Evidence Guide: PMASUP305 - Operate offshore cranes

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

PMASUP305 - Operate offshore cranes

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare for lift

  1. Determine job requirements, including potential hazards
  2. Identify and apply environmental requirements for the lift in accordance with company procedures and crane limitations
  3. Check suitability of load to be lifted
  4. Identify, obtain and inspect materials, equipment and resources to satisfy the job requirements
  5. Follow safety and environmental requirements in accordance with site-specific procedures
  6. Discuss contingency plans with lifting team members, including supply vessel crew
  7. Check work location for safe working area requirements
Determine job requirements, including potential hazards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and apply environmental requirements for the lift in accordance with company procedures and crane limitations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check suitability of load to be lifted

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, obtain and inspect materials, equipment and resources to satisfy the job requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Follow safety and environmental requirements in accordance with site-specific procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Discuss contingency plans with lifting team members, including supply vessel crew

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check work location for safe working area requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct routine checks of the crane

  1. Carry out routine pre-operational equipment checks in accordance with company procedures
  2. Commence start-up procedures and check crane controls for correct operation and ease of movement
  3. Check communication systems are fully operational
  4. Check emergency safety devices are fully operational
Carry out routine pre-operational equipment checks in accordance with company procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Commence start-up procedures and check crane controls for correct operation and ease of movement

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check communication systems are fully operational

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check emergency safety devices are fully operational

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Communicate with work group

  1. Establish and communicate job sequencing schedule with team and/or crew members to ensure an appropriate level of coordination
  2. Advise team members of changes to lifting schedule as required
  3. Identify and use communication methods in accordance with company procedures
Establish and communicate job sequencing schedule with team and/or crew members to ensure an appropriate level of coordination

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Advise team members of changes to lifting schedule as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and use communication methods in accordance with company procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operate crane offshore

  1. Determine the load destination and check integrity of the landing area
  2. Conduct a trial lift
  3. Lift, move and place load safely to required destination
  4. Respond to changes to lifting schedule when warranted
  5. Use appropriate communication methods to coordinate safe movement of the load
Determine the load destination and check integrity of the landing area

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct a trial lift

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Lift, move and place load safely to required destination

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Respond to changes to lifting schedule when warranted

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Use appropriate communication methods to coordinate safe movement of the load

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Shut down crane and review operations

  1. Clear work area and dispose of or deal with materials in accordance with procedures and job specification
  2. Shut down crane in accordance with company procedures
  3. Apply work completion procedures and notify relevant personnel that work is finished
  4. Review operations, report and record learnings and significant findings
Clear work area and dispose of or deal with materials in accordance with procedures and job specification

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Shut down crane in accordance with company procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Apply work completion procedures and notify relevant personnel that work is finished

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Review operations, report and record learnings and significant findings

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Plan and prepare for lift

1.1

Determine job requirements, including potential hazards

1.2

Identify and apply environmental requirements for the lift in accordance with company procedures and crane limitations

1.3

Check suitability of load to be lifted

1.4

Identify, obtain and inspect materials, equipment and resources to satisfy the job requirements

1.5

Follow safety and environmental requirements in accordance with site-specific procedures

1.6

Discuss contingency plans with lifting team members, including supply vessel crew

1.7

Check work location for safe working area requirements

2

Conduct routine checks of the crane

2.1

Carry out routine pre-operational equipment checks in accordance with company procedures

2.2

Commence start-up procedures and check crane controls for correct operation and ease of movement

2.3

Check communication systems are fully operational

2.4

Check emergency safety devices are fully operational

3

Communicate with work group

3.1

Establish and communicate job sequencing schedule with team and/or crew members to ensure an appropriate level of coordination

3.2

Advise team members of changes to lifting schedule as required

3.3

Identify and use communication methods in accordance with company procedures

4

Operate crane offshore

4.1

Determine the load destination and check integrity of the landing area

4.2

Conduct a trial lift

4.3

Lift, move and place load safely to required destination

4.4

Respond to changes to lifting schedule when warranted

4.5

Use appropriate communication methods to coordinate safe movement of the load

5

Shut down crane and review operations

5.1

Clear work area and dispose of or deal with materials in accordance with procedures and job specification

5.2

Shut down crane in accordance with company procedures

5.3

Apply work completion procedures and notify relevant personnel that work is finished

5.4

Review operations, report and record learnings and significant findings

Required Skills and Knowledge

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Plan and prepare for lift

1.1

Determine job requirements, including potential hazards

1.2

Identify and apply environmental requirements for the lift in accordance with company procedures and crane limitations

1.3

Check suitability of load to be lifted

1.4

Identify, obtain and inspect materials, equipment and resources to satisfy the job requirements

1.5

Follow safety and environmental requirements in accordance with site-specific procedures

1.6

Discuss contingency plans with lifting team members, including supply vessel crew

1.7

Check work location for safe working area requirements

2

Conduct routine checks of the crane

2.1

Carry out routine pre-operational equipment checks in accordance with company procedures

2.2

Commence start-up procedures and check crane controls for correct operation and ease of movement

2.3

Check communication systems are fully operational

2.4

Check emergency safety devices are fully operational

3

Communicate with work group

3.1

Establish and communicate job sequencing schedule with team and/or crew members to ensure an appropriate level of coordination

3.2

Advise team members of changes to lifting schedule as required

3.3

Identify and use communication methods in accordance with company procedures

4

Operate crane offshore

4.1

Determine the load destination and check integrity of the landing area

4.2

Conduct a trial lift

4.3

Lift, move and place load safely to required destination

4.4

Respond to changes to lifting schedule when warranted

4.5

Use appropriate communication methods to coordinate safe movement of the load

5

Shut down crane and review operations

5.1

Clear work area and dispose of or deal with materials in accordance with procedures and job specification

5.2

Shut down crane in accordance with company procedures

5.3

Apply work completion procedures and notify relevant personnel that work is finished

5.4

Review operations, report and record learnings and significant findings

Evidence required to demonstrate competence in this unit must be relevant to and satisfy the requirements of the elements and performance criteria, and include the ability to:

undertake pre-start checks and start-up and shutdown procedures

use radio equipment to send and receive information

manoeuvre and position load shifting equipment

safely lift and position load

maintain crane logs

conduct visual checks of crane operating systems and cables

check communications systems and emergency and other devise are fully operational

identify faults, defects or abnormalities and correctly report and record these

recognise abnormal lifting circumstances and safely abort the lift

recognise early warning signs of equipment/processes needing attention or with potential problems

determine the most likely cause of routine problems and take action to ensure a timely return to full performance.

Evidence must be provided that demonstrates knowledge of:

safe working capacity and limits of the equipment

nature/condition of materials being shifted and the particular hazards of each

crane safety systems

safe operating principles

the impact of weather, climatic conditions or other conditions on lifting practices

cargo planning

hierarchy of control.

Range Statement

This field allows for different work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included.

Regulatory framework

The latest version of all legislation, regulations, industry codes of practice and Australian/international standards, or the version specified by the local regulatory authority, must be used, and include one or more of the following:

legislative requirements, including work health and safety (WHS)

industry codes of practice and guidelines

environmental regulations and guidelines

Australian and other standards

licence and certification requirements

road traffic authority requirements

Types of legislation include:

AS 2550.1-2011 Cranes, hoists and winches - Safe use - General requirements

Norsok Standard R-003 - Safe use of lifting equipment

Offshore Petroleum Act 2006

National Offshore Petroleum Safety Authority Safety Case Guidelines September 2004

Petroleum (Submerged Lands) (Management of Safety on Offshore Facilities) Regulations 1996

Statutory Rules 1996 No. 298 as amended

OMHEC Training Standard (OHMEC TS 11 March 2003)

http://www.mms.gov/regcompliance/PDFs/GL-I_2005.pdf

http://www.ogp.org.uk/pubs/376.pdf

EN12079

IMO Circular 860

DNV 2.7-1 & 2.7-2.

Regulatory bodies include:

National Offshore Petroleum Safety and Environmental Management Authority (NOPSEMA)

Australian Maritime Safety Authority (AMSA)

State/Territory OSH Regulatory bodies

Department of Infrastructure and Regional Development.

All operations to which this unit applies are subject to stringent health, safety and environment (HSE) requirements, which may be imposed through state/territory or federal legislation, and these must not be compromised at any time. Where there is an apparent conflict between performance criteria and HSE requirements, the HSE requirements take precedence.

Procedures

All operations must be performed in accordance with relevant procedures.

Procedures are written, verbal, visual, computer-based or in some other form, include one or more of the following:

work instructions

work plans

equipment specifications

company-specific lifting standards and safe working procedures

emergency procedures

standard operating procedures (SOPs)

safe work method statements (SWMS)

temporary instructions

any similar instructions provided for the smooth running of the plant

Hazards

Hazards include one or more of the following:

electricity

gas

gases and liquids under pressure

structural hazards

structural collapse

equipment failures

industrial (machinery, equipment and product)

equipment or product mass

noise, rotational equipment or vibration

plant services (steam, condensate and cooling water)

limited head spaces or overhangs

working at heights, in restricted or confined spaces, or in environments subjected to heat, noise, dusts or vapours

flammability and explosivity

hazardous products and materials

unauthorised personnel

sharp edges, protrusions or obstructions

slippery surfaces, spills or leaks

extreme weather

other hazards that might arise

Types of environments

Types of environments include one or more of the following:

day and night operations

facilities subject to helicopter operations

tropical and temperate climatic conditions

emergency lifts

multi-crane operations including intersecting radii

restricted radius

active hydrocarbon production

active drilling operations

exploration activities

diving support

blind lifts

personnel transfer

engineered lifts

lifting to/from a surface in continuous, three dimensional motion

Trial lift

Trial lifts are conducted to ensure:

stability of load is not compromised

load is not near capacity of crane

load is not of unusual proportions