Evidence Guide: NWPNET026 - Install, maintain and repair hydrants

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

NWPNET026 - Install, maintain and repair hydrants

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare for work

  1. Obtain permits, isolation plans and contact Dial Before You Dig.
  2. Identify yourself to customers and ensure customers have been notified of works and potential supply interruptions.
  3. Conduct risk assessment of worksite and work.
  4. Determine work requirements from specifications or instructions.
  5. Test hydrant to determine the work required and record results.
  6. Organise traffic management personnel.
  7. Check all relevant licences from all personnel.
  8. Identify, check and prepare materials, equipment and resources required.
Obtain permits, isolation plans and contact Dial Before You Dig.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify yourself to customers and ensure customers have been notified of works and potential supply interruptions.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct risk assessment of worksite and work.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine work requirements from specifications or instructions.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Test hydrant to determine the work required and record results.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Organise traffic management personnel.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check all relevant licences from all personnel.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, check and prepare materials, equipment and resources required.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct installation, maintenance and refurbishment

  1. Implement isolations.
  2. Implement controls in relation to safety, environment, and barricading the work site.
  3. Excavate and select appropriate equipment.
  4. Complete maintenance repairs.
Implement isolations.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Implement controls in relation to safety, environment, and barricading the work site.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Excavate and select appropriate equipment.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete maintenance repairs.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Finalise work

  1. Remove isolations.
  2. Retest hydrant and record results.
  3. Maintain and store tools as per workplace procedures and manufacturer specifications.
  4. Restore the worksite and complete and submit workplace records.
Remove isolations.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Retest hydrant and record results.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain and store tools as per workplace procedures and manufacturer specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Restore the worksite and complete and submit workplace records.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan and prepare for work

  1. Obtain permits, isolation plans and contact Dial Before You Dig.
  2. Identify yourself to customers and ensure customers have been notified of works and potential supply interruptions.
  3. Conduct risk assessment of worksite and work.
  4. Determine work requirements from specifications or instructions.
  5. Test hydrant to determine the work required and record results.
  6. Organise traffic management personnel.
  7. Check all relevant licences from all personnel.
  8. Identify, check and prepare materials, equipment and resources required.
Obtain permits, isolation plans and contact Dial Before You Dig.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify yourself to customers and ensure customers have been notified of works and potential supply interruptions.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct risk assessment of worksite and work.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine work requirements from specifications or instructions.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Test hydrant to determine the work required and record results.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Organise traffic management personnel.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check all relevant licences from all personnel.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, check and prepare materials, equipment and resources required.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct installation, maintenance and refurbishment

  1. Implement isolations.
  2. Implement controls in relation to safety, environment, and barricading the work site.
  3. Excavate and select appropriate equipment.
  4. Complete maintenance repairs.
Implement isolations.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Implement controls in relation to safety, environment, and barricading the work site.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Excavate and select appropriate equipment.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete maintenance repairs.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Finalise work

  1. Remove isolations.
  2. Retest hydrant and record results.
  3. Maintain and store tools as per workplace procedures and manufacturer specifications.
  4. Restore the worksite and complete and submit workplace records.
Remove isolations.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Retest hydrant and record results.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain and store tools as per workplace procedures and manufacturer specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Restore the worksite and complete and submit workplace records.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions section.

1. Plan and prepare for work

1.1 Obtain permits, isolation plans and contact Dial Before You Dig.

1.2 Identify yourself to customers and ensure customers have been notified of works and potential supply interruptions.

1.3 Conduct risk assessment of worksite and work.

1.4 Determine work requirements from specifications or instructions.

1.5 Test hydrant to determine the work required and record results.

1.6 Organise traffic management personnel.

1.7 Check all relevant licences from all personnel.

1.8 Identify, check and prepare materials, equipment and resources required.

2. Conduct installation, maintenance and refurbishment

2.1 Implement isolations.

2.2 Implement controls in relation to safety, environment, and barricading the work site.

2.3 Excavate and select appropriate equipment.

2.4 Complete maintenance repairs.

3. Finalise work

3.1 Remove isolations.

3.2 Retest hydrant and record results.

3.3 Maintain and store tools as per workplace procedures and manufacturer specifications.

3.4 Restore the worksite and complete and submit workplace records.

Required Skills and Knowledge

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions section.

1. Plan and prepare for work

1.1 Obtain permits, isolation plans and contact Dial Before You Dig.

1.2 Identify yourself to customers and ensure customers have been notified of works and potential supply interruptions.

1.3 Conduct risk assessment of worksite and work.

1.4 Determine work requirements from specifications or instructions.

1.5 Test hydrant to determine the work required and record results.

1.6 Organise traffic management personnel.

1.7 Check all relevant licences from all personnel.

1.8 Identify, check and prepare materials, equipment and resources required.

2. Conduct installation, maintenance and refurbishment

2.1 Implement isolations.

2.2 Implement controls in relation to safety, environment, and barricading the work site.

2.3 Excavate and select appropriate equipment.

2.4 Complete maintenance repairs.

3. Finalise work

3.1 Remove isolations.

3.2 Retest hydrant and record results.

3.3 Maintain and store tools as per workplace procedures and manufacturer specifications.

3.4 Restore the worksite and complete and submit workplace records.

Evidence required to demonstrate competence must satisfy all of the requirements of the elements and performance criteria. If not otherwise specified the candidate must demonstrate evidence of performance of the following on at least one occasion.

reading and interpreting plans and drawings, and relevant standards and instructions

using tools and specific water equipment including valve keys and standpipes

selecting Personal Protection Equipment

maintaining tools

communicating with customers

determining location, size, utilities and services from plans

applying excavation techniques including potholing and cable location

organising traffic management and concrete cutters

conducting risk assessments on site for safety, environmental factors

restoring work site

implementing isolations

operating valves

planning work

complying with water off notices, flow control and shut plans, and permits to work

charging and discharging water mains

restoring site

Evidence required to demonstrate competence must satisfy all of the requirements of the elements and performance criteria. If not otherwise specified the depth of knowledge demonstrated must be appropriate to the job context of the candidate.

isolations

tools and equipment, including quick cuts

traffic management

standpipes

operating within permit to works and shut plans

charging and discharging mains appropriately

site restoration

relevant legislation and standards

equipment operation, capacity, and limitations

how to escalate issues, barriers and concerns