work

1.1 Determine work requirements from design plans, specifications, instructions and work orders.

1.2 Check site and identify hazards.

1.3 Make appropriate drainage and diversion arrangements without damage to environment.

1.4 Check equipment and open-cut excavation methods to ensure that safety requirements of task and site are met.

1.5 Select suitable soil material.

2. Construct channels or drains

2.1 Construct earthen channels, drains and batters to planned width, depth and gradient.

2.2 Compact soil, apply additives and take earth samples.

2.3 Check construction works to ensure that specifications are met.

3. Restore work site and equipment

3.1 Check, maintain and store equipment, tools and materials.

3.2 Restore work site and add environmental improvements or controls to complete work, according to plans.

Evidence required to demonstrate competence must satisfy all of the requirements of the elements and performance criteria. If not otherwise specified the candidate must demonstrate evidence of performance of the following on at least one occasion.

identifying and responding to operational problems

producing reports and logs

using safety and personal protective equipment

using tools and machinery

interpreting plans, charts and instructions

applying procedures and standards

applying channel, drain and batter construction techniques

identifying soil types, mechanics and compaction rates

selecting and operating appropriate compaction plant, including tamping foot and smooth drum roller

operating communication systems

performing work related calculations

constructing open earthen channels and drains

planning work and preparing work site according to given specifications and instructions

cutting channels to specification

compacting soil

taking soil samples

checking that work meets specifications

cleaning and storing equipment

restoring work site

Evidence required to demonstrate competence must satisfy all of the requirements of the elements and performance criteria. If not otherwise specified the depth of knowledge demonstrated must be appropriate to the job context of the candidate.

channel and drain system design basics

channel and drain system layout

environmental aspects of construction

channel, drain and batter construction processes

measures to reduce channel deterioration, infestation of weeds, pests and seepage

relevant utilities and service providers

safe use of lasers

use of automatic levels

basic levelling techniques

profiles and boning rods

survey principles

soil types, mechanics and compaction rates

capabilities of plant used for construction, including equipment operation, capacity and limitations

communication systems

work related calculations

hazardous materials handling

landscape and ground structure of work area

risk factors and potential hazards of construction processes

effects of weather and conditions on construction site or plant

control systems