Evidence Guide: RIICBM302D - Install pre-cast girders

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

RIICBM302D - Install pre-cast girders

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare to install pre-cast girders

  1. Access, interpret and apply pre-cast girder installation documentation and ensure the work activity is compliant
  2. Obtain, interpret, clarify and confirm work instructions before proceeding
  3. Confirm and apply environmental protection and safety requirements
  4. Obtain, interpret and implement traffic management signage
  5. Select and check for faults plant, tools and equipment to carry out tasks
  6. Identify, address and report environmental issues, potential hazards and risks
  7. Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency
Access, interpret and apply pre-cast girder installation documentation and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, interpret, clarify and confirm work instructions before proceeding

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm and apply environmental protection and safety requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, interpret and implement traffic management signage

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and check for faults plant, tools and equipment to carry out tasks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, address and report environmental issues, potential hazards and risks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install bearings

  1. Determine bearing types and position
  2. Check bearing dimensions and materials for quality
  3. Install bearings
  4. Identify and install locating brackets/bolts in preparation for the placement of girders
Determine bearing types and position

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check bearing dimensions and materials for quality

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install bearings

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and install locating brackets/bolts in preparation for the placement of girders

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install girders

  1. Determine individual girder location
  2. Determine fitting sequence to install girders and advise the crane operator
  3. Check girders for conformity to design prior to lifting
  4. Check lifting points on girders for serviceability and attach and use tag lines to guide girder to position
  5. Place timber packing to support girder load
  6. Use drift to align holes and insert and tension locating bolts
  7. Adjust bearings to provide support across the full face of the bearing to the girder
  8. Brace girder to prevent lateral movement or rolling
  9. Remove, roll and store tag lines
  10. Remove excess epoxy putty or mortar
  11. Remove timber packing at specified time
Determine individual girder location

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine fitting sequence to install girders and advise the crane operator

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check girders for conformity to design prior to lifting

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check lifting points on girders for serviceability and attach and use tag lines to guide girder to position

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Place timber packing to support girder load

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Use drift to align holes and insert and tension locating bolts

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Adjust bearings to provide support across the full face of the bearing to the girder

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Brace girder to prevent lateral movement or rolling

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Remove, roll and store tag lines

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Remove excess epoxy putty or mortar

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Remove timber packing at specified time

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean up

  1. Clear work area and dispose of or recycle materials
  2. Clean, check, maintain and store plant, tools and equipment
Clear work area and dispose of or recycle materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, check, maintain and store plant, tools and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan and prepare to install pre-cast girders

  1. Access, interpret and apply pre-cast girder installation documentation and ensure the work activity is compliant
  2. Obtain, interpret, clarify and confirm work instructions before proceeding
  3. Confirm and apply environmental protection and safety requirements
  4. Obtain, interpret and implement traffic management signage
  5. Select and check for faults plant, tools and equipment to carry out tasks
  6. Identify, address and report environmental issues, potential hazards and risks
  7. Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency
Access, interpret and apply pre-cast girder installation documentation and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, interpret, clarify and confirm work instructions before proceeding

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm and apply environmental protection and safety requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, interpret and implement traffic management signage

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and check for faults plant, tools and equipment to carry out tasks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, address and report environmental issues, potential hazards and risks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install bearings

  1. Determine bearing types and position
  2. Check bearing dimensions and materials for quality
  3. Install bearings
  4. Identify and install locating brackets/bolts in preparation for the placement of girders
Determine bearing types and position

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check bearing dimensions and materials for quality

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install bearings

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and install locating brackets/bolts in preparation for the placement of girders

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install girders

  1. Determine individual girder location
  2. Determine fitting sequence to install girders and advise the crane operator
  3. Check girders for conformity to design prior to lifting
  4. Check lifting points on girders for serviceability and attach and use tag lines to guide girder to position
  5. Place timber packing to support girder load
  6. Use drift to align holes and insert and tension locating bolts
  7. Adjust bearings to provide support across the full face of the bearing to the girder
  8. Brace girder to prevent lateral movement or rolling
  9. Remove, roll and store tag lines
  10. Remove excess epoxy putty or mortar
  11. Remove timber packing at specified time
  12. Clear work area and dispose of or recycle materials
  13. Clean, check, maintain and store plant, tools and equipment
Determine individual girder location

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine fitting sequence to install girders and advise the crane operator

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check girders for conformity to design prior to lifting

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check lifting points on girders for serviceability and attach and use tag lines to guide girder to position

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Place timber packing to support girder load

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Use drift to align holes and insert and tension locating bolts

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Adjust bearings to provide support across the full face of the bearing to the girder

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Brace girder to prevent lateral movement or rolling

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Remove, roll and store tag lines

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Remove excess epoxy putty or mortar

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Remove timber packing at specified time

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clear work area and dispose of or recycle materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, check, maintain and store plant, tools and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

1. Plan and prepare to install pre-cast girders

1.1 Access, interpret and apply pre-cast girder installation documentation and ensure the work activity is compliant

1.2 Obtain, interpret, clarify and confirm work instructions before proceeding

1.3 Confirm and apply environmental protection and safety requirements

1.4 Obtain, interpret and implement traffic management signage

1.5 Select and check for faults plant, tools and equipment to carry out tasks

1.6 Identify, address and report environmental issues, potential hazards and risks

1.7 Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

2. Install bearings

2.1 Determine bearing types and position

2.2 Check bearing dimensions and materials for quality

2.3 Install bearings

2.4 Identify and install locating brackets/bolts in preparation for the placement of girders

3. Install girders

3.1 Determine individual girder location

3.2 Determine fitting sequence to install girders and advise the crane operator

3.3 Check girders for conformity to design prior to lifting

3.4 Check lifting points on girders for serviceability and attach and use tag lines to guide girder to position

3.5 Place timber packing to support girder load

3.6 Use drift to align holes and insert and tension locating bolts

3.7 Adjust bearings to provide support across the full face of the bearing to the girder

3.8 Brace girder to prevent lateral movement or rolling

3.9 Remove, roll and store tag lines

3.10 Remove excess epoxy putty or mortar

3.11 Remove timber packing at specified time

4. Clean up

4.1 Clear work area and dispose of or recycle materials

4.2 Clean, check, maintain and store plant, tools and equipment

Required Skills and Knowledge

1. Plan and prepare to install pre-cast girders

1.1 Access, interpret and apply pre-cast girder installation documentation and ensure the work activity is compliant

1.2 Obtain, interpret, clarify and confirm work instructions before proceeding

1.3 Confirm and apply environmental protection and safety requirements

1.4 Obtain, interpret and implement traffic management signage

1.5 Select and check for faults plant, tools and equipment to carry out tasks

1.6 Identify, address and report environmental issues, potential hazards and risks

1.7 Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

2. Install bearings

2.1 Determine bearing types and position

2.2 Check bearing dimensions and materials for quality

2.3 Install bearings

2.4 Identify and install locating brackets/bolts in preparation for the placement of girders

3. Install girders

3.1 Determine individual girder location

3.2 Determine fitting sequence to install girders and advise the crane operator

3.3 Check girders for conformity to design prior to lifting

3.4 Check lifting points on girders for serviceability and attach and use tag lines to guide girder to position

3.5 Place timber packing to support girder load

3.6 Use drift to align holes and insert and tension locating bolts

3.7 Adjust bearings to provide support across the full face of the bearing to the girder

3.8 Brace girder to prevent lateral movement or rolling

3.9 Remove, roll and store tag lines

3.10 Remove excess epoxy putty or mortar

3.11 Remove timber packing at specified time

4. Clean up

4.1 Clear work area and dispose of or recycle materials

4.2 Clean, check, maintain and store plant, tools and equipment

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies applicable legislation, documentation, policies and procedures

works effectively with others to undertake and complete the installation of pre-cast girders that meets all of the required outcomes including:

using a range of communication techniques and equipment to convey information to others

maintaining written and verbal reporting requirements

communicating clearly and concisely with others to receive and clarify work instructions

implement traffic management signage

accurately and safely direct crane operation

demonstrates completion of installing pre-cast girders that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

installing bearings and locating brackets/bolts

installing all the pre-cast concrete girders on a multi-span bridge of not less than twenty (20) metres in length to specifications including:

installing bearings

installing lateral bracing

installing locating brackets and bolts

identifying hog

checking direction of skew angle, lateral bow and twist prior to lifting

removing excess epoxy putty or mortar and timber packaging

The candidate must demonstrate knowledge of installing pre-cast girders through:

applying legislative, organisation and site requirements for:

risk assessment and management

site and equipment safety requirements

bridge construction and sequencing

pre-cast concrete girder installation

bearing types and installation

safe lifting techniques

structural technology

safe working procedures for working at heights and over water

site isolation and traffic control responsibilities and authorities

project quality requirements

civil construction terminology

interpreting engineering drawings

equipment types, characteristics, technical capabilities and limitations

operational, maintenance and basic diagnostic procedures

safety data sheets and materials handling methods

JSAs/safe work method statements