NTISthis.com

Evidence Guide: PMC552065 - Prepare asphalt

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

PMC552065 - Prepare asphalt

What evidence can you provide to prove your understanding of each of the following citeria?

Determine mix requirements

  1. Check work schedule/job specification/job card
  2. Select correct type and quantity of aggregates and other materials
  3. Meet all special requirements and specifications
  4. Identify any material handling problems and take action in accordance with standard procedures
  5. Update material records as appropriate
Check work schedule/job specification/job card

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select correct type and quantity of aggregates and other materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Meet all special requirements and specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify any material handling problems and take action in accordance with standard procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Update material records as appropriate

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Mix asphalt

  1. Check setup of equipment as required by specifications and standard procedures
  2. Set/adjust plant conditions as required for required product
  3. Feed aggregate to dryer at required rates
  4. Prepare bitumen and other materials and add to mixer as required by specifications and standard procedures
  5. Check that materials prepared match requirements
  6. Use ancillary equipment as required according to standard procedures
  7. Mix to obtain required results
  8. Discharge product to asphalt storage/delivery
Check setup of equipment as required by specifications and standard procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set/adjust plant conditions as required for required product

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Feed aggregate to dryer at required rates

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare bitumen and other materials and add to mixer as required by specifications and standard procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check that materials prepared match requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Use ancillary equipment as required according to standard procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Mix to obtain required results

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Discharge product to asphalt storage/delivery

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor asphalt process

  1. Check and adjust settings as required
  2. Make routine checks and recognise developing problems
  3. Recognise equipment in need of maintenance/repair
  4. Take sample and interpret test results as required
  5. Take appropriate action to ensure continuing quality production according to standard procedures
  6. Complete all required records
Check and adjust settings as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Make routine checks and recognise developing problems

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Recognise equipment in need of maintenance/repair

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Take sample and interpret test results as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Take appropriate action to ensure continuing quality production according to standard procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete all required records

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain batching plant and area

  1. Keep area and equipment clean and in good order
  2. Unload and shut down equipment as required
  3. Respond to routine faults according to enterprise procedures
  4. Report non-routine faults according to enterprise procedures
Keep area and equipment clean and in good order

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Unload and shut down equipment as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Respond to routine faults according to enterprise procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Report non-routine faults according to enterprise procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Rectify routine problems

  1. Identify the range of faults that can occur during the operation
  2. Determine and rectify fault causes in accordance with procedures/work instructions
  3. Identify and rectify equipment failure causes in accordance with procedures/work instructions
  4. Ensure appropriate records and log books of equipment operations are maintained to meet procedures/work instructions
  5. Identify non-routine problems and report to designated person
Identify the range of faults that can occur during the operation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine and rectify fault causes in accordance with procedures/work instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and rectify equipment failure causes in accordance with procedures/work instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure appropriate records and log books of equipment operations are maintained to meet procedures/work instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify non-routine problems and report to designated person

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Control hazards

  1. Identify hazards from the job to be done
  2. Identify other hazards in the work area
  3. Assess the risks arising from those hazards
  4. Implement measures to control those risks in line with procedures
Identify hazards from the job to be done

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify other hazards in the work area

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assess the risks arising from those hazards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Implement measures to control those risks in line with procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Determine mix requirements

1.1

Check work schedule/job specification/job card

1.2

Select correct type and quantity of aggregates and other materials

1.3

Meet all special requirements and specifications

1.4

Identify any material handling problems and take action in accordance with standard procedures

1.5

Update material records as appropriate

2

Mix asphalt

2.1

Check setup of equipment as required by specifications and standard procedures

2.2

Set/adjust plant conditions as required for required product

2.3

Feed aggregate to dryer at required rates

2.4

Prepare bitumen and other materials and add to mixer as required by specifications and standard procedures

2.5

Check that materials prepared match requirements

2.6

Use ancillary equipment as required according to standard procedures

2.7

Mix to obtain required results

2.8

Discharge product to asphalt storage/delivery

3

Monitor asphalt process

3.1

Check and adjust settings as required

3.2

Make routine checks and recognise developing problems

3.3

Recognise equipment in need of maintenance/repair

3.4

Take sample and interpret test results as required

3.5

Take appropriate action to ensure continuing quality production according to standard procedures

3.6

Complete all required records

4

Maintain batching plant and area

4.1

Keep area and equipment clean and in good order

4.2

Unload and shut down equipment as required

4.3

Respond to routine faults according to enterprise procedures

4.4

Report non-routine faults according to enterprise procedures

5

Rectify routine problems

5.1

Identify the range of faults that can occur during the operation

5.2

Determine and rectify fault causes in accordance with procedures/work instructions

5.3

Identify and rectify equipment failure causes in accordance with procedures/work instructions

5.4

Ensure appropriate records and log books of equipment operations are maintained to meet procedures/work instructions

5.5

Identify non-routine problems and report to designated person

6

Control hazards

6.1

Identify hazards from the job to be done

6.2

Identify other hazards in the work area

6.3

Assess the risks arising from those hazards

6.4

Implement measures to control those risks in line with procedures

Required Skills and Knowledge

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Determine mix requirements

1.1

Check work schedule/job specification/job card

1.2

Select correct type and quantity of aggregates and other materials

1.3

Meet all special requirements and specifications

1.4

Identify any material handling problems and take action in accordance with standard procedures

1.5

Update material records as appropriate

2

Mix asphalt

2.1

Check setup of equipment as required by specifications and standard procedures

2.2

Set/adjust plant conditions as required for required product

2.3

Feed aggregate to dryer at required rates

2.4

Prepare bitumen and other materials and add to mixer as required by specifications and standard procedures

2.5

Check that materials prepared match requirements

2.6

Use ancillary equipment as required according to standard procedures

2.7

Mix to obtain required results

2.8

Discharge product to asphalt storage/delivery

3

Monitor asphalt process

3.1

Check and adjust settings as required

3.2

Make routine checks and recognise developing problems

3.3

Recognise equipment in need of maintenance/repair

3.4

Take sample and interpret test results as required

3.5

Take appropriate action to ensure continuing quality production according to standard procedures

3.6

Complete all required records

4

Maintain batching plant and area

4.1

Keep area and equipment clean and in good order

4.2

Unload and shut down equipment as required

4.3

Respond to routine faults according to enterprise procedures

4.4

Report non-routine faults according to enterprise procedures

5

Rectify routine problems

5.1

Identify the range of faults that can occur during the operation

5.2

Determine and rectify fault causes in accordance with procedures/work instructions

5.3

Identify and rectify equipment failure causes in accordance with procedures/work instructions

5.4

Ensure appropriate records and log books of equipment operations are maintained to meet procedures/work instructions

5.5

Identify non-routine problems and report to designated person

6

Control hazards

6.1

Identify hazards from the job to be done

6.2

Identify other hazards in the work area

6.3

Assess the risks arising from those hazards

6.4

Implement measures to control those risks in line with procedures

Evidence required to demonstrate competence in this unit must be relevant to and satisfy the requirements of the elements and performance criteria and demonstrate the ability to:

read and interpret job sheets, procedures, material labels and safety information

set up, start, operate and shut down the equipment according to procedures

select and prepare materials to meet job specifications

monitor key variables, including:

moisture content

temperature

feed rates

quantity and mix of aggregates, additives and bitumen

equipment maintenance/repair needs

product integrity and conformance to specification

make adjustments to meet product quality and production output specifications

discharge asphalt to storage/delivery

identify hazards and apply relevant hazard controls

apply safety procedures

apply housekeeping procedures

recognise out-of-specification products, process problems and materials faults

recognise routine and non-routine problems

identify when the operator is able to rectify problems, when assistance is required and who is the appropriate source for assistance

take action to resolve problems or report them to appropriate personnel

distinguish between possible causes of routine problems, including:

incorrect quantity of materials

contaminated materials/additives

wrong raw materials/additives

incorrect mixing time/technique

equipment faults/damage/failure

communicate effectively with team/work group and supervisors

complete workplace records

do basic arithmetical manipulations, including addition, subtraction, division, multiplication, fractions and percentages.

Must provide evidence that demonstrates knowledge relevant to their job sufficient to operate under routine only supervision and to solve routine problems, including knowledge of:

principles of mixing asphalt

types of bitumen, aggregates and additives commonly used and their role

principles of operation of asphalt mixing equipment and ancillary equipment that is integral to the process

basic physics and chemistry relevant to the equipment/process/materials

the potential effects of variations in raw materials and equipment operation/processes in relation to quality of product

factors which may affect product quality or production output and appropriate remedies

equipment limitations and impact on blending/mixing efficiency and effectiveness

sampling/testing procedures and schedule

routine problems, their probable causes and relevant corrective actions

start-up and shutdown processes

organisation procedures relevant to the work environment/job role

hierarchy of control

hazards that may arise in the job/work environment and:

their possible causes

potential consequences

appropriate risk controls.

Range Statement

This field allows for different work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included.

Regulatory framework

The latest version of all legislation, regulations, industry codes of practice and Australian/international standards, or the version specified by the local regulatory authority, must be used.

Applicable legislation, regulations, standards and codes of practice include:

health, safety and environmental (HSE) legislation, regulations and codes of practice relevant to the workplace, equipment and production processes and hazardous materials

Australian/international standards relevant to the materials being used and products being made

any relevant licence and certification requirements.

All operations to which this unit applies are subject to stringent HSE requirements, which may be imposed through state/territory or federal legislation, and these must not be compromised at any time. Where there is an apparent conflict between performance criteria and such requirements the legislative requirements take precedence.

Procedures

All operations must be performed in accordance with relevant procedures.

Procedures are written, verbal, visual, computer-based or in some other form, and include one or any combination of:

job card

emergency procedures

work instructions

standard operating procedures (SOPs)

safe work method statements (SWMS)

formulas/recipes

batch sheets

temporary instructions

any similar instructions provided for the smooth running of the plant.

Problems

Routine problems must be resolved by applying known solutions.

Routine problems are predictable and include one or more of:

equipment malfunction

incorrect/variations in raw material

mixing tolerance

inconsistent dispersion of minor ingredients/additives

mixing to special requirements

mixed batch does not match requirements.

Known solutions are drawn from one or more of:

procedures

training

remembered experience.

Non-routine problems must be reported according to according to relevant procedures.

Hazards

Hazards must be identified and controlled. Identifying hazards requires consideration of:

smoke, dust, vapours or other atmospheric hazards

high temperatures

weight, shape, volume of materials to be handled

hazardous products and materials

sharp edges, protrusions or obstructions

slippery surfaces, spills or leaks

electricity

gas

gases and liquids under pressure

noise

rotational equipment or vibration

plant services (steam, condensate, cooling water, etc)

structural hazards

equipment failures

machinery, equipment and product mass

limited head spaces or overhangs

working at heights

working in restricted or confined spaces

other hazards that might arise.

Tools and equipment

Tools and equipment include:

asphalt mixing plant

ancillary equipment that is integral to the process

programmable logic controllers (PLC) if fitted.

Records and reports

Records include one or more of:

log books/sheets

electronic records

job/work sheets

other records used for the smooth running of the plant.

Reports include one or more of:

paper or electronic-based logs and reports

verbal/radio reports

reporting items found which require action.