Evidence Guide: RIIBHD302D - Conduct underground development drilling

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

RIIBHD302D - Conduct underground development drilling

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare for underground drilling

  1. Access, interpret and apply underground development drilling documentation and ensure the work activity is compliant
  2. Receive, interpret and clarify shift change over details including relevant geo-technical details
  3. Select and wear correct personal protective equipment
  4. Inspect and assess site conditions to determine if scaling is required and take action according to site requirements
  5. Conduct equipment pre-start checks to ensure equipment is safe and ready to use
  6. Confirm work area ventilation before entry into work area
  7. Check job site and identify and control possible misfires
Access, interpret and apply underground development drilling documentation and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Receive, interpret and clarify shift change over details including relevant geo-technical details

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and wear correct personal protective equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect and assess site conditions to determine if scaling is required and take action according to site requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct equipment pre-start checks to ensure equipment is safe and ready to use

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm work area ventilation before entry into work area

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check job site and identify and control possible misfires

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Drill and monitor progress

  1. Conduct work safely and efficiently while following procedures, regulations, WHS, and manufacturer’s specifications
  2. Identify, control and report hazards and potential risks according to drilling plan
  3. Use approved dust suppression and extraction methods
  4. Maintain safety of driller and surrounding personnel
  5. Operate equipment safely within working environment limitations and face/ground conditions
  6. Read and interpret drill plans, drill holes and realign equipment according to drill design
  7. Monitor conditions and adjust drilling techniques and components to maintain drilling operations
  8. Monitor drilling progress by monitoring equipment indicators
  9. Remove drill cuttings and sludge to ensure drill hole remains clean
  10. Diagnose and take appropriate action to control drilling problems and advise appropriate personnel
  11. Mark misdirected drill holes
  12. Install collar pipes or lifters in readiness for charging
Conduct work safely and efficiently while following procedures, regulations, WHS, and manufacturer’s specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, control and report hazards and potential risks according to drilling plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Use approved dust suppression and extraction methods

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain safety of driller and surrounding personnel

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operate equipment safely within working environment limitations and face/ground conditions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Read and interpret drill plans, drill holes and realign equipment according to drill design

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor conditions and adjust drilling techniques and components to maintain drilling operations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor drilling progress by monitoring equipment indicators

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Remove drill cuttings and sludge to ensure drill hole remains clean

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Diagnose and take appropriate action to control drilling problems and advise appropriate personnel

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Mark misdirected drill holes

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install collar pipes or lifters in readiness for charging

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Pack up drill site

  1. De-rig equipment appropriately
  2. Clear site of debris
  3. Remove auxiliary services to allocated area
  4. Confirm equipment is ready for transport
De-rig equipment appropriately

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clear site of debris

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Remove auxiliary services to allocated area

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm equipment is ready for transport

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out operator maintenance

  1. Carry out shutdown procedures
  2. Service and make minor adjustments to equipment
  3. Inspect equipment and reports faults and make equipment available for routine operational servicing
Carry out shutdown procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Service and make minor adjustments to equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect equipment and reports faults and make equipment available for routine operational servicing

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out housekeeping activities

  1. Clean equipment to maintain condition and ensure safe and efficient operations
  2. Clean and store auxiliary service equipment
  3. Complete all written documentation clearly, concisely and on time
  4. Pass on end of shift information to oncoming shift
Clean equipment to maintain condition and ensure safe and efficient operations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean and store auxiliary service equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete all written documentation clearly, concisely and on time

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Pass on end of shift information to oncoming shift

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

1. Prepare for underground drilling

1.1 Access, interpret and apply underground development drilling documentation and ensure the work activity is compliant

1.2 Receive, interpret and clarify shift change over details including relevant geo-technical details

1.3 Select and wear correct personal protective equipment

1.4 Inspect and assess site conditions to determine if scaling is required and take action according to site requirements

1.5 Conduct equipment pre-start checks to ensure equipment is safe and ready to use

1.6 Confirm work area ventilation before entry into work area

1.7 Check job site and identify and control possible misfires

2. Drill and monitor progress

2.1 Conduct work safely and efficiently while following procedures, regulations, WHS, and manufacturer’s specifications

2.2 Identify, control and report hazards and potential risks according to drilling plan

2.3 Use approved dust suppression and extraction methods

2.4 Maintain safety of driller and surrounding personnel

2.5 Operate equipment safely within working environment limitations and face/ground conditions

2.6 Read and interpret drill plans, drill holes and realign equipment according to drill design

2.7 Monitor conditions and adjust drilling techniques and components to maintain drilling operations

2.8 Monitor drilling progress by monitoring equipment indicators

2.9 Remove drill cuttings and sludge to ensure drill hole remains clean

2.10 Diagnose and take appropriate action to control drilling problems and advise appropriate personnel

2.11 Mark misdirected drill holes

2.12 Install collar pipes or lifters in readiness for charging

3. Pack up drill site

3.1 De-rig equipment appropriately

3.2 Clear site of debris

3.3 Remove auxiliary services to allocated area

3.4 Confirm equipment is ready for transport

4. Carry out operator maintenance

4.1 Carry out shutdown procedures

4.2 Service and make minor adjustments to equipment

4.3 Inspect equipment and reports faults and make equipment available for routine operational servicing

5. Carry out housekeeping activities

5.1 Clean equipment to maintain condition and ensure safe and efficient operations

5.2 Clean and store auxiliary service equipment

5.3 Complete all written documentation clearly, concisely and on time

5.4 Pass on end of shift information to oncoming shift

Required Skills and Knowledge

1. Prepare for underground drilling

1.1 Access, interpret and apply underground development drilling documentation and ensure the work activity is compliant

1.2 Receive, interpret and clarify shift change over details including relevant geo-technical details

1.3 Select and wear correct personal protective equipment

1.4 Inspect and assess site conditions to determine if scaling is required and take action according to site requirements

1.5 Conduct equipment pre-start checks to ensure equipment is safe and ready to use

1.6 Confirm work area ventilation before entry into work area

1.7 Check job site and identify and control possible misfires

2. Drill and monitor progress

2.1 Conduct work safely and efficiently while following procedures, regulations, WHS, and manufacturer’s specifications

2.2 Identify, control and report hazards and potential risks according to drilling plan

2.3 Use approved dust suppression and extraction methods

2.4 Maintain safety of driller and surrounding personnel

2.5 Operate equipment safely within working environment limitations and face/ground conditions

2.6 Read and interpret drill plans, drill holes and realign equipment according to drill design

2.7 Monitor conditions and adjust drilling techniques and components to maintain drilling operations

2.8 Monitor drilling progress by monitoring equipment indicators

2.9 Remove drill cuttings and sludge to ensure drill hole remains clean

2.10 Diagnose and take appropriate action to control drilling problems and advise appropriate personnel

2.11 Mark misdirected drill holes

2.12 Install collar pipes or lifters in readiness for charging

3. Pack up drill site

3.1 De-rig equipment appropriately

3.2 Clear site of debris

3.3 Remove auxiliary services to allocated area

3.4 Confirm equipment is ready for transport

4. Carry out operator maintenance

4.1 Carry out shutdown procedures

4.2 Service and make minor adjustments to equipment

4.3 Inspect equipment and reports faults and make equipment available for routine operational servicing

5. Carry out housekeeping activities

5.1 Clean equipment to maintain condition and ensure safe and efficient operations

5.2 Clean and store auxiliary service equipment

5.3 Complete all written documentation clearly, concisely and on time

5.4 Pass on end of shift information to oncoming shift

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies relevant documentation, policies and procedures

works effectively with others to undertake and complete underground development drilling that meets all of the required outcomes including:

organising work activities to meet all task requirements

communicating both verbally and orally that is clear and concise with others to receive and pass on changing of shift information

demonstrates completion of conducting underground development drilling that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

demonstrating accurate drilling and driving techniques

planning and preparing for drilling

drilling and monitoring progress

packing-up the drill site

carrying out operator maintenance and housekeeping activities

The candidate must demonstrate knowledge of the following when conducting underground development drilling:

relevant legislative, organisation and site requirements and procedures

equipment safety requirements

reading and interpreting geological and technical data (e.g. basic)

manufacturer’s specifications

application of mining regulations

road rules