NTISthis.com

Evidence Guide: PMC552093B - Prepare for and cast refractory materials

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

PMC552093B - Prepare for and cast refractory materials

What evidence can you provide to prove your understanding of each of the following citeria?

Establish the suitability of resources

  1. Check all information conforms with resources
  2. Record discrepancies in information
  3. Report any inaccuracies in information to the person in charge
  4. Identify and select materials, components, tools and equipment
Check all information conforms with resources

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Record discrepancies in information

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Report any inaccuracies in information to the person in charge

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and select materials, components, tools and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Mix, place and compact refractory concrete

  1. Mix refractory concrete
  2. Place and compact refractory concrete
  3. Vibrate refractory concrete
  4. Remove and reinstate damaged refractory concrete
  5. Provide and remove temporary supports/formwork
  6. Maintain tools and equipment
Mix refractory concrete

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Place and compact refractory concrete

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Vibrate refractory concrete

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Remove and reinstate damaged refractory concrete

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Provide and remove temporary supports/formwork

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain tools and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Contribute to controlling hazards in work area

  1. Identify hazards in work area
  2. Assess risks arising from those hazards
  3. Take appropriate action to control risks in accordance with procedures and duty of care
Identify hazards in work area

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assess risks arising from those hazards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Take appropriate action to control risks in accordance with procedures and duty of care

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

The Evidence Guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

The unit will be assessed in as holistic a manner as is practical and may be integrated with the assessment of other relevant units of competency.

Critical aspects for assessment and evidence required to demonstrate competency in this unit

Competence must be demonstrated in the operation of all ancillary equipment to the level required for this unit of competency.

Competence must be demonstrated in the ability to recognise and analyse potential situations requiring action and then in implementing appropriate corrective action.

Consistent performance should be demonstrated. In particular look to see that:

refractory cement has the required degree of compaction (neither too little nor too much) and that the casting conforms to requirements

all OHS requirements are followed.

Context of and specific resources for assessment

Assessment will require access to an operating plant over an extended period of time, or a suitable method of gathering evidence of operating ability over a range of situations.

Assessment will occur over a range of situations which will include disruptions to normal, smooth operation.

Simulation or case studies/scenarios may be required to allow for timely assessment of parts of this unit of competency. Simulation should be based on the actual plant and will include 'walk-throughs' of the relevant competency components. A bank of scenarios/case studies/what ifs and questions will be required to probe the reasoning behind observable actions.

Method of assessment

In all plants it may be appropriate to assess this unit concurrently with relevant teamwork and communication units.

It may be appropriate to assess this unit concurrently with other relevant units.

Guidance information for assessment

Assessment processes and techniques must be culturally appropriate and appropriate to the language and literacy capacity of the candidate and the work being performed.

Required Skills and Knowledge

Required skills

Required skills include:

observing and monitoring work procedures

adjusting/correcting/responding to sources of information

identifying and solving problems

manual skills

physical handling skills

using tools and equipment correctly and safely

working in a team or individually, as required

reading and numeracy to interpret workplace documents and technical information

Required knowledge

Required knowledge includes:

methods of preparing background surfaces

types, uses and operation of tools and equipment

methods of compacting materials by hand and with vibration equipment

correct selection and use of anchors

types and methods of finishing the surface of the concrete

reasons for, and timing of, dedicated curing and heat-up programs and the consequences for the installed concrete if the program is not correctly followed

types and uses of temporary support/formwork

methods of protecting work during installation

reasons for, and methods of, providing test panels

methods of cutting

safeguards to take during reinstatement

methods of removing damaged refractory

methods of keying and bonding new to existing refactories

reasons for, and methods of, obtaining seals between new and existing refractory

materials sources

materials types/categorisation

methods of production

familiarity with installation techniques

familiarity with principles of selection

familiarity with variety of applications

Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Procedures

All operations are performed in accordance with standard procedures and work instructions

Tools and equipment

Tools and equipment include:

mixers

pumps

vibrators

lifting equipment

equipment allowing access

Installation

Installation includes:

correct thickness

conforming to required curves and angles

maintaining cover

tying to structure

keying to existing refractory

Occupational health and safety (OHS)

All operations are subject to stringent OHS requirements and these must not be compromised at any time. Where there is an apparent conflict between performance criteria and OHS requirements, the OHS requirements take precedence.