Evidence Guide: PMC552054C - Spin concrete pipes

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

PMC552054C - Spin concrete pipes

What evidence can you provide to prove your understanding of each of the following citeria?

Assemble and prepare the pipe mould

  1. Check mould for distortion, cracks or other defects
  2. Clean mould cavity and apply stripping agent
  3. Check and insert reinforcing cage and/or other fitments and secure in accordance with procedures/work instructions
  4. Check cover to steel and fix or report as appropriate
  5. Check holding of cage
  6. Assemble mould and secure in accordance with procedures/work instructions
  7. Move pipe mould to spinning equipment
Check mould for distortion, cracks or other defects

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean mould cavity and apply stripping agent

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check and insert reinforcing cage and/or other fitments and secure in accordance with procedures/work instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check cover to steel and fix or report as appropriate

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check holding of cage

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assemble mould and secure in accordance with procedures/work instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Move pipe mould to spinning equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Load mould onto pipe spinning equipment

  1. Load pipe mould onto spinning equipment
  2. Check that mould is stabilised and correctly mounted on rollers
  3. Make adjustments to equipment settings to ensure conformance with procedures/work instructions
  4. Notify appropriate personnel of intention to start spinning equipment
Load pipe mould onto spinning equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check that mould is stabilised and correctly mounted on rollers

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Make adjustments to equipment settings to ensure conformance with procedures/work instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Notify appropriate personnel of intention to start spinning equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Spin pipe

  1. Conduct additional pre-start checks as required in accordance with procedures/work instructions
  2. Ensure an adequate supply of the specified concrete mix is available to meet production requirements
  3. Start spinning equipment in accordance with procedures/work instructions
  4. Monitor instrument/control panels and adjust rate of spin and material flow as necessary to remain within specified operating parameters
  5. Make observations of plant and equipment at specified intervals to identify any anomalies in procedures/work instructions
  6. Maximise product throughput and efficiency to maintain target parameters
  7. Communicate with appropriate personnel regarding the status of operations in line with enterprise requirements
  8. Employ safe working practices which conform to occupational health and safety (OHS) and enterprise requirements
Conduct additional pre-start checks as required in accordance with procedures/work instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure an adequate supply of the specified concrete mix is available to meet production requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Start spinning equipment in accordance with procedures/work instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor instrument/control panels and adjust rate of spin and material flow as necessary to remain within specified operating parameters

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Make observations of plant and equipment at specified intervals to identify any anomalies in procedures/work instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maximise product throughput and efficiency to maintain target parameters

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Communicate with appropriate personnel regarding the status of operations in line with enterprise requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Employ safe working practices which conform to occupational health and safety (OHS) and enterprise requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Finish and cure pipe

  1. Float/finish pipes as required
  2. Remove spun pipe and mould from spinning equipment
  3. Inspect inside diameter of pipe, ends and inside surface finish
  4. Undertake any repairs to pipe caused by irregularities in material flow
  5. Move pipe to curing tunnel or kiln in accordance with procedures/work instructions
  6. Monitor curing of pipe to ensure compliance with enterprise quality requirements
  7. Remove pipe and mould from curing equipment
Float/finish pipes as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Remove spun pipe and mould from spinning equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect inside diameter of pipe, ends and inside surface finish

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Undertake any repairs to pipe caused by irregularities in material flow

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Move pipe to curing tunnel or kiln in accordance with procedures/work instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor curing of pipe to ensure compliance with enterprise quality requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Remove pipe and mould from curing equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Demould pipe

  1. Remove any separators, non-permanent inserts, plugs or blinds
  2. Disassemble mould and release pipe in accordance with safe working practice and procedures/work instructions
  3. Return mould segments for reuse or storage in accordance with enterprise storage quality requirements
Remove any separators, non-permanent inserts, plugs or blinds

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Disassemble mould and release pipe in accordance with safe working practice and procedures/work instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Return mould segments for reuse or storage in accordance with enterprise storage quality requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect and store pipe

  1. Inspect pipe outside diameter and ends/flanges for defects
  2. Make allowable repairs in accordance with specification and procedures/work instructions
  3. Identify and mark pipe with appropriate brand or identification number
  4. Apply appropriate interior surface coatings or coverings as required by the specification
  5. Move pipe and store in compliance with enterprise storage quality/quantity requirements
Inspect pipe outside diameter and ends/flanges for defects

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Make allowable repairs in accordance with specification and procedures/work instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and mark pipe with appropriate brand or identification number

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Apply appropriate interior surface coatings or coverings as required by the specification

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Move pipe and store in compliance with enterprise storage quality/quantity requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Rectify routine problems

  1. Identify the range of faults that can occur during the operation
  2. Determine and rectify fault causes in accordance with procedures/work instructions
  3. Identify and rectify equipment failure causes in accordance with procedures/work instructions
  4. Ensure appropriate records and log books of equipment operations are maintained to meet procedures/work instructions
  5. Identify non-routine problems and report to designated person
Identify the range of faults that can occur during the operation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine and rectify fault causes in accordance with procedures/work instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and rectify equipment failure causes in accordance with procedures/work instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure appropriate records and log books of equipment operations are maintained to meet procedures/work instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify non-routine problems and report to designated person

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

The Evidence Guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

The unit will be assessed in as holistic a manner as is practical and may be integrated with the assessment of other relevant units of competency.

Critical aspects for assessment and evidence required to demonstrate competency in this unit

It is essential that the equipment and process be understood and that the importance of critical material properties is known. Competence must be demonstrated in the ability to recognise and analyse potential situations requiring action and then in reporting the condition to the appropriate individual.

Consistent performance at the required standard should be demonstrated. In particular look to see that:

types of concrete to be spun and its additives are able to be identified

individual material feed and distribution systems are understood

OHS and safe work practices are followed

mould is carefully checked for defects to ensure it is safe to spin

unsafe spinning conditions are recognised and appropriate action taken

mould and pipe transfer movements are monitored and appropriate safe working practices employed

signage, tags and isolation procedures are conformed to

basic maintenance and inspection practices are carried out.

Competence must be demonstrated in the operation of all ancillary equipment to the level required for this unit of competency.

Context of and specific resources for assessment

Assessment will require access to an operating plant over an extended period of time, or a suitable method of gathering evidence of operating ability over a range of situations.

Assessment will occur over a range of situations which will include disruptions to normal, smooth operation.

Simulation or case studies/scenarios may be required to allow for timely assessment of parts of this unit of competency. Simulation should be based on the actual plant and will include 'walk-throughs' of the relevant competency components. A bank of scenarios/case studies/what ifs and questions will be required to probe the reasoning behind observable actions.

Method of assessment

Individual enterprises may choose to add prerequisites and co-requisites relevant to their processes.

Guidance information for assessment

Assessment processes and techniques must be culturally appropriate and appropriate to the language and literacy capacity of the candidate and the work being performed.

Required Skills and Knowledge

Required skills

Required skills include:

recognising conditions leading to unsafe machine operation and taking appropriate action

recognising conditions which will lead to out of specification product and taking appropriate action

implementing the enterprise's procedures and relevant regulatory requirementswithin time constraints and in a manner relevant to the operation of the equipment

conveying information relevant to the operation clearly and effectively

reading and numeracy to interpret workplace documents and technical information

Required knowledge

Required knowledge includes:

operational aspects of the spinning equipment being employed

appropriate safety procedures concerning the operation of the equipment

procedures relating to the reporting of hazardous conditions

appropriate shut down procedures

Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Procedures

All operations are performed in accordance with standard procedures and work instructions

Typical problems

Typical problems may include:

maintaining correct sectional thicknesses and distribution of materials

selecting optimum spinning speeds and conditions for the size of pipe being produced

correctly selecting and positioning/securing cages and inserts in moulds

OHS

All operations are subject to stringent OHS requirements and these must not be compromised at any time. Where there is an apparent conflict between performance criteria and OHS requirements, the OHS requirements take precedence