Evidence Guide: NWPIRR021 - Maintain and repair irrigation channels and drains

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

NWPIRR021 - Maintain and repair irrigation channels and drains

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare work site

  1. Determine work requirements from plans, drawings, specifications or instructions.
  2. Notify relevant stakeholders and customers of maintenance work.
  3. Make appropriate drainage, de-watering and inflow diversion arrangements.
  4. Select and check equipment and work methods to meet safety requirements of task and site.
Determine work requirements from plans, drawings, specifications or instructions.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Notify relevant stakeholders and customers of maintenance work.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Make appropriate drainage, de-watering and inflow diversion arrangements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and check equipment and work methods to meet safety requirements of task and site.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain irrigation channels, drains and associated fittings

  1. Conduct routine inspections of designated work areas according to maintenance schedules.
  2. Identify system faults and apply corrective action according to structure type, location, specification.
  3. Identify, select, place and join components and associated fittings.
  4. Construct components on-site.
  5. Repair earthworks and embankments.
Conduct routine inspections of designated work areas according to maintenance schedules.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify system faults and apply corrective action according to structure type, location, specification.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, select, place and join components and associated fittings.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Construct components on-site.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Repair earthworks and embankments.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check work and restore work site

  1. Check repaired or replaced components to ensure that specifications have been met.
  2. Backfill, compact, restore work site and refill the system.
Check repaired or replaced components to ensure that specifications have been met.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Backfill, compact, restore work site and refill the system.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Finalise work

  1. Check, maintain and store equipment, tools and materials.
  2. Complete and process workplace records.
Check, maintain and store equipment, tools and materials.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete and process workplace records.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan and prepare work site

  1. Determine work requirements from plans, drawings, specifications or instructions.
  2. Notify relevant stakeholders and customers of maintenance work.
  3. Make appropriate drainage, de-watering and inflow diversion arrangements.
  4. Select and check equipment and work methods to meet safety requirements of task and site.
Determine work requirements from plans, drawings, specifications or instructions.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Notify relevant stakeholders and customers of maintenance work.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Make appropriate drainage, de-watering and inflow diversion arrangements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and check equipment and work methods to meet safety requirements of task and site.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain irrigation channels, drains and associated fittings

  1. Conduct routine inspections of designated work areas according to maintenance schedules.
  2. Identify system faults and apply corrective action according to structure type, location, specification.
  3. Identify, select, place and join components and associated fittings.
  4. Construct components on-site.
  5. Repair earthworks and embankments.
Conduct routine inspections of designated work areas according to maintenance schedules.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify system faults and apply corrective action according to structure type, location, specification.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, select, place and join components and associated fittings.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Construct components on-site.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Repair earthworks and embankments.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check work and restore work site

  1. Check repaired or replaced components to ensure that specifications have been met.
  2. Backfill, compact, restore work site and refill the system.
Check repaired or replaced components to ensure that specifications have been met.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Backfill, compact, restore work site and refill the system.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Finalise work

  1. Check, maintain and store equipment, tools and materials.
  2. Complete and process workplace records.
Check, maintain and store equipment, tools and materials.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete and process workplace records.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions section.

1. Plan and prepare work site

1.1 Determine work requirements from plans, drawings, specifications or instructions.

1.2 Notify relevant stakeholders and customers of maintenance work.

1.3 Make appropriate drainage, de-watering and inflow diversion arrangements.

1.4 Select and check equipment and work methods to meet safety requirements of task and site.

2. Maintain irrigation channels, drains and associated fittings

2.1 Conduct routine inspections of designated work areas according to maintenance schedules.

2.2 Identify system faults and apply corrective action according to structure type, location, specification.

2.3 Identify, select, place and join components and associated fittings.

2.4 Construct components on-site.

2.5 Repair earthworks and embankments.

3. Check work and restore work site

3.1 Check repaired or replaced components to ensure that specifications have been met.

3.2 Backfill, compact, restore work site and refill the system.

4. Finalise work

4.1 Check, maintain and store equipment, tools and materials.

4.2 Complete and process workplace records.

Required Skills and Knowledge

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions section.

1. Plan and prepare work site

1.1 Determine work requirements from plans, drawings, specifications or instructions.

1.2 Notify relevant stakeholders and customers of maintenance work.

1.3 Make appropriate drainage, de-watering and inflow diversion arrangements.

1.4 Select and check equipment and work methods to meet safety requirements of task and site.

2. Maintain irrigation channels, drains and associated fittings

2.1 Conduct routine inspections of designated work areas according to maintenance schedules.

2.2 Identify system faults and apply corrective action according to structure type, location, specification.

2.3 Identify, select, place and join components and associated fittings.

2.4 Construct components on-site.

2.5 Repair earthworks and embankments.

3. Check work and restore work site

3.1 Check repaired or replaced components to ensure that specifications have been met.

3.2 Backfill, compact, restore work site and refill the system.

4. Finalise work

4.1 Check, maintain and store equipment, tools and materials.

4.2 Complete and process workplace records.

Evidence required to demonstrate competence must satisfy all of the requirements of the elements and performance criteria. If not otherwise specified the candidate must demonstrate evidence of performance of the following on at least one occasion.

identifying and responding to operational problems

laying concrete

inserting water stop or seal

producing reports and logs

using tools and machinery

interpreting plans, charts and instructions

performing work related calculations

planning and preparing work site

inspecting irrigation drains and channels and identifying faults

performing maintenance and repair tasks according to manufacturer specifications and organisational requirements

Evidence required to demonstrate competence must satisfy all of the requirements of the elements and performance criteria. If not otherwise specified the depth of knowledge demonstrated must be appropriate to the job context of the candidate.

environmental aspects of maintenance

construction processes

concrete placement techniques, including compaction

water to cement ratio of concrete

work related calculations

hazardous materials handling

landscape and ground structure of work area

backfilling and compaction requirements

risk factors and potential hazards of maintenance processes

effects of weather and conditions on construction site or plant

control systems

recording and reporting systems

pre-cast components

pipes and fittings

chemical usage