NTISthis.com

Evidence Guide: NWPIRR013 - Construct and install irrigation delivery and stormwater drainage assets

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

NWPIRR013 - Construct and install irrigation delivery and stormwater drainage assets

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare for work

  1. Determine work requirements from specifications and instructions.
  2. Select, fit and use personal protective equipment.
  3. Perform site check to identify hazards and prevent damage to other utilities.
  4. Provide appropriate drainage and diversion from work site.
  5. Check equipment and excavation methods to meet safety requirements of task and site.
Determine work requirements from specifications and instructions.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select, fit and use personal protective equipment.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Perform site check to identify hazards and prevent damage to other utilities.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Provide appropriate drainage and diversion from work site.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check equipment and excavation methods to meet safety requirements of task and site.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Construct and install drains, channels and associated fittings

  1. Provide bedding and foundations according to structure type, location and specification.
  2. Select, place and install prefabricated components and fittings.
  3. Check installed fittings and prefabricated components to ensure that specifications are met.
  4. Construct components on-site.
Provide bedding and foundations according to structure type, location and specification.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select, place and install prefabricated components and fittings.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check installed fittings and prefabricated components to ensure that specifications are met.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Construct components on-site.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Finalise work

  1. Check constructions and installations to ensure that specifications are met.
  2. Check, maintain and store equipment, tools and materials.
  3. Backfill, compact and restore work site.
  4. Maintain workplace records.
Check constructions and installations to ensure that specifications are met.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check, maintain and store equipment, tools and materials.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Backfill, compact and restore work site.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain workplace records.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan and prepare for work

  1. Determine work requirements from specifications and instructions.
  2. Select, fit and use personal protective equipment.
  3. Perform site check to identify hazards and prevent damage to other utilities.
  4. Provide appropriate drainage and diversion from work site.
  5. Check equipment and excavation methods to meet safety requirements of task and site.
Determine work requirements from specifications and instructions.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select, fit and use personal protective equipment.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Perform site check to identify hazards and prevent damage to other utilities.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Provide appropriate drainage and diversion from work site.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check equipment and excavation methods to meet safety requirements of task and site.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Construct and install drains, channels and associated fittings

  1. Provide bedding and foundations according to structure type, location and specification.
  2. Select, place and install prefabricated components and fittings.
  3. Check installed fittings and prefabricated components to ensure that specifications are met.
  4. Construct components on-site.
Provide bedding and foundations according to structure type, location and specification.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select, place and install prefabricated components and fittings.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check installed fittings and prefabricated components to ensure that specifications are met.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Construct components on-site.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Finalise work

  1. Check constructions and installations to ensure that specifications are met.
  2. Check, maintain and store equipment, tools and materials.
  3. Backfill, compact and restore work site.
  4. Maintain workplace records.
Check constructions and installations to ensure that specifications are met.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check, maintain and store equipment, tools and materials.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Backfill, compact and restore work site.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain workplace records.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions section.

1. Plan and prepare for work

1.1 Determine work requirements from specifications and instructions.

1.2 Select, fit and use personal protective equipment.

1.3 Perform site check to identify hazards and prevent damage to other utilities.

1.4 Provide appropriate drainage and diversion from work site.

1.5 Check equipment and excavation methods to meet safety requirements of task and site.

2. Construct and install drains, channels and associated fittings

2.1 Provide bedding and foundations according to structure type, location and specification.

2.2 Select, place and install prefabricated components and fittings.

2.3 Check installed fittings and prefabricated components to ensure that specifications are met.

2.4 Construct components on-site.

3. Finalise work

3.1 Check constructions and installations to ensure that specifications are met.

3.2 Check, maintain and store equipment, tools and materials.

3.3 Backfill, compact and restore work site.

3.4 Maintain workplace records.

Required Skills and Knowledge

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions section.

1. Plan and prepare for work

1.1 Determine work requirements from specifications and instructions.

1.2 Select, fit and use personal protective equipment.

1.3 Perform site check to identify hazards and prevent damage to other utilities.

1.4 Provide appropriate drainage and diversion from work site.

1.5 Check equipment and excavation methods to meet safety requirements of task and site.

2. Construct and install drains, channels and associated fittings

2.1 Provide bedding and foundations according to structure type, location and specification.

2.2 Select, place and install prefabricated components and fittings.

2.3 Check installed fittings and prefabricated components to ensure that specifications are met.

2.4 Construct components on-site.

3. Finalise work

3.1 Check constructions and installations to ensure that specifications are met.

3.2 Check, maintain and store equipment, tools and materials.

3.3 Backfill, compact and restore work site.

3.4 Maintain workplace records.

Evidence required to demonstrate competence must satisfy all of the requirements of the elements and performance criteria. If not otherwise specified the candidate must demonstrate evidence of performance of the following on at least one occasion.

identifying and responding to operational problems

producing reports and logs

using safety and personal protective equipment

using tools and machinery

interpreting plans, charts and instructions

performing work related calculations

applying procedures and standards

using communication equipment

constructing and installing irrigation delivery or stormwater drainage assets

planning work and preparing work site

constructing assets

installing assets

checking that work meets specifications

cleaning and storing equipment

restoring work site

completing documentation

Evidence required to demonstrate competence must satisfy all of the requirements of the elements and performance criteria. If not otherwise specified the depth of knowledge demonstrated must be appropriate to the job context of the candidate.

system layout

environmental aspects of construction

construction processes

relevant utilities and service providers

communication systems

hazardous materials handling

landscape and ground structure of work area

risk factors and potential hazards of construction processes

equipment operation, capacity and limitations

effects of weather and conditions on construction site or plant

control systems

pre-cast components

pipes and fittings