Evidence Guide: RIICBM305D - Install pre-cast concrete bridge decks

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

RIICBM305D - Install pre-cast concrete bridge decks

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare to install pre-cast concrete bridge decks

  1. Access, interpret and apply documentation to install pre-cast concrete bridge decks and ensure the work activity is compliant
  2. Obtain, interpret, clarify and confirm work instructions before proceeding
  3. Confirm and apply environmental protection and safety requirements
  4. Obtain, interpret and implement traffic management signage
  5. Select and check for faults plant, tools and equipment to carry out tasks
  6. Identify, address and report hazards, risks and environmental issues
  7. Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency
Access, interpret and apply documentation to install pre-cast concrete bridge decks and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, interpret, clarify and confirm work instructions before proceeding

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm and apply environmental protection and safety requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, interpret and implement traffic management signage

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and check for faults plant, tools and equipment to carry out tasks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, address and report hazards, risks and environmental issues

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install bearings

  1. Determine bearing types and position
  2. Check bearing dimensions and material for quality
  3. Install bearings
  4. Identify locating brackets/bolts and install in preparation for placement of girders
Determine bearing types and position

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check bearing dimensions and material for quality

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install bearings

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify locating brackets/bolts and install in preparation for placement of girders

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install concrete bridge deck

  1. Prepare deck components for grouting prior to placement
  2. Place deck components
  3. Carry out and complete pre-fabricated concrete decking grouting
  4. Insert and tension pre-fabricated concrete decking transverse stressing bar
  5. Grout transverse stressing bar
  6. Grout anchor bolts
  7. Place and specify deck joints of pre-fabricated decking and scuppers
Prepare deck components for grouting prior to placement

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Place deck components

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out and complete pre-fabricated concrete decking grouting

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Insert and tension pre-fabricated concrete decking transverse stressing bar

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Grout transverse stressing bar

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Grout anchor bolts

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Place and specify deck joints of pre-fabricated decking and scuppers

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fix bridge fittings

  1. Fit posts and bridge rails
  2. Assemble and install pre-fabricated stairs
Fit posts and bridge rails

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assemble and install pre-fabricated stairs

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean up

  1. Clear work area and dispose of or recycle materials
  2. Clean, check, maintain and store plant, tools and equipment
Clear work area and dispose of or recycle materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, check, maintain and store plant, tools and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan and prepare to install pre-cast concrete bridge decks

  1. Access, interpret and apply documentation to install pre-cast concrete bridge decks and ensure the work activity is compliant
  2. Obtain, interpret, clarify and confirm work instructions before proceeding
  3. Confirm and apply environmental protection and safety requirements
  4. Obtain, interpret and implement traffic management signage
  5. Select and check for faults plant, tools and equipment to carry out tasks
  6. Identify, address and report hazards, risks and environmental issues
  7. Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency
Access, interpret and apply documentation to install pre-cast concrete bridge decks and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, interpret, clarify and confirm work instructions before proceeding

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm and apply environmental protection and safety requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, interpret and implement traffic management signage

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and check for faults plant, tools and equipment to carry out tasks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, address and report hazards, risks and environmental issues

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install bearings

  1. Determine bearing types and position
  2. Check bearing dimensions and material for quality
  3. Install bearings
  4. Identify locating brackets/bolts and install in preparation for placement of girders
Determine bearing types and position

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check bearing dimensions and material for quality

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install bearings

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify locating brackets/bolts and install in preparation for placement of girders

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install concrete bridge deck

  1. Prepare deck components for grouting prior to placement
  2. Place deck components
  3. Carry out and complete pre-fabricated concrete decking grouting
  4. Insert and tension pre-fabricated concrete decking transverse stressing bar
  5. Grout transverse stressing bar
  6. Grout anchor bolts
  7. Place and specify deck joints of pre-fabricated decking and scuppers
Prepare deck components for grouting prior to placement

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Place deck components

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out and complete pre-fabricated concrete decking grouting

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Insert and tension pre-fabricated concrete decking transverse stressing bar

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Grout transverse stressing bar

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Grout anchor bolts

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Place and specify deck joints of pre-fabricated decking and scuppers

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fix bridge fittings

  1. Fit posts and bridge rails
  2. Assemble and install pre-fabricated stairs
  3. Clear work area and dispose of or recycle materials
  4. Clean, check, maintain and store plant, tools and equipment
Fit posts and bridge rails

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assemble and install pre-fabricated stairs

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clear work area and dispose of or recycle materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, check, maintain and store plant, tools and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

1. Plan and prepare to install pre-cast concrete bridge decks

1.1 Access, interpret and apply documentation to install pre-cast concrete bridge decks and ensure the work activity is compliant

1.2 Obtain, interpret, clarify and confirm work instructions before proceeding

1.3 Confirm and apply environmental protection and safety requirements

1.4 Obtain, interpret and implement traffic management signage

1.5 Select and check for faults plant, tools and equipment to carry out tasks

1.6 Identify, address and report hazards, risks and environmental issues

1.7 Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

2. Install bearings

2.1 Determine bearing types and position

2.2 Check bearing dimensions and material for quality

2.3 Install bearings

2.4 Identify locating brackets/bolts and install in preparation for placement of girders

3. Install concrete bridge deck

3.1 Prepare deck components for grouting prior to placement

3.2 Place deck components

3.3 Carry out and complete pre-fabricated concrete decking grouting

3.4 Insert and tension pre-fabricated concrete decking transverse stressing bar

3.5 Grout transverse stressing bar

3.6 Grout anchor bolts

3.7 Place and specify deck joints of pre-fabricated decking and scuppers

4. Fix bridge fittings

4.1 Fit posts and bridge rails

4.2 Assemble and install pre-fabricated stairs

5. Clean up

5.1 Clear work area and dispose of or recycle materials

5.2 Clean, check, maintain and store plant, tools and equipment

Required Skills and Knowledge

1. Plan and prepare to install pre-cast concrete bridge decks

1.1 Access, interpret and apply documentation to install pre-cast concrete bridge decks and ensure the work activity is compliant

1.2 Obtain, interpret, clarify and confirm work instructions before proceeding

1.3 Confirm and apply environmental protection and safety requirements

1.4 Obtain, interpret and implement traffic management signage

1.5 Select and check for faults plant, tools and equipment to carry out tasks

1.6 Identify, address and report hazards, risks and environmental issues

1.7 Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

2. Install bearings

2.1 Determine bearing types and position

2.2 Check bearing dimensions and material for quality

2.3 Install bearings

2.4 Identify locating brackets/bolts and install in preparation for placement of girders

3. Install concrete bridge deck

3.1 Prepare deck components for grouting prior to placement

3.2 Place deck components

3.3 Carry out and complete pre-fabricated concrete decking grouting

3.4 Insert and tension pre-fabricated concrete decking transverse stressing bar

3.5 Grout transverse stressing bar

3.6 Grout anchor bolts

3.7 Place and specify deck joints of pre-fabricated decking and scuppers

4. Fix bridge fittings

4.1 Fit posts and bridge rails

4.2 Assemble and install pre-fabricated stairs

5. Clean up

5.1 Clear work area and dispose of or recycle materials

5.2 Clean, check, maintain and store plant, tools and equipment

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies applicable legislation, documentation, policies and procedures

works effectively with others to undertake and complete the installation of pre-cast concrete bridge decks that meets all of the required outcomes including:

communicating clearly and concisely with others to receive and clarify work instructions

using a range of communication techniques and systems such as signage to advise others of work activity and exclusion zones

demonstrates completion of installing pre-cast concrete bridge decks that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

installing bearings and brackets/bolts in preparation for placement of girders

installing pre-cast concrete deck units including installation of transverse stressing bars and bearings on a multi-span bridge with a minimum length of twenty (20) metres to specifications

assembling and installing pre-fabricated stairs

The candidate must demonstrate knowledge of the following in applying the install pre-cast concrete bridge decks through:

applying legislative, organisational and site requirements and procedures for:

risk assessment and management

site and equipment safety requirements

bridge construction and sequencing

pre-cast concrete bridge decks and installation

bearing types and installation

safe lifting techniques

safe working procedures, working at heights and over water

project quality requirements

civil construction terminology

interpreting engineering drawings

equipment types, characteristics, technical capabilities and limitations

site isolation and traffic control responsibilities and authorities

safety data sheets and materials handling methods

JSA/JSEA/safe work method statements