Evidence Guide: RIICBM201D - Strip pile heads

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

RIICBM201D - Strip pile heads

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare to strip pile heads

  1. Access, interpret and apply strip pile heads documentation and ensure the work activity is compliant
  2. Obtain, interpret and clarify/confirm work instructions before commencing
  3. Confirm and apply environmental protection and safety requirements
  4. Obtain, interpret and implement traffic management signage requirements
  5. Select and check for faults, plant, tools and equipment to carry out tasks
  6. Identify, address and report environmental issues, potential hazards and risks
  7. Obtain and interpret emergency procedures and be prepared for fire/accident/emergency
Access, interpret and apply strip pile heads documentation and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, interpret and clarify/confirm work instructions before commencing

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm and apply environmental protection and safety requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, interpret and implement traffic management signage requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and check for faults, plant, tools and equipment to carry out tasks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, address and report environmental issues, potential hazards and risks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain and interpret emergency procedures and be prepared for fire/accident/emergency

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Strip pile heads

  1. Check work platform and false work in preparation for pile head stripping
  2. Determine and mark specified height of pile cut-off
  3. Cut horizontal groove to the specified depth at the marked height around the pile to avoid spalling
  4. Attach pile excess to a crane with a sling
  5. Strip back concrete above the groove from steel bars/stands without damage to the reinforcing
  6. Cut steel reinforcing to specified length, and bend to project drawings and specifications
Check work platform and false work in preparation for pile head stripping

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine and mark specified height of pile cut-off

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cut horizontal groove to the specified depth at the marked height around the pile to avoid spalling

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Attach pile excess to a crane with a sling

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Strip back concrete above the groove from steel bars/stands without damage to the reinforcing

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cut steel reinforcing to specified length, and bend to project drawings and specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean up

  1. Clear work area and dispose of or recycle materials
  2. Clean, check, maintain and store plant, tools and equipment
Clear work area and dispose of or recycle materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, check, maintain and store plant, tools and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan and prepare to strip pile heads

  1. Access, interpret and apply strip pile heads documentation and ensure the work activity is compliant
  2. Obtain, interpret and clarify/confirm work instructions before commencing
  3. Confirm and apply environmental protection and safety requirements
  4. Obtain, interpret and implement traffic management signage requirements
  5. Select and check for faults, plant, tools and equipment to carry out tasks
  6. Identify, address and report environmental issues, potential hazards and risks
  7. Obtain and interpret emergency procedures and be prepared for fire/accident/emergency
Access, interpret and apply strip pile heads documentation and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, interpret and clarify/confirm work instructions before commencing

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm and apply environmental protection and safety requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, interpret and implement traffic management signage requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and check for faults, plant, tools and equipment to carry out tasks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, address and report environmental issues, potential hazards and risks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain and interpret emergency procedures and be prepared for fire/accident/emergency

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Strip pile heads

  1. Check work platform and false work in preparation for pile head stripping
  2. Determine and mark specified height of pile cut-off
  3. Cut horizontal groove to the specified depth at the marked height around the pile to avoid spalling
  4. Attach pile excess to a crane with a sling
  5. Strip back concrete above the groove from steel bars/stands without damage to the reinforcing
  6. Cut steel reinforcing to specified length, and bend to project drawings and specifications
  7. Clear work area and dispose of or recycle materials
  8. Clean, check, maintain and store plant, tools and equipment
Check work platform and false work in preparation for pile head stripping

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine and mark specified height of pile cut-off

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cut horizontal groove to the specified depth at the marked height around the pile to avoid spalling

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Attach pile excess to a crane with a sling

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Strip back concrete above the groove from steel bars/stands without damage to the reinforcing

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cut steel reinforcing to specified length, and bend to project drawings and specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clear work area and dispose of or recycle materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, check, maintain and store plant, tools and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

1. Plan and prepare to strip pile heads

1.1 Access, interpret and apply strip pile heads documentation and ensure the work activity is compliant

1.2 Obtain, interpret and clarify/confirm work instructions before commencing

1.3 Confirm and apply environmental protection and safety requirements

1.4 Obtain, interpret and implement traffic management signage requirements

1.5 Select and check for faults, plant, tools and equipment to carry out tasks

1.6 Identify, address and report environmental issues, potential hazards and risks

1.7 Obtain and interpret emergency procedures and be prepared for fire/accident/emergency

2. Strip pile heads

2.1 Check work platform and false work in preparation for pile head stripping

2.2 Determine and mark specified height of pile cut-off

2.3 Cut horizontal groove to the specified depth at the marked height around the pile to avoid spalling

2.4 Attach pile excess to a crane with a sling

2.5 Strip back concrete above the groove from steel bars/stands without damage to the reinforcing

2.6 Cut steel reinforcing to specified length, and bend to project drawings and specifications

3. Clean up

3.1 Clear work area and dispose of or recycle materials

3.2 Clean, check, maintain and store plant, tools and equipment

Required Skills and Knowledge

1. Plan and prepare to strip pile heads

1.1 Access, interpret and apply strip pile heads documentation and ensure the work activity is compliant

1.2 Obtain, interpret and clarify/confirm work instructions before commencing

1.3 Confirm and apply environmental protection and safety requirements

1.4 Obtain, interpret and implement traffic management signage requirements

1.5 Select and check for faults, plant, tools and equipment to carry out tasks

1.6 Identify, address and report environmental issues, potential hazards and risks

1.7 Obtain and interpret emergency procedures and be prepared for fire/accident/emergency

2. Strip pile heads

2.1 Check work platform and false work in preparation for pile head stripping

2.2 Determine and mark specified height of pile cut-off

2.3 Cut horizontal groove to the specified depth at the marked height around the pile to avoid spalling

2.4 Attach pile excess to a crane with a sling

2.5 Strip back concrete above the groove from steel bars/stands without damage to the reinforcing

2.6 Cut steel reinforcing to specified length, and bend to project drawings and specifications

3. Clean up

3.1 Clear work area and dispose of or recycle materials

3.2 Clean, check, maintain and store plant, tools and equipment

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies applicable documentation, policies and procedures

works effectively with others to undertake and complete the stripping of pile heads that meets all of the required outcomes including:

communicating clearly and concisely with others to receive and clarify work instructions

demonstrates completion of strip pile heads that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

setting out and stripping of a minimum of six (6) pile heads to design specifications

checking, cleaning and maintaining store plant, tools and equipment

The candidate must demonstrate knowledge of the following in applying the strip pile heads through:

applying organisational and site requirements and procedures for:

risk assessment

work health and safety

site and equipment safety requirements

bridge construction and sequencing

pile head stripping

steel reinforcement and stressing strands

concrete

pneumatic and electric jack hammers and scabblers

site isolation and traffic control responsibilities and authorities

project quality requirements

slinging procedures for supporting pile off cut

civil construction terminology

interpreting engineering drawings

equipment types, characteristics, technical capabilities and limitations

safety data sheets and materials handling methods

JSA/JSEA/safe work method statements