NTISthis.com

Evidence Guide: PPMEPG320 - Manage a power generation system startup

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

PPMEPG320 - Manage a power generation system startup

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare system for operation

  1. Identify production requirements to plan power generation levels.
  2. Determine power generation requirements in conjunction with power authorities.
  3. Determine sequencing for plant startup to suit current circumstances.
  4. Conduct system inspections and pre-start up safety checks in line with regulatory requirements, organisational safety and standard operating procedures.
  5. Confirm plant status by observation and inspection.
  6. Complete routine maintenance to ensure optimum system performance.
Identify production requirements to plan power generation levels.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine power generation requirements in conjunction with power authorities.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine sequencing for plant startup to suit current circumstances.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct system inspections and pre-start up safety checks in line with regulatory requirements, organisational safety and standard operating procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm plant status by observation and inspection.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete routine maintenance to ensure optimum system performance.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Initiate system startup

  1. Commence sequence for plant startup in line with standard operating procedures.
  2. Coordinate generation system start with distribution and ancillary systems and bring on-line.
  3. Observe system or plant for correct operational response.
  4. Detect deviations from operational specifications and rectify or report.
  5. Record system startup and power generation data in operating log.
Commence sequence for plant startup in line with standard operating procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Coordinate generation system start with distribution and ancillary systems and bring on-line.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Observe system or plant for correct operational response.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Detect deviations from operational specifications and rectify or report.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Record system startup and power generation data in operating log.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions.

1. Prepare system for operation

1.1. Identify production requirements to plan power generation levels.

1.2. Determine power generation requirements in conjunction with power authorities.

1.3. Determine sequencing for plant startup to suit current circumstances.

1.4. Conduct system inspections and pre-start up safety checks in line with regulatory requirements, organisational safety and standard operating procedures.

1.5. Confirm plant status by observation and inspection.

1.6. Complete routine maintenance to ensure optimum system performance.

2. Initiate system startup

2.1. Commence sequence for plant startup in line with standard operating procedures.

2.2. Coordinate generation system start with distribution and ancillary systems and bring on-line.

2.3. Observe system or plant for correct operational response.

2.4. Detect deviations from operational specifications and rectify or report.

2.5. Record system startup and power generation data in operating log.

Required Skills and Knowledge

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions.

1. Prepare system for operation

1.1. Identify production requirements to plan power generation levels.

1.2. Determine power generation requirements in conjunction with power authorities.

1.3. Determine sequencing for plant startup to suit current circumstances.

1.4. Conduct system inspections and pre-start up safety checks in line with regulatory requirements, organisational safety and standard operating procedures.

1.5. Confirm plant status by observation and inspection.

1.6. Complete routine maintenance to ensure optimum system performance.

2. Initiate system startup

2.1. Commence sequence for plant startup in line with standard operating procedures.

2.2. Coordinate generation system start with distribution and ancillary systems and bring on-line.

2.3. Observe system or plant for correct operational response.

2.4. Detect deviations from operational specifications and rectify or report.

2.5. Record system startup and power generation data in operating log.

A person demonstrating competency in this unit must satisfy all of the elements, performance criteria and foundation skills of this unit, and must be able to provide evidence that they can:

identify production requirements and manage power generation startup within a pulp and paper manufacturing facility, at least twice in line with required enterprise intervals, to suit power generation levels over different operating periods

complete pre-startup safety checks

complete routine maintenance when preparing for system startup

follow safe working practices when starting up a power generation system

use electronic and other control systems to control equipment during operations

communicate effectively, through written and verbal means, with others, in the work area when starting up a power generation system

on completion of each of the above system startups, record system startup processes and power generation performance data in the operating log.

A person competent in this unit must be able to demonstrate knowledge of:

local power authority regulations and reporting requirements for starting up power generation systems

power generation plant layout

purpose, features and operation of power generation and distribution systems, operating parameters and allowable variations

operation and application of electronic and other control systems

electrical isolation procedures

principles of operation of transformers and circuit protection systems

AC/DC generation principles

electrical output control and regulation principles

power factor characteristics and effects

effect of steam quality on turbine operation

operational tolerances of the turbine system and effects of operating outside these tolerances

key features and purpose of the full range of processes involved in starting up power generation systems, including pre-startup safety checks

pre-start limitations and run-up limitations

methods used to test power systems and diagnose deviations from operational specifications

organisational procedures:

standard operating procedures specific to power generation system startup

workplace health and safety with particular emphasis on use of personal protective equipment

communication reporting lines

recording and reporting startup processes and power generation performance.

Range Statement