The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare
|
|
Access, interpret and apply construct formwork and false work on concrete bridges documentation and ensure the work activity is compliant Completed |
Evidence:
|
Obtain, interpret, clarify and confirm work instructions before proceeding Completed |
Evidence:
|
Confirm and apply environmental protection and safety requirements Completed |
Evidence:
|
Obtain, interpret and implement traffic management signage requirements Completed |
Evidence:
|
Select and check for faults plant, tools and equipment to carry out tasks Completed |
Evidence:
|
Identify, address and report hazards, risks and environmental issues Completed |
Evidence:
|
Prepare for formwork erection
|
|
Identify and confirm location and design of formwork/false work Completed |
Evidence:
|
Accurately place key set out locations Completed |
Evidence:
|
Prepare work area and materials for the erection of formwork/false work Completed |
Evidence:
|
Assemble formwork shutters Completed |
Evidence:
|
Sequentially erect formwork support system (false work) Completed |
Evidence:
|
Check scaffolding and/or hand railing where required Completed |
Evidence:
|
Place bracing of formwork support to maintain rigidity and stability Completed |
Evidence:
|
Set support system to correct height level, line and tolerance Completed |
Evidence:
|
Erect formwork
|
|
Fabricate, position and fix formwork for beams, drop panels and cantilevers into place Completed |
Evidence:
|
Assemble, erect and fix formwork for walls into place, plumb and to specified tolerance Completed |
Evidence:
|
Fabricate, position and fix soffit formwork into place Completed |
Evidence:
|
Fix edge boxing to formwork in correct position and plumb to alignment. Completed |
Evidence:
|
Brace formwork Completed |
Evidence:
|
Install cast-ins, inserts and penetration blocks to locations Completed |
Evidence:
|
Inspect formwork
|
|
Inspect erected formwork and formwork support system for safety and quality of work Completed |
Evidence:
|
Remove loose dirt, sawdust and other waste material with due care to welfare of site personnel and public Completed |
Evidence:
|
Apply release agent to formwork Completed |
Evidence:
|
Monitor formwork and support system during concrete pour Completed |
Evidence:
|
Stripping of formwork
|
|
Obtain approval to remove formwork/false work support Completed |
Evidence:
|
Carefully remove edge boxing and braces, denail, clean and store/stack Completed |
Evidence:
|
Back off support system to appropriate height to loosen soffit decking Completed |
Evidence:
|
Safely and sequentially remove formwork, denail and relocate or store Completed |
Evidence:
|
Select and install appropriate back propping system, where applicable Completed |
Evidence:
|
Clean up
|
|
Clear work area and dispose of or recycle materials Completed |
Evidence:
|
Clean, check, maintain and store plant, tools and equipment Completed |
Evidence:
|
Plan and prepare
|
|
Access, interpret and apply construct formwork and false work on concrete bridges documentation and ensure the work activity is compliant Completed |
Evidence:
|
Obtain, interpret, clarify and confirm work instructions before proceeding Completed |
Evidence:
|
Confirm and apply environmental protection and safety requirements Completed |
Evidence:
|
Obtain, interpret and implement traffic management signage requirements Completed |
Evidence:
|
Select and check for faults plant, tools and equipment to carry out tasks Completed |
Evidence:
|
Identify, address and report hazards, risks and environmental issues Completed |
Evidence:
|
Prepare for formwork erection
|
|
Identify and confirm location and design of formwork/false work Completed |
Evidence:
|
Accurately place key set out locations Completed |
Evidence:
|
Prepare work area and materials for the erection of formwork/false work Completed |
Evidence:
|
Assemble formwork shutters Completed |
Evidence:
|
Sequentially erect formwork support system (false work) Completed |
Evidence:
|
Check scaffolding and/or hand railing where required Completed |
Evidence:
|
Place bracing of formwork support to maintain rigidity and stability Completed |
Evidence:
|
Set support system to correct height level, line and tolerance Completed |
Evidence:
|
Erect formwork
|
|
Fabricate, position and fix formwork for beams, drop panels and cantilevers into place Completed |
Evidence:
|
Assemble, erect and fix formwork for walls into place, plumb and to specified tolerance Completed |
Evidence:
|
Fabricate, position and fix soffit formwork into place Completed |
Evidence:
|
Fix edge boxing to formwork in correct position and plumb to alignment. Completed |
Evidence:
|
Brace formwork Completed |
Evidence:
|
Install cast-ins, inserts and penetration blocks to locations Completed |
Evidence:
|
Inspect formwork
|
|
Inspect erected formwork and formwork support system for safety and quality of work Completed |
Evidence:
|
Remove loose dirt, sawdust and other waste material with due care to welfare of site personnel and public Completed |
Evidence:
|
Apply release agent to formwork Completed |
Evidence:
|
Monitor formwork and support system during concrete pour Completed |
Evidence:
|
Stripping of formwork
|
|
Obtain approval to remove formwork/false work support Completed |
Evidence:
|
Carefully remove edge boxing and braces, denail, clean and store/stack Completed |
Evidence:
|
Back off support system to appropriate height to loosen soffit decking Completed |
Evidence:
|
Safely and sequentially remove formwork, denail and relocate or store Completed |
Evidence:
|
Select and install appropriate back propping system, where applicable Completed |
Evidence:
|
Clear work area and dispose of or recycle materials Completed |
Evidence:
|
Clean, check, maintain and store plant, tools and equipment Completed |
Evidence:
|