The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare
|
|
Access, interpret and apply compliance documentation relevant to the work activity Completed |
Evidence:
|
Obtain, confirm and apply work instructions, including plans, specifications, quality requirements and operational details to the allotted task Completed |
Evidence:
|
Obtain and confirm safety requirements from the site safety plan and organisational policies and procedures, and apply to the allotted task Completed |
Evidence:
|
Identify, obtain and implement signage requirements from the project traffic management plan Completed |
Evidence:
|
Select plant, tools and equipment to carry out tasks consistent with the requirements of the job, check for serviceability and rectify or report any faults Completed |
Evidence:
|
Identify environmental protection requirements from the project environmental management plan, and confirm and apply to the allotted task Completed |
Evidence:
|
Confirm installation details
|
|
Measure stirrup spacing and compare with spacing of cast in ligatures and brackets to eliminate difficulties when positioning units Completed |
Evidence:
|
Determine individual pre-cast parapet unit location from project drawings and specifications Completed |
Evidence:
|
Determine sequence of parapet installation and carry out in accordance with workplace procedures Completed |
Evidence:
|
Check parapets for conformity to design prior to lifting Completed |
Evidence:
|
Check lifting points on pre-cast units for serviceability Completed |
Evidence:
|
Install pre-cast parapet units
|
|
Raise pre-cast parapet end unit to allow fitting of bracket Completed |
Evidence:
|
Manoeuvre pre-cast parapet unit into the vertical position in accordance with installation procedures Completed |
Evidence:
|
Guide pre-cast parapet unit into approximate position and attach locating bolts to cast in brackets Completed |
Evidence:
|
Correctly establish vertical and horizontal alignment of pre-cast parapet end units and tighten bolts Completed |
Evidence:
|
Install intermediate pre-cast parapet units in approximate positions Completed |
Evidence:
|
Check pre-cast end units for correct height and alignment Completed |
Evidence:
|
Adjust intermediate pre-cast parapet units to design alignment and tighten locating bolts Completed |
Evidence:
|
Install anchor cable and fix ends to job specifications Completed |
Evidence:
|
Finish parapet
|
|
Install services and fittings to job specifications as required Completed |
Evidence:
|
Fit joints with foam inserts and groat Completed |
Evidence:
|
Form up and prepare cast in-situ infills of the pre-cast units Completed |
Evidence:
|
Place concrete and finish to design Completed |
Evidence:
|
Dismantle formwork and remove from site Completed |
Evidence:
|
Clean up
|
|
Clear work area and dispose of or recycle materials in accordance with project environmental management plan Completed |
Evidence:
|
Clean, check, maintain and store plant, tools and equipment Completed |
Evidence:
|