NTISthis.com

Evidence Guide: RIICBM307D - Construct formwork and false work on concrete bridges

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

RIICBM307D - Construct formwork and false work on concrete bridges

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare

  1. Access, interpret and apply construct formwork and false work on concrete bridges documentation and ensure the work activity is compliant
  2. Obtain, interpret, clarify and confirm work instructions before proceeding
  3. Confirm and apply environmental protection and safety requirements
  4. Obtain, interpret and implement traffic management signage requirements
  5. Select and check for faults plant, tools and equipment to carry out tasks
  6. Identify, address and report hazards, risks and environmental issues
Access, interpret and apply construct formwork and false work on concrete bridges documentation and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, interpret, clarify and confirm work instructions before proceeding

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm and apply environmental protection and safety requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, interpret and implement traffic management signage requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and check for faults plant, tools and equipment to carry out tasks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, address and report hazards, risks and environmental issues

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare for formwork erection

  1. Identify and confirm location and design of formwork/false work
  2. Accurately place key set out locations
  3. Prepare work area and materials for the erection of formwork/false work
  4. Assemble formwork shutters
  5. Sequentially erect formwork support system (false work)
  6. Check scaffolding and/or hand railing where required
  7. Place bracing of formwork support to maintain rigidity and stability
  8. Set support system to correct height level, line and tolerance
Identify and confirm location and design of formwork/false work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Accurately place key set out locations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare work area and materials for the erection of formwork/false work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assemble formwork shutters

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Sequentially erect formwork support system (false work)

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check scaffolding and/or hand railing where required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Place bracing of formwork support to maintain rigidity and stability

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set support system to correct height level, line and tolerance

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Erect formwork

  1. Fabricate, position and fix formwork for beams, drop panels and cantilevers into place
  2. Assemble, erect and fix formwork for walls into place, plumb and to specified tolerance
  3. Fabricate, position and fix soffit formwork into place
  4. Fix edge boxing to formwork in correct position and plumb to alignment.
  5. Brace formwork
  6. Install cast-ins, inserts and penetration blocks to locations
Fabricate, position and fix formwork for beams, drop panels and cantilevers into place

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assemble, erect and fix formwork for walls into place, plumb and to specified tolerance

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fabricate, position and fix soffit formwork into place

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fix edge boxing to formwork in correct position and plumb to alignment.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Brace formwork

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install cast-ins, inserts and penetration blocks to locations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect formwork

  1. Inspect erected formwork and formwork support system for safety and quality of work
  2. Remove loose dirt, sawdust and other waste material with due care to welfare of site personnel and public
  3. Apply release agent to formwork
  4. Monitor formwork and support system during concrete pour
Inspect erected formwork and formwork support system for safety and quality of work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Remove loose dirt, sawdust and other waste material with due care to welfare of site personnel and public

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Apply release agent to formwork

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor formwork and support system during concrete pour

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Stripping of formwork

  1. Obtain approval to remove formwork/false work support
  2. Carefully remove edge boxing and braces, denail, clean and store/stack
  3. Back off support system to appropriate height to loosen soffit decking
  4. Safely and sequentially remove formwork, denail and relocate or store
  5. Select and install appropriate back propping system, where applicable
Obtain approval to remove formwork/false work support

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carefully remove edge boxing and braces, denail, clean and store/stack

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Back off support system to appropriate height to loosen soffit decking

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Safely and sequentially remove formwork, denail and relocate or store

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and install appropriate back propping system, where applicable

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean up

  1. Clear work area and dispose of or recycle materials
  2. Clean, check, maintain and store plant, tools and equipment
Clear work area and dispose of or recycle materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, check, maintain and store plant, tools and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan and prepare

  1. Access, interpret and apply construct formwork and false work on concrete bridges documentation and ensure the work activity is compliant
  2. Obtain, interpret, clarify and confirm work instructions before proceeding
  3. Confirm and apply environmental protection and safety requirements
  4. Obtain, interpret and implement traffic management signage requirements
  5. Select and check for faults plant, tools and equipment to carry out tasks
  6. Identify, address and report hazards, risks and environmental issues
Access, interpret and apply construct formwork and false work on concrete bridges documentation and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, interpret, clarify and confirm work instructions before proceeding

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm and apply environmental protection and safety requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, interpret and implement traffic management signage requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and check for faults plant, tools and equipment to carry out tasks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, address and report hazards, risks and environmental issues

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare for formwork erection

  1. Identify and confirm location and design of formwork/false work
  2. Accurately place key set out locations
  3. Prepare work area and materials for the erection of formwork/false work
  4. Assemble formwork shutters
  5. Sequentially erect formwork support system (false work)
  6. Check scaffolding and/or hand railing where required
  7. Place bracing of formwork support to maintain rigidity and stability
  8. Set support system to correct height level, line and tolerance
Identify and confirm location and design of formwork/false work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Accurately place key set out locations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare work area and materials for the erection of formwork/false work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assemble formwork shutters

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Sequentially erect formwork support system (false work)

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check scaffolding and/or hand railing where required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Place bracing of formwork support to maintain rigidity and stability

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set support system to correct height level, line and tolerance

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Erect formwork

  1. Fabricate, position and fix formwork for beams, drop panels and cantilevers into place
  2. Assemble, erect and fix formwork for walls into place, plumb and to specified tolerance
  3. Fabricate, position and fix soffit formwork into place
  4. Fix edge boxing to formwork in correct position and plumb to alignment.
  5. Brace formwork
  6. Install cast-ins, inserts and penetration blocks to locations
Fabricate, position and fix formwork for beams, drop panels and cantilevers into place

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assemble, erect and fix formwork for walls into place, plumb and to specified tolerance

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fabricate, position and fix soffit formwork into place

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fix edge boxing to formwork in correct position and plumb to alignment.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Brace formwork

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install cast-ins, inserts and penetration blocks to locations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect formwork

  1. Inspect erected formwork and formwork support system for safety and quality of work
  2. Remove loose dirt, sawdust and other waste material with due care to welfare of site personnel and public
  3. Apply release agent to formwork
  4. Monitor formwork and support system during concrete pour
Inspect erected formwork and formwork support system for safety and quality of work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Remove loose dirt, sawdust and other waste material with due care to welfare of site personnel and public

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Apply release agent to formwork

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor formwork and support system during concrete pour

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Stripping of formwork

  1. Obtain approval to remove formwork/false work support
  2. Carefully remove edge boxing and braces, denail, clean and store/stack
  3. Back off support system to appropriate height to loosen soffit decking
  4. Safely and sequentially remove formwork, denail and relocate or store
  5. Select and install appropriate back propping system, where applicable
  6. Clear work area and dispose of or recycle materials
  7. Clean, check, maintain and store plant, tools and equipment
Obtain approval to remove formwork/false work support

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carefully remove edge boxing and braces, denail, clean and store/stack

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Back off support system to appropriate height to loosen soffit decking

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Safely and sequentially remove formwork, denail and relocate or store

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and install appropriate back propping system, where applicable

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clear work area and dispose of or recycle materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, check, maintain and store plant, tools and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

1. Plan and prepare

1.1 Access, interpret and apply construct formwork and false work on concrete bridges documentation and ensure the work activity is compliant

1.2 Obtain, interpret, clarify and confirm work instructions before proceeding

1.3 Confirm and apply environmental protection and safety requirements

1.4 Obtain, interpret and implement traffic management signage requirements

1.5 Select and check for faults plant, tools and equipment to carry out tasks

1.6 Identify, address and report hazards, risks and environmental issues

2. Prepare for formwork erection

2.1 Identify and confirm location and design of formwork/false work

2.2 Accurately place key set out locations

2.3 Prepare work area and materials for the erection of formwork/false work

2.4 Assemble formwork shutters

2.5 Sequentially erect formwork support system (false work)

2.6 Check scaffolding and/or hand railing where required

2.7 Place bracing of formwork support to maintain rigidity and stability

2.8 Set support system to correct height level, line and tolerance

3. Erect formwork

3.1 Fabricate, position and fix formwork for beams, drop panels and cantilevers into place

3.2 Assemble, erect and fix formwork for walls into place, plumb and to specified tolerance

3.3 Fabricate, position and fix soffit formwork into place

3.4 Fix edge boxing to formwork in correct position and plumb to alignment.

3.5 Brace formwork

3.6 Install cast-ins, inserts and penetration blocks to locations

4. Inspect formwork

4.1 Inspect erected formwork and formwork support system for safety and quality of work

4.2 Remove loose dirt, sawdust and other waste material with due care to welfare of site personnel and public

4.3 Apply release agent to formwork

4.4 Monitor formwork and support system during concrete pour

5. Stripping of formwork

5.1 Obtain approval to remove formwork/false work support

5.2 Carefully remove edge boxing and braces, denail, clean and store/stack

5.3 Back off support system to appropriate height to loosen soffit decking

5.4 Safely and sequentially remove formwork, denail and relocate or store

5.5 Select and install appropriate back propping system, where applicable

6. Clean up

6.1 Clear work area and dispose of or recycle materials

6.2 Clean, check, maintain and store plant, tools and equipment

Required Skills and Knowledge

1. Plan and prepare

1.1 Access, interpret and apply construct formwork and false work on concrete bridges documentation and ensure the work activity is compliant

1.2 Obtain, interpret, clarify and confirm work instructions before proceeding

1.3 Confirm and apply environmental protection and safety requirements

1.4 Obtain, interpret and implement traffic management signage requirements

1.5 Select and check for faults plant, tools and equipment to carry out tasks

1.6 Identify, address and report hazards, risks and environmental issues

2. Prepare for formwork erection

2.1 Identify and confirm location and design of formwork/false work

2.2 Accurately place key set out locations

2.3 Prepare work area and materials for the erection of formwork/false work

2.4 Assemble formwork shutters

2.5 Sequentially erect formwork support system (false work)

2.6 Check scaffolding and/or hand railing where required

2.7 Place bracing of formwork support to maintain rigidity and stability

2.8 Set support system to correct height level, line and tolerance

3. Erect formwork

3.1 Fabricate, position and fix formwork for beams, drop panels and cantilevers into place

3.2 Assemble, erect and fix formwork for walls into place, plumb and to specified tolerance

3.3 Fabricate, position and fix soffit formwork into place

3.4 Fix edge boxing to formwork in correct position and plumb to alignment.

3.5 Brace formwork

3.6 Install cast-ins, inserts and penetration blocks to locations

4. Inspect formwork

4.1 Inspect erected formwork and formwork support system for safety and quality of work

4.2 Remove loose dirt, sawdust and other waste material with due care to welfare of site personnel and public

4.3 Apply release agent to formwork

4.4 Monitor formwork and support system during concrete pour

5. Stripping of formwork

5.1 Obtain approval to remove formwork/false work support

5.2 Carefully remove edge boxing and braces, denail, clean and store/stack

5.3 Back off support system to appropriate height to loosen soffit decking

5.4 Safely and sequentially remove formwork, denail and relocate or store

5.5 Select and install appropriate back propping system, where applicable

6. Clean up

6.1 Clear work area and dispose of or recycle materials

6.2 Clean, check, maintain and store plant, tools and equipment

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies applicable legislation, documentation, policies and procedures

works effectively with others to undertake and complete the construction of formwork and false work on concrete bridges that meets all of the required outcomes including:

communicating clearly and concisely with others to receive and clarify work instructions

using a range of communication techniques and systems such as signage to advise others of work activity and exclusion zones

demonstrates completion of constructing formwork and false work on concrete bridges that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

preparing for formwork erection

erecting and dismantling formwork and false work on concrete multi-span bridge with a minimum length of twenty (20) metres for each:

casting in situ decks

concrete footings/pile caps/abutments

piers and headstocks

inspecting and monitoring erected formwork and support system

The candidate must demonstrate knowledge of the following in applying the construct formwork and false work on concrete bridges through:

applying legislative, organisation and site requirements for:

site and equipment safety requirements

bridge construction and sequencing

formwork and falsework

steel reinforcement

concrete

bracing and loading

structural characteristics of reinforced concrete

working in confined spaces

working at heights and over water

project quality requirements

civil construction terminology

interpreting engineering drawings

equipment types, characteristics, technical capabilities and limitations

operational, maintenance and basic diagnostic procedures

applying site isolation and traffic control responsibilities and authorities

safety data sheets and materials handling methods

JSA/JSEA/safe work method statements