The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare for work.
|
|
Identify work requirements Completed |
Evidence:
|
Identify and control hazards Completed |
Evidence:
|
Coordinate with appropriate personnel Completed |
Evidence:
|
Start up compressor systems/ equipment.
|
|
Perform pre-start-up checks Completed |
Evidence:
|
Check the status of the system/equipment prior to commencing start-up process Completed |
Evidence:
|
Check all required auxiliary systems, including oil and water, to confirm their operational condition Completed |
Evidence:
|
Start up individual items of equipment and the entire compressor system as required Completed |
Evidence:
|
Bring the system to required operating conditions. Completed |
Evidence:
|
Control and monitor the compressor system.
|
|
Initiate load-up through the selection of appropriate speed or cycle Completed |
Evidence:
|
Monitor and adjust downstream equipment as required Completed |
Evidence:
|
Monitor the operational condition and safety status of the unit/system and take appropriate action Completed |
Evidence:
|
Adjust operational speeds and operating cycles as required Completed |
Evidence:
|
Monitor or activate safety systems to ensure that any system shutdowns are controlled and conducted safely and effectively. Completed |
Evidence:
|
Shut down compressor systems/equipment.
|
|
Confirm shutdown cause with other personnel and plant operators before commencing to isolate or shut down the equipment/system Completed |
Evidence:
|
Implement control measures to minimise damage and hazards Completed |
Evidence:
|
Shut down system according to procedures Completed |
Evidence:
|
Inspect the system/equipment as required by procedures Completed |
Evidence:
|
Isolate and purge systems/equipment and prepare plant for maintenance as required. Completed |
Evidence:
|
Maintain plant effectiveness.
|
|
Frequently and critically monitor all plant throughout shift Completed |
Evidence:
|
Use measured/indicated data and smell, sight, sound and feel as appropriate to monitor plant Completed |
Evidence:
|
Identify critical equipment/processes and tune their performance Completed |
Evidence:
|
Identify issues likely to impact on plant performance and take appropriate action Completed |
Evidence:
|
Predict impact of a change in one unit/area on other plant units/areas and communicate this to relevant people Completed |
Evidence:
|
Test trips and alarms as required Completed |
Evidence:
|