Evidence Guide: NWPNET021 - Install metering equipment

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

NWPNET021 - Install metering equipment

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare work

  1. Conduct risk assessment for environmental safety.
  2. Determine work requirements and work site from specifications or instructions.
  3. Prepare work plans using relevant plans, drawings, standards and technical data according to job and safety requirements.
  4. Select and use electrical safety equipment.
  5. Check coordination issues, including permission to access third-party sites, isolations and permits to work with relevant personnel.
  6. Identify, check and prepare materials, equipment and resources required to satisfy job plan.
  7. Identify basic metering equipment and recognise specifications for operation.
  8. Select safety equipment and fit and use personal protective equipment.
  9. Identify yourself to customers and organise arrangements to complete repairs.
Conduct risk assessment for environmental safety.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine work requirements and work site from specifications or instructions.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare work plans using relevant plans, drawings, standards and technical data according to job and safety requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and use electrical safety equipment.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check coordination issues, including permission to access third-party sites, isolations and permits to work with relevant personnel.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, check and prepare materials, equipment and resources required to satisfy job plan.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify basic metering equipment and recognise specifications for operation.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select safety equipment and fit and use personal protective equipment.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify yourself to customers and organise arrangements to complete repairs.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Read metering equipment

  1. Report readings outside normal parameters and faulty meters and apply organisational procedures for estimating consumption.
  2. Collect and report information on the performance of the metering equipment.
Report readings outside normal parameters and faulty meters and apply organisational procedures for estimating consumption.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Collect and report information on the performance of the metering equipment.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install flow control and metering devices

  1. Apply electrical safety equipment.
  2. Isolate water flow.
  3. Install meter or meter replacement.
  4. Restore water flow and check for leaks and meter operation.
  5. Remove electrical safety equipment and restore site.
Apply electrical safety equipment.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Isolate water flow.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install meter or meter replacement.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Restore water flow and check for leaks and meter operation.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Remove electrical safety equipment and restore site.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain flow control and metering devices

  1. Carry out routine inspections of flow control and metering facilities in water distribution or wastewater collection systems.
  2. Carry out preventative maintenance and service of equipment and facilities.
Carry out routine inspections of flow control and metering facilities in water distribution or wastewater collection systems.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out preventative maintenance and service of equipment and facilities.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Finalise work and complete documentation

  1. Check, tag and report faulty equipment and tools.
  2. Store equipment, tools and materials.
  3. Restore work site.
  4. Maintain compliance reports and workplace records.
  5. Record and report activities.
Check, tag and report faulty equipment and tools.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Store equipment, tools and materials.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Restore work site.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain compliance reports and workplace records.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Record and report activities.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan and prepare work

  1. Conduct risk assessment for environmental safety.
  2. Determine work requirements and work site from specifications or instructions.
  3. Prepare work plans using relevant plans, drawings, standards and technical data according to job and safety requirements.
  4. Select and use electrical safety equipment.
  5. Check coordination issues, including permission to access third-party sites, isolations and permits to work with relevant personnel.
  6. Identify, check and prepare materials, equipment and resources required to satisfy job plan.
  7. Identify basic metering equipment and recognise specifications for operation.
  8. Select safety equipment and fit and use personal protective equipment.
  9. Identify yourself to customers and organise arrangements to complete repairs.
Conduct risk assessment for environmental safety.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine work requirements and work site from specifications or instructions.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare work plans using relevant plans, drawings, standards and technical data according to job and safety requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and use electrical safety equipment.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check coordination issues, including permission to access third-party sites, isolations and permits to work with relevant personnel.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, check and prepare materials, equipment and resources required to satisfy job plan.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify basic metering equipment and recognise specifications for operation.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select safety equipment and fit and use personal protective equipment.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify yourself to customers and organise arrangements to complete repairs.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Read metering equipment

  1. Report readings outside normal parameters and faulty meters and apply organisational procedures for estimating consumption.
  2. Collect and report information on the performance of the metering equipment.
Report readings outside normal parameters and faulty meters and apply organisational procedures for estimating consumption.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Collect and report information on the performance of the metering equipment.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install flow control and metering devices

  1. Apply electrical safety equipment.
  2. Isolate water flow.
  3. Install meter or meter replacement.
  4. Restore water flow and check for leaks and meter operation.
  5. Remove electrical safety equipment and restore site.
Apply electrical safety equipment.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Isolate water flow.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install meter or meter replacement.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Restore water flow and check for leaks and meter operation.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Remove electrical safety equipment and restore site.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain flow control and metering devices

  1. Carry out routine inspections of flow control and metering facilities in water distribution or wastewater collection systems.
  2. Carry out preventative maintenance and service of equipment and facilities.
Carry out routine inspections of flow control and metering facilities in water distribution or wastewater collection systems.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out preventative maintenance and service of equipment and facilities.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Finalise work and complete documentation

  1. Check, tag and report faulty equipment and tools.
  2. Store equipment, tools and materials.
  3. Restore work site.
  4. Maintain compliance reports and workplace records.
  5. Record and report activities.
Check, tag and report faulty equipment and tools.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Store equipment, tools and materials.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Restore work site.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain compliance reports and workplace records.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Record and report activities.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions section.

1. Plan and prepare work

1.1 Conduct risk assessment for environmental safety.

1.2 Determine work requirements and work site from specifications or instructions.

1.3 Prepare work plans using relevant plans, drawings, standards and technical data according to job and safety requirements.

1.4 Select and use electrical safety equipment.

1.5 Check coordination issues, including permission to access third-party sites, isolations and permits to work with relevant personnel.

1.6 Identify, check and prepare materials, equipment and resources required to satisfy job plan.

1.7 Identify basic metering equipment and recognise specifications for operation.

1.8 Select safety equipment and fit and use personal protective equipment.

1.9 Identify yourself to customers and organise arrangements to complete repairs.

2. Read metering equipment

2.1 Report readings outside normal parameters and faulty meters and apply organisational procedures for estimating consumption.

2.2 Collect and report information on the performance of the metering equipment.

3. Install flow control and metering devices

3.1 Apply electrical safety equipment.

3.2 Isolate water flow.

3.3 Install meter or meter replacement.

3.4 Restore water flow and check for leaks and meter operation.

3.5 Remove electrical safety equipment and restore site.

4. Maintain flow control and metering devices

4.1 Carry out routine inspections of flow control and metering facilities in water distribution or wastewater collection systems.

4.2 Carry out preventative maintenance and service of equipment and facilities.

5. Finalise work and complete documentation

5.1 Check, tag and report faulty equipment and tools.

5.2 Store equipment, tools and materials.

5.3 Restore work site.

5.4 Maintain compliance reports and workplace records.

5.5 Record and report activities.

Required Skills and Knowledge

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions section.

1. Plan and prepare work

1.1 Conduct risk assessment for environmental safety.

1.2 Determine work requirements and work site from specifications or instructions.

1.3 Prepare work plans using relevant plans, drawings, standards and technical data according to job and safety requirements.

1.4 Select and use electrical safety equipment.

1.5 Check coordination issues, including permission to access third-party sites, isolations and permits to work with relevant personnel.

1.6 Identify, check and prepare materials, equipment and resources required to satisfy job plan.

1.7 Identify basic metering equipment and recognise specifications for operation.

1.8 Select safety equipment and fit and use personal protective equipment.

1.9 Identify yourself to customers and organise arrangements to complete repairs.

2. Read metering equipment

2.1 Report readings outside normal parameters and faulty meters and apply organisational procedures for estimating consumption.

2.2 Collect and report information on the performance of the metering equipment.

3. Install flow control and metering devices

3.1 Apply electrical safety equipment.

3.2 Isolate water flow.

3.3 Install meter or meter replacement.

3.4 Restore water flow and check for leaks and meter operation.

3.5 Remove electrical safety equipment and restore site.

4. Maintain flow control and metering devices

4.1 Carry out routine inspections of flow control and metering facilities in water distribution or wastewater collection systems.

4.2 Carry out preventative maintenance and service of equipment and facilities.

5. Finalise work and complete documentation

5.1 Check, tag and report faulty equipment and tools.

5.2 Store equipment, tools and materials.

5.3 Restore work site.

5.4 Maintain compliance reports and workplace records.

5.5 Record and report activities.

Evidence required to demonstrate competence must satisfy all of the requirements of the elements and performance criteria. If not otherwise specified the candidate must demonstrate evidence of performance of the following on at least one occasion.

identifying and responding to operational problems

conducting risk assessment

using electrical safety procedures

using personal protective equipment

producing reports and logs

performing basic calculations to install and test equipment

installing flow control and metering devices

planning and preparing for installation of flow control and metering devices

interpreting plans, specifications and instructions for installation of flow control and metering devices

conducting routine inspections, maintenance and servicing of basic metering, flow control and regulating devices

completing workplace documentation

installing, replacing and securing basic volumetric metering equipment for domestic, industrial and commercial premises

dealing with customers

Evidence required to demonstrate competence must satisfy all of the requirements of the elements and performance criteria. If not otherwise specified the depth of knowledge demonstrated must be appropriate to the job context of the candidate.

impact of the principles of hydraulics on the operation of flows

system layout

lock out procedures for mechanical and electrical installations

materials handling

environmental, landscape and ground structure of work area for restoration

risk factors and potential hazards

equipment operation, capacity and limitations

effects of weather and conditions on operation of system, site and plant

flow measurement principles and procedures

layout and performance of pipes and fittings

relevant utilities and service bodies

meter types

data collection and recording system

work in confined spaces and at height

electrical safety