NTISthis.com

Evidence Guide: RIICBS301A - Conduct profile planer operations

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

RIICBS301A - Conduct profile planer operations

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare

  1. Access, interpret and apply compliance documentation relevant to the work activity
  2. Obtain and confirm safety requirements from the site safety plan and organisational policies and procedures, and apply to the allotted task
  3. Identify, obtain and implement signage requirements from the project traffic management plan
  4. Select plant, tools and equipment to carry out tasks consistent with the requirements of the job, check for serviceability and rectify or report any faults
  5. Identify environmental protection requirements from the project environmental management plan, and confirm and apply to the allotted task
Access, interpret and apply compliance documentation relevant to the work activity

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain and confirm safety requirements from the site safety plan and organisational policies and procedures, and apply to the allotted task

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, obtain and implement signage requirements from the project traffic management plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select plant, tools and equipment to carry out tasks consistent with the requirements of the job, check for serviceability and rectify or report any faults

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify environmental protection requirements from the project environmental management plan, and confirm and apply to the allotted task

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct profile planer pre-operational checks

  1. Carry out pre-start, start-up, park and shutdown procedures in accordance with manufacturer's and/or site specific requirements
  2. Check profile planer controls and functions, including implements or other attachments, brakes and manoeuvrability for serviceability and rectify and report any faults
Carry out pre-start, start-up, park and shutdown procedures in accordance with manufacturer's and/or site specific requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check profile planer controls and functions, including implements or other attachments, brakes and manoeuvrability for serviceability and rectify and report any faults

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operate profile planer

  1. Identify site hazards associated with profile planer operations and use safe operating techniques to minimise risk
  2. Identify and apply operating techniques for profile planer to achieve optimum output in accordance with manufacturer's design specifications while achieving specified tolerances
  3. Operate profile planer to work instructions
  4. Operate profile planer to remove material to an agreed line and level within specified tolerances
Identify site hazards associated with profile planer operations and use safe operating techniques to minimise risk

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and apply operating techniques for profile planer to achieve optimum output in accordance with manufacturer's design specifications while achieving specified tolerances

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operate profile planer to work instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operate profile planer to remove material to an agreed line and level within specified tolerances

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select, remove and fit attachments

  1. Select attachment for the task
  2. Remove and fit attachment according to manufacturer's manual and site requirements
  3. Test attachment to ensure correct fitting and operation
  4. Use attachment in accordance with manufacturer's recommendations and design limits
  5. Clean and store removed attachments in designated location
Select attachment for the task

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Remove and fit attachment according to manufacturer's manual and site requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Test attachment to ensure correct fitting and operation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Use attachment in accordance with manufacturer's recommendations and design limits

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean and store removed attachments in designated location

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relocate the profile planer

  1. Move profile planer safely between worksites, observing relevant codes and traffic management requirements
  2. Prepare profile planer for relocation
Move profile planer safely between worksites, observing relevant codes and traffic management requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare profile planer for relocation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out profile planer operator maintenance

  1. Park profile planer safely, prepare for maintenance and shutdown
  2. Conduct inspection and fault finding
  3. Remove defective parts and replace safely and effectively
  4. Carry out regular programmed maintenances tasks
Park profile planer safely, prepare for maintenance and shutdown

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct inspection and fault finding

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Remove defective parts and replace safely and effectively

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out regular programmed maintenances tasks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean up

  1. Clear work area and dispose of or recycle materials in accordance with project environmental management plan
  2. Clean, check, and store profile planer, tools and equipment and conduct operator maintenance
Clear work area and dispose of or recycle materials in accordance with project environmental management plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, check, and store profile planer, tools and equipment and conduct operator maintenance

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit

The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:

knowledge of the requirements, procedures and instructions for conducting profile planer operations

implementation of requirements, procedures and techniques for the safe, effective and efficient conduct of profile planer operations

working with others to undertake and complete the conduct of profile planer operations that meets all of the required outcomes

consistent timely completion of profile planer operations that safely, effectively and efficiently meets the required outcomes

the conduct of profile planer operations are to be performed in a minimum of two different material types/surfaces types and are to include the mandatory tasks of removal/excavation of materials to a thickness and a line/level, loading of trucks and stockpiling

operations including asphalt pavement, milling, edge planning, straight work and confined work (such as intersection, carpark etc)

the application of emergency procedures

the conduct of authorised operator maintenance

Context of and specific resources for assessment

This unit must be assessed in the context of the work environment. Where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills.

Assessment of this competency requires typical resources normally used in a resources and infrastructure sector environment. Selection and use of resources for particular worksites may differ due to the site circumstances.

The assessment environment should not disadvantage the participant. For example, language, literacy and numeracy demands of assessment should not be greater than those required on the job.

Customisation of assessment and delivery environment to sensitively accommodate cultural diversity.

Aboriginal people and other people from a non English speaking background may have second language issues.

Where applicable, physical resources should include equipment modified for people with disabilities. Access must be provided to appropriate learning and/or assessment support when required.

Method of assessment

This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:

written and/or oral assessment of the candidate's required knowledge

observed, documented and/or first hand testimonial evidence of the candidate's:

implementation of appropriate requirement, procedures and techniques for the safe, effective and efficient achievement of required outcomes

consistent achievement of required outcomes

first hand testimonial evidence of the candidate's:

working with others to undertake and complete profile planer operations

Guidance information for assessment

Consult the SkillsDMC User Guide for further information on assessment including access and equity issues.

Required Skills and Knowledge

Required skills

Specific skills are required to achieve the Performance Criteria of this unit, particularly for its application in the various circumstances in which this unit may be used. This includes the ability to carry out the following, as required to conduct profile planer operations:

apply legislative, organisation and site requirements and procedures for conducting profile planer operations

organise work activities

select and use relevant tools and equipment safely

identify and report on hazards related to the worksite and work activity

communicate effectively to receive and clarify work instructions

Required knowledge

Specific knowledge is required to achieve the Performance Criteria of this unit, particularly for its application in the various circumstances in which this unit may be used. This includes knowledge of the following, as required to conduct profile planer operations:

profile planer types, characteristics, technical capabilities and limitations

basic soil types and characteristics

basic principles of soil compaction

site and equipment safety requirements

profile planer techniques related to essential tasks

processes for interpreting engineering drawings and sketches

operational, maintenance and basic diagnostic procedures

site isolation and traffic control responsibilities and authorities

materials safety data sheets and materials handling methods

project quality requirements

civil construction terminology

methods of changing machine attachments

safe operating techniques in all terrain

basic earthworks calculations

JSAs/safe work method statements

Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Relevant compliance documentation may include:

legislative, organisational and site requirements and procedures

manufacturer's guidelines and specifications

Australian standards

Employment and workplace relations legislation

Equal Employment Opportunity and Disability Discrimination legislation

Safety requirements may include:

OHS requirements in accordance with state or territory legislation and regulations, organisational safety policies and procedures, and project safety plan, including protective clothing and equipment, use of tools and equipment, workplace environment and safety, handling of materials, use of fire fighting equipment, use of First Aid equipment, hazard control and hazardous materials and substances

safe parking practices including ensuring access ways are clear, equipment/machinery is away from overhangs and refuelling sites, safe distance are kept from excavations, and areas secured from unauthorised access or movement

safe operating procedures including recognising and preventing hazards associated with uneven/unstable terrain, trees, pits, poles, trip hazards, dirt mounds, overhead service lines, bridges, surrounding buildings, obstructions, structures, facilities, dangerous materials, recently filled trenches, other machines, personnel, traffic control, working in proximity to others, worksite visitors and the public

recognising hazards and risks including uneven/unstable terrain, trees, fires, overhead and underground services, bridges, buildings, excavations, traffic, embankments, cuttings, structures and hazardous materials

emergency procedures related to equipment operation including emergency shutdown and stopping, extinguishing equipment fires, organisational First Aid requirements and evacuation

Signage may include:

escort vehicle

highway traffic signs

site safety signage

temporary signage for the benefit of motorists and pedestrians

traffic conditions signage

Traffic conditions may include:

congested urban environments

low traffic rural areas

off-road un-trafficked areas

buildings

parking sites

pedestrian areas

Tools and equipment may include:

hand tools

maintenance equipment relevant to the particular profile planer

Environmental protection requirements may include:

organisational/project environmental management plan

waste management

water quality protection

noise

vibration

dust and clean-up management

Profile planer refers to:

a self propelled wheeled or tracked machine designed for the purpose of in-situ milling of construction materials, and transferring the milled materials via conveyor to storage or tip trucks

Attachments may include:

additional or interchangeable conveyor systems

Operations may include:

asphalt pavement milling

edge planning

straight work

confined work (such as intersection, carpark etc)

Operator maintenance may refer to:

cleaning

authorised servicing

monitoring, recording and reporting of faults

authorised minor replacements

provision of assistance to maintenance personnel during maintenance and repair activities