Evidence Guide: PUADEFCA306B - Assist in the construction of dry gap crossings

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

PUADEFCA306B - Assist in the construction of dry gap crossings

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare for dry gap crossing operations

  1. Appropriate personal protective equipment is selected and worn in accordance with OH&S requirements
  2. Site layout and preparation is conducted in accordance with standard procedures
  3. All bridging components are checked against inventory and materials list for completeness and are prepared for operation with faults and deficiencies reported to the supervisor
  4. Tools and equipment required for the task are selected, checked for serviceability and faults are reported to the supervisor
Appropriate personal protective equipment is selected and worn in accordance with OH&S requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Site layout and preparation is conducted in accordance with standard procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

All bridging components are checked against inventory and materials list for completeness and are prepared for operation with faults and deficiencies reported to the supervisor

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools and equipment required for the task are selected, checked for serviceability and faults are reported to the supervisor

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Construct a dry gap crossing

  1. Jigs, fixtures and tools to be used in construction are assembled and adjusted ready for use
  2. Bridge components are assembled and checked for compliance, accuracy and alignment in accordance with standard procedures
  3. Equipment is operated in accordance with standard procedures
Jigs, fixtures and tools to be used in construction are assembled and adjusted ready for use

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Bridge components are assembled and checked for compliance, accuracy and alignment in accordance with standard procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Equipment is operated in accordance with standard procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain and clean up site and equipment

  1. Gap crossing sites and crossing systems are maintained in accordance with standard procedures
  2. Gap crossing equipment, tools and unused materials are recovered, cleaned, maintained and documentation is completed, with any faults and deficiencies reported in accordance with standard procedures
  3. Gap crossing equipment, tools and materials are either stored or redeployed to another site in accordance with standard procedures
Gap crossing sites and crossing systems are maintained in accordance with standard procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Gap crossing equipment, tools and unused materials are recovered, cleaned, maintained and documentation is completed, with any faults and deficiencies reported in accordance with standard procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Gap crossing equipment, tools and materials are either stored or redeployed to another site in accordance with standard procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Critical aspects for assessment and evidence required to demonstrate competency in this unit

Assessment must confirm the ability to assist in the construction of at least two dry gap crossings using two types of dry gap crossing bridging equipment listed in the Range Statement. Individuals should be assessed participating in the construction of:

at least one bridge of not less than 15 metres span

at least one bridge constructed at night.

Assessment must also confirm the ability to:

prepare the work site

check components, tools and equipment

participate in the assembly, construction and recovery of the crossing systems

identify faults/problems and take action to rectify them

work as part of a team and interactively communicate with others.

Consistency in performance

Competency should be demonstrated under field conditions over a time frame that allows for individuals to be assessed in the various tasks related to the construction of at least two dry gap crossings using two types of equipment listed in the Range Statement

Context of and specific resources for assessment

Context of assessment

Competency should be assessed by observing the individual assisting in the assembly, construction, operation and maintenance of various types of dry gap crossing equipment in accordance with standard procedures and instructions, by day and night and should cover all of the Critical aspects of evidence.

Specific resources for assessment

Access to:

selected dry gap crossing equipment and components (multiple or single span gap crossing equipment, fixed clear-span equipment, non-equipment bridging, improvised and/or expedient materials, suspended cable equipment, aerial ropeways)

tools, equipment and materials required to support the construction and operation of dry gap crossing equipment

suitable dry gap training area.

Guidance information for assessment

Information that will assist or guide assessment will be written during Phase II of the Review of the PUA00 Public Safety Training Package.

Required Skills and Knowledge

This describes the essential skills and knowledge and their level, required for this unit.

Required Skills

work safely to instructions

select and use tools and equipment appropriate to the task

follow instructions/directives and report information

participate in team

encourage other team members

use a variety of verbal and non-verbal communication techniques including language style, active listening

Required Knowledge

OH&S workplace and equipment safety requirements

materials handling while operating tools

site safety while working with plant

checking components against inventory

techniques for supporting others

composition of teams and roles and responsibilities of team members

verbal and non-verbal communication techniques including language style, active listening

Range Statement

The Range Statement relates to the Unit of Competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording in the Performance Criteria is detailed below.

Dry gap crossing bridging equipment and components may include

Multiple or single span gap crossing equipment

Fixed clear-span equipment

Non equipment bridging

Improvised and/or expedient materials

Suspended cable equipment

Aerial ropeways

Field conditions may include

A range of terrain, soil and vegetation

Under all weather conditions

By day or night and under illumination

Personal protective equipment may include

Boots

Safety glasses/goggles

Ear plugs/muffs

Dust masks/respirators

Gloves

Hard hat/cap

Life vests

OH&S requirements may include

Workplace operations and safety procedures

Use of protective clothing and equipment

Safe working on platforms and scaffolding

Site layout and preparation may include

Preparing site plan

Marking out site

Removing vegetation

Constructing approaches including access roads, tracks and bridge launching areas

Positioning components and materials for assembly

Determining datum line

Standard procedures may include

Plant equipment

Anchorages

Expedient road and tracking i.e. materials obtained locally to construct improvised roads and tracks

Measuring tape/rule

Spirit level

Straight edge

Weights

String lines

Jigs

Clamps

Mechanical advantage devices, including blocks and tackle

Hand and power tools