NTISthis.com

Evidence Guide: NWPSOU027 - Route floods through storages

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

NWPSOU027 - Route floods through storages

What evidence can you provide to prove your understanding of each of the following citeria?

Monitor flow and flood routing

  1. Monitor catchment behaviour during normal and flood conditions.
  2. Determine outflow using standard flow rate calculations.
  3. Determine flow control settings.
Monitor catchment behaviour during normal and flood conditions.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine outflow using standard flow rate calculations.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine flow control settings.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan and prepare for dam or storage operation

  1. Plan and prepare for dam or storage operations.
  2. Conduct inspections.
  3. Develop hydrograph template.
Plan and prepare for dam or storage operations.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct inspections.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Develop hydrograph template.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Implement dam/water storage operation plans

  1. Apply operation plans.
  2. Inspect and test plant and equipment.
  3. Test, assess and document safety mechanisms.
Apply operation plans.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect and test plant and equipment.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Test, assess and document safety mechanisms.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Regulate flows

  1. Plot flood data on hydrograph.
  2. Regulate flow control mechanisms to maintain safety of asset and required system supply and flood routing.
  3. Produce data relating to flood performance.
Plot flood data on hydrograph.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Regulate flow control mechanisms to maintain safety of asset and required system supply and flood routing.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Produce data relating to flood performance.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor flow and flood routing

  1. Monitor catchment behaviour during normal and flood conditions.
  2. Determine outflow using standard flow rate calculations.
  3. Determine flow control settings.
Monitor catchment behaviour during normal and flood conditions.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine outflow using standard flow rate calculations.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine flow control settings.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan and prepare for dam or storage operation

  1. Plan and prepare for dam or storage operations.
  2. Conduct inspections.
  3. Develop hydrograph template.
Plan and prepare for dam or storage operations.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct inspections.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Develop hydrograph template.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Implement dam/water storage operation plans

  1. Apply operation plans.
  2. Inspect and test plant and equipment.
  3. Test, assess and document safety mechanisms.
Apply operation plans.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect and test plant and equipment.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Test, assess and document safety mechanisms.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Regulate flows

  1. Plot flood data on hydrograph.
  2. Regulate flow control mechanisms to maintain safety of asset and required system supply and flood routing.
  3. Produce data relating to flood performance.
Plot flood data on hydrograph.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Regulate flow control mechanisms to maintain safety of asset and required system supply and flood routing.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Produce data relating to flood performance.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions section.

1. Monitor flow and flood routing

1.1 Monitor catchment behaviour during normal and flood conditions.

1.2 Determine outflow using standard flow rate calculations.

1.3 Determine flow control settings.

2. Plan and prepare for dam or storage operation

2.1 Plan and prepare for dam or storage operations.

2.2 Conduct inspections.

2.3 Develop hydrograph template.

3. Implement dam/water storage operation plans

3.1 Apply operation plans.

3.2 Inspect and test plant and equipment.

3.3 Test, assess and document safety mechanisms.

4. Regulate flows

4.1 Plot flood data on hydrograph.

4.2 Regulate flow control mechanisms to maintain safety of asset and required system supply and flood routing.

4.3 Produce data relating to flood performance.

Required Skills and Knowledge

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions section.

1. Monitor flow and flood routing

1.1 Monitor catchment behaviour during normal and flood conditions.

1.2 Determine outflow using standard flow rate calculations.

1.3 Determine flow control settings.

2. Plan and prepare for dam or storage operation

2.1 Plan and prepare for dam or storage operations.

2.2 Conduct inspections.

2.3 Develop hydrograph template.

3. Implement dam/water storage operation plans

3.1 Apply operation plans.

3.2 Inspect and test plant and equipment.

3.3 Test, assess and document safety mechanisms.

4. Regulate flows

4.1 Plot flood data on hydrograph.

4.2 Regulate flow control mechanisms to maintain safety of asset and required system supply and flood routing.

4.3 Produce data relating to flood performance.

Evidence required to demonstrate competence must satisfy all of the requirements of the elements and performance criteria. If not otherwise specified the candidate must demonstrate evidence of performance of the following on at least one occasion.

calculating inflow and outflow rates

interpreting and plotting graphs

operating controls and ancillary equipment

conducting inspections

interpreting plans, drawings, instructions, standard operating procedures, policies and standards

using safety equipment and personal protective equipment

identifying hazards

using equipment and instruments

managing and conducting surveillance of catchment run-off through dams and other water storage assets

operating gated spillways

identifying and investigating operational problems

collecting and analysing technical information

preparing required reports

Evidence required to demonstrate competence must satisfy all of the requirements of the elements and performance criteria. If not otherwise specified the depth of knowledge demonstrated must be appropriate to the job context of the candidate.

properties of stored water

system hydraulics

effects of water and catchment conditions on flow expectations

interrogation of catchment monitoring equipment

water flow measurement

operation of flood gates or plant

control systems

dam operation principles

materials science

communication systems

principles of hydraulics

system layout

environmental aspects of operation and maintenance

lock out procedures for mechanical and electrical installations

control systems

equipment operation

relevant utilities and service bodies

hazardous materials handling

effects of weather and conditions on bulkwater assets

principles of dam inspection

risk management techniques

WHS

organisational and statutory requirements