NTISthis.com

Evidence Guide: NWPSOU033 - Operate and maintain salt interception works

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

NWPSOU033 - Operate and maintain salt interception works

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare work

  1. Collect data from ground water.
  2. Establish evaporation pond capacity.
  3. Develop salt interception plan.
Collect data from ground water.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Establish evaporation pond capacity.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Develop salt interception plan.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operate salt interception works

  1. Identify, set or adjust pump station components.
  2. Carry out routine security inspections and cleaning duties.
  3. Operate pump station.
Identify, set or adjust pump station components.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out routine security inspections and cleaning duties.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operate pump station.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain salt interception works

  1. Conduct routine maintenance of salinity pump stations.
  2. Conduct acid dosing of salinity lines.
  3. Maintain saline water collection and disposal pipelines.
  4. Conduct repairs to pipe lines and valves.
  5. Undertake minor civil construction works.
Conduct routine maintenance of salinity pump stations.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct acid dosing of salinity lines.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain saline water collection and disposal pipelines.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct repairs to pipe lines and valves.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Undertake minor civil construction works.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Enhance salt interception performance

  1. Gather data and create a report on salt interception scheme performance.
  2. Optimise salt interception performance.
  3. Undertake hydraulic performance of saline collection and disposal pipelines.
Gather data and create a report on salt interception scheme performance.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Optimise salt interception performance.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Undertake hydraulic performance of saline collection and disposal pipelines.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Compile salt interception reports

  1. Collect required data from monitoring points.
  2. Report salt interception works performance.
Collect required data from monitoring points.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Report salt interception works performance.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan and prepare work

  1. Collect data from ground water.
  2. Establish evaporation pond capacity.
  3. Develop salt interception plan.
Collect data from ground water.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Establish evaporation pond capacity.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Develop salt interception plan.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operate salt interception works

  1. Identify, set or adjust pump station components.
  2. Carry out routine security inspections and cleaning duties.
  3. Operate pump station.
Identify, set or adjust pump station components.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out routine security inspections and cleaning duties.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operate pump station.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain salt interception works

  1. Conduct routine maintenance of salinity pump stations.
  2. Conduct acid dosing of salinity lines.
  3. Maintain saline water collection and disposal pipelines.
  4. Conduct repairs to pipe lines and valves.
  5. Undertake minor civil construction works.
Conduct routine maintenance of salinity pump stations.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct acid dosing of salinity lines.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain saline water collection and disposal pipelines.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct repairs to pipe lines and valves.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Undertake minor civil construction works.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Enhance salt interception performance

  1. Gather data and create a report on salt interception scheme performance.
  2. Optimise salt interception performance.
  3. Undertake hydraulic performance of saline collection and disposal pipelines.
Gather data and create a report on salt interception scheme performance.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Optimise salt interception performance.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Undertake hydraulic performance of saline collection and disposal pipelines.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Compile salt interception reports

  1. Collect required data from monitoring points.
  2. Report salt interception works performance.
Collect required data from monitoring points.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Report salt interception works performance.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions section.

1. Plan and prepare work

1.1 Collect data from ground water.

1.2 Establish evaporation pond capacity.

1.3 Develop salt interception plan.

2. Operate salt interception works

2.1 Identify, set or adjust pump station components.

2.2 Carry out routine security inspections and cleaning duties.

2.3 Operate pump station.

3. Maintain salt interception works

3.1 Conduct routine maintenance of salinity pump stations.

3.2 Conduct acid dosing of salinity lines.

3.3 Maintain saline water collection and disposal pipelines.

3.4 Conduct repairs to pipe lines and valves.

3.5 Undertake minor civil construction works.

4. Enhance salt interception performance

4.1 Gather data and create a report on salt interception scheme performance.

4.2 Optimise salt interception performance.

4.3 Undertake hydraulic performance of saline collection and disposal pipelines.

5. Compile salt interception reports

5.1 Collect required data from monitoring points.

5.2 Report salt interception works performance.

Required Skills and Knowledge

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions section.

1. Plan and prepare work

1.1 Collect data from ground water.

1.2 Establish evaporation pond capacity.

1.3 Develop salt interception plan.

2. Operate salt interception works

2.1 Identify, set or adjust pump station components.

2.2 Carry out routine security inspections and cleaning duties.

2.3 Operate pump station.

3. Maintain salt interception works

3.1 Conduct routine maintenance of salinity pump stations.

3.2 Conduct acid dosing of salinity lines.

3.3 Maintain saline water collection and disposal pipelines.

3.4 Conduct repairs to pipe lines and valves.

3.5 Undertake minor civil construction works.

4. Enhance salt interception performance

4.1 Gather data and create a report on salt interception scheme performance.

4.2 Optimise salt interception performance.

4.3 Undertake hydraulic performance of saline collection and disposal pipelines.

5. Compile salt interception reports

5.1 Collect required data from monitoring points.

5.2 Report salt interception works performance.

Evidence required to demonstrate competence must satisfy all of the requirements of the elements and performance criteria. If not otherwise specified the candidate must demonstrate evidence of performance of the following on at least one occasion.

gathering bore data

locking and tagging out of equipment

storing, handling and using chemicals

collecting samples and conducting water tests

maintaining pumps, valves, pipes, dose acids

maintaining bores and piezometers

undertaking minor civil works including at least one of:

pipeline construction

concrete works

metal fabrication

optimising pipelines and pump stations

repairing pipelines and valves

Evidence required to demonstrate competence must satisfy all of the requirements of the elements and performance criteria. If not otherwise specified the depth of knowledge demonstrated must be appropriate to the job context of the candidate.

groundwater hydraulics

pump performance

pipeline hydraulics

chemical handling and dosing

groundwater data collection

environmental impacts of saline water

maintenance scheduling

valve selection and operation

optimisation principles for pump stations and pipelines

legislation relating to salt interception works