Evidence Guide: RIICBM303D - Install pre-cast parapets

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

RIICBM303D - Install pre-cast parapets

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare

  1. Access, interpret and apply documentation to install pre-cast parapets and ensure the work activity is compliant
  2. Obtain, interpret, clarify and confirm and work instructions before proceeding
  3. Confirm and apply environmental protection and safety requirements
  4. Obtain, interpret and implement traffic management signage requirements
  5. Select and check for faults plant, tools and equipment to carry out tasks
  6. Identify, address and report environmental issues, potential hazards and risks
  7. Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency
Access, interpret and apply documentation to install pre-cast parapets and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, interpret, clarify and confirm and work instructions before proceeding

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm and apply environmental protection and safety requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, interpret and implement traffic management signage requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and check for faults plant, tools and equipment to carry out tasks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, address and report environmental issues, potential hazards and risks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm installation details

  1. Measure stirrup spacing and compare with spacing of cast in ligatures and brackets to eliminate difficulties when positioning units
  2. Determine individual pre-cast parapet unit location
  3. Determine sequence of parapet installation and carry out
  4. Check parapets for conformity to design prior to lifting
  5. Check lifting points on pre-cast units for serviceability
Measure stirrup spacing and compare with spacing of cast in ligatures and brackets to eliminate difficulties when positioning units

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine individual pre-cast parapet unit location

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine sequence of parapet installation and carry out

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check parapets for conformity to design prior to lifting

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check lifting points on pre-cast units for serviceability

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install pre-cast parapet units

  1. Raise pre-cast parapet end unit to allow fitting of bracket
  2. Manoeuvre pre-cast parapet unit into the vertical position
  3. Guide pre-cast parapet unit into approximate position and attach locating bolts to cast in brackets
  4. Correctly establish vertical and horizontal alignment of pre-cast parapet end units and tighten bolts
  5. Install intermediate pre-cast parapet units in approximate positions
  6. Check pre-cast end units for correct height and alignment
  7. Adjust intermediate pre-cast parapet units to design alignment and tighten locating bolts
  8. Install anchor cable and fix ends
Raise pre-cast parapet end unit to allow fitting of bracket

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Manoeuvre pre-cast parapet unit into the vertical position

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Guide pre-cast parapet unit into approximate position and attach locating bolts to cast in brackets

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Correctly establish vertical and horizontal alignment of pre-cast parapet end units and tighten bolts

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install intermediate pre-cast parapet units in approximate positions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check pre-cast end units for correct height and alignment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Adjust intermediate pre-cast parapet units to design alignment and tighten locating bolts

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install anchor cable and fix ends

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Finish parapet

  1. Install services and fittings as required
  2. Fit joints with foam inserts and groat
  3. Form up and prepare cast in-situ infills of the pre-cast units
  4. Place concrete and finish
  5. Dismantle formwork and remove from site
Install services and fittings as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fit joints with foam inserts and groat

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Form up and prepare cast in-situ infills of the pre-cast units

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Place concrete and finish

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Dismantle formwork and remove from site

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean up

  1. Clear work area and dispose of or recycle materials
  2. Clean, check, maintain and store plant, tools and equipment
Clear work area and dispose of or recycle materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, check, maintain and store plant, tools and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan and prepare

  1. Access, interpret and apply documentation to install pre-cast parapets and ensure the work activity is compliant
  2. Obtain, interpret, clarify and confirm and work instructions before proceeding
  3. Confirm and apply environmental protection and safety requirements
  4. Obtain, interpret and implement traffic management signage requirements
  5. Select and check for faults plant, tools and equipment to carry out tasks
  6. Identify, address and report environmental issues, potential hazards and risks
  7. Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency
Access, interpret and apply documentation to install pre-cast parapets and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, interpret, clarify and confirm and work instructions before proceeding

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm and apply environmental protection and safety requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, interpret and implement traffic management signage requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and check for faults plant, tools and equipment to carry out tasks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, address and report environmental issues, potential hazards and risks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm installation details

  1. Measure stirrup spacing and compare with spacing of cast in ligatures and brackets to eliminate difficulties when positioning units
  2. Determine individual pre-cast parapet unit location
  3. Determine sequence of parapet installation and carry out
  4. Check parapets for conformity to design prior to lifting
  5. Check lifting points on pre-cast units for serviceability
Measure stirrup spacing and compare with spacing of cast in ligatures and brackets to eliminate difficulties when positioning units

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine individual pre-cast parapet unit location

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine sequence of parapet installation and carry out

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check parapets for conformity to design prior to lifting

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check lifting points on pre-cast units for serviceability

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install pre-cast parapet units

  1. Raise pre-cast parapet end unit to allow fitting of bracket
  2. Manoeuvre pre-cast parapet unit into the vertical position
  3. Guide pre-cast parapet unit into approximate position and attach locating bolts to cast in brackets
  4. Correctly establish vertical and horizontal alignment of pre-cast parapet end units and tighten bolts
  5. Install intermediate pre-cast parapet units in approximate positions
  6. Check pre-cast end units for correct height and alignment
  7. Adjust intermediate pre-cast parapet units to design alignment and tighten locating bolts
  8. Install anchor cable and fix ends
Raise pre-cast parapet end unit to allow fitting of bracket

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Manoeuvre pre-cast parapet unit into the vertical position

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Guide pre-cast parapet unit into approximate position and attach locating bolts to cast in brackets

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Correctly establish vertical and horizontal alignment of pre-cast parapet end units and tighten bolts

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install intermediate pre-cast parapet units in approximate positions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check pre-cast end units for correct height and alignment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Adjust intermediate pre-cast parapet units to design alignment and tighten locating bolts

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install anchor cable and fix ends

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Finish parapet

  1. Install services and fittings as required
  2. Fit joints with foam inserts and groat
  3. Form up and prepare cast in-situ infills of the pre-cast units
  4. Place concrete and finish
  5. Dismantle formwork and remove from site
  6. Clear work area and dispose of or recycle materials
  7. Clean, check, maintain and store plant, tools and equipment
Install services and fittings as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fit joints with foam inserts and groat

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Form up and prepare cast in-situ infills of the pre-cast units

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Place concrete and finish

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Dismantle formwork and remove from site

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clear work area and dispose of or recycle materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, check, maintain and store plant, tools and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

1. Plan and prepare

1.1 Access, interpret and apply documentation to install pre-cast parapets and ensure the work activity is compliant

1.2 Obtain, interpret, clarify and confirm and work instructions before proceeding

1.3 Confirm and apply environmental protection and safety requirements

1.4 Obtain, interpret and implement traffic management signage requirements

1.5 Select and check for faults plant, tools and equipment to carry out tasks

1.6 Identify, address and report environmental issues, potential hazards and risks

1.7 Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

2. Confirm installation details

2.1 Measure stirrup spacing and compare with spacing of cast in ligatures and brackets to eliminate difficulties when positioning units

2.2 Determine individual pre-cast parapet unit location

2.3 Determine sequence of parapet installation and carry out

2.4 Check parapets for conformity to design prior to lifting

2.5 Check lifting points on pre-cast units for serviceability

3. Install pre-cast parapet units

3.1 Raise pre-cast parapet end unit to allow fitting of bracket

3.2 Manoeuvre pre-cast parapet unit into the vertical position

3.3 Guide pre-cast parapet unit into approximate position and attach locating bolts to cast in brackets

3.4 Correctly establish vertical and horizontal alignment of pre-cast parapet end units and tighten bolts

3.5 Install intermediate pre-cast parapet units in approximate positions

3.6 Check pre-cast end units for correct height and alignment

3.7 Adjust intermediate pre-cast parapet units to design alignment and tighten locating bolts

3.8 Install anchor cable and fix ends

4. Finish parapet

4.1 Install services and fittings as required

4.2 Fit joints with foam inserts and groat

4.3 Form up and prepare cast in-situ infills of the pre-cast units

4.4 Place concrete and finish

4.5 Dismantle formwork and remove from site

5. Clean up

5.1 Clear work area and dispose of or recycle materials

5.2 Clean, check, maintain and store plant, tools and equipment

Required Skills and Knowledge

1. Plan and prepare

1.1 Access, interpret and apply documentation to install pre-cast parapets and ensure the work activity is compliant

1.2 Obtain, interpret, clarify and confirm and work instructions before proceeding

1.3 Confirm and apply environmental protection and safety requirements

1.4 Obtain, interpret and implement traffic management signage requirements

1.5 Select and check for faults plant, tools and equipment to carry out tasks

1.6 Identify, address and report environmental issues, potential hazards and risks

1.7 Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

2. Confirm installation details

2.1 Measure stirrup spacing and compare with spacing of cast in ligatures and brackets to eliminate difficulties when positioning units

2.2 Determine individual pre-cast parapet unit location

2.3 Determine sequence of parapet installation and carry out

2.4 Check parapets for conformity to design prior to lifting

2.5 Check lifting points on pre-cast units for serviceability

3. Install pre-cast parapet units

3.1 Raise pre-cast parapet end unit to allow fitting of bracket

3.2 Manoeuvre pre-cast parapet unit into the vertical position

3.3 Guide pre-cast parapet unit into approximate position and attach locating bolts to cast in brackets

3.4 Correctly establish vertical and horizontal alignment of pre-cast parapet end units and tighten bolts

3.5 Install intermediate pre-cast parapet units in approximate positions

3.6 Check pre-cast end units for correct height and alignment

3.7 Adjust intermediate pre-cast parapet units to design alignment and tighten locating bolts

3.8 Install anchor cable and fix ends

4. Finish parapet

4.1 Install services and fittings as required

4.2 Fit joints with foam inserts and groat

4.3 Form up and prepare cast in-situ infills of the pre-cast units

4.4 Place concrete and finish

4.5 Dismantle formwork and remove from site

5. Clean up

5.1 Clear work area and dispose of or recycle materials

5.2 Clean, check, maintain and store plant, tools and equipment

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies applicable legislation, documentation, policies and procedures

works effectively with others to undertake and complete the installation of pre-cast parapets that meets all of the required outcomes including:

using a range of communication techniques and equipment to convey information to others

maintaining written and verbal reporting requirements and procedures

communicating clearly and concisely with others to receive and clarify work instructions

implementing traffic management signage

demonstrates completion of installing pre-cast parapets that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

determining the location and sequence of individual pre-cast parapet unit and installation

checking lifting points and conformity to design prior to lifting

positioning, fixing and finishing the pre-cast parapet units including the installation of end units, services and fittings for a multi-span bridge with a minimum length of twenty (20) metres to specifications

manoeuvring, positioning and adjusting parapets

The candidate must demonstrate knowledge of the following in applying the install pre-cast parapets through:

applying legislative, organisation and site requirements for:

risk assessment and management

site and equipment safety requirements

bridge construction and sequencing

pre-cast concrete parapets and installation

bridge barriers

concrete and concreting

service installation

safe lifting techniques

safe working procedures for working at heights and over water

site isolation and traffic control responsibilities and authorities

project quality requirements

civil construction terminology

interpreting engineering drawings

equipment types, characteristics, technical capabilities and limitations

safety data sheets and materials handling methods

JSA/JSEA/safe work method statements