The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare work site
|
|
Appropriate personal protective equipment is selected and worn in accordance with OH&S requirements Completed |
Evidence:
|
Site layout and preparation is carried out in accordance with approved sketches, drawings, specifications and job instructions Completed |
Evidence:
|
All tools and equipment are inspected for serviceability and prepared for operation and defects are reported to the supervisor in accordance with standard procedures Completed |
Evidence:
|
Materials identified from job instructions and specifications are sourced, prepared and stockpiled in accordance with work schedule, design specifications and job instructions Completed |
Evidence:
|
Build and maintain field structures
|
|
Earthworks for hardstanding, pits and trenches are carried out manually or with the assistance of plant and operator support in accordance with specifications and site requirements Completed |
Evidence:
|
Fabricated/pre-fabricated components are correctly positioned for assembly Completed |
Evidence:
|
Jigs, fixtures and other equipment are assembled and applied to support construction Completed |
Evidence:
|
Scaffolding is erected as required in accordance with job requirements and OH&S requirements Completed |
Evidence:
|
Concrete, bricks/blocks, timber, wire mesh, matting, steel and other materials are laid/assembled according to job specifications Completed |
Evidence:
|
Horizontal and vertical construction/erection is carried out to specification using expedient methods and materials available Completed |
Evidence:
|
Site is progressively camouflaged and concealment is maintained Completed |
Evidence:
|
Assembly/construction is checked for compliance with specifications Completed |
Evidence:
|
Maintain and clean up site and equipment
|
|
Field structures are maintained, further developed and/or repaired to specification in accordance with standard procedures Completed |
Evidence:
|
Plant, vehicles, tools and other equipment are removed from the site, cleaned, serviced, maintained and stored in accordance with standard procedures and documentation is completed Completed |
Evidence:
|
Area is cleared and waste material is disposed of safely in accordance with standard procedures Completed |
Evidence:
|