Evidence Guide: RIICBS302A - Conduct paver screeding operations

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

RIICBS302A - Conduct paver screeding operations

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare

  1. Access, interpret and apply compliance documentation relevant to the work activity
  2. Obtain and confirm safety requirements from the site safety plan and organisational policies and procedures, and apply to the allotted task
  3. Identify, obtain and implement signage requirements from the project traffic management plan
  4. Select plant, tools and equipment to carry out tasks consistent with the requirements of the job, check for serviceability and rectify or report any faults
  5. Identify environmental protection requirements from the project environmental management plan, and confirm and apply to the allotted task
Access, interpret and apply compliance documentation relevant to the work activity

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain and confirm safety requirements from the site safety plan and organisational policies and procedures, and apply to the allotted task

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, obtain and implement signage requirements from the project traffic management plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select plant, tools and equipment to carry out tasks consistent with the requirements of the job, check for serviceability and rectify or report any faults

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify environmental protection requirements from the project environmental management plan, and confirm and apply to the allotted task

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set up paver screed

  1. Set equipment to the correct levels to lay material on surface to specifications
  2. Set electronic levelling equipment to check level
  3. Set heating controls for screed to specifications
  4. Set screed controls for correct operation
Set equipment to the correct levels to lay material on surface to specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set electronic levelling equipment to check level

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set heating controls for screed to specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set screed controls for correct operation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operate paver screed

  1. Identify site hazards associated with paver screeding operations and use safe operating techniques to minimise risk
  2. Adjust screed during operation to ensure work remains within specifications
  3. Identify faults in the mat and take correct action to rectify faults
  4. Monitor work of rake hands and rollers to ensure they are keeping up with the paver
  5. Maintain communication with paver operator monitoring the progress of the job
  6. Notify paver operator of problems with the mat
  7. Perform operator maintenance in accordance with manufacturer's or company instructions
Identify site hazards associated with paver screeding operations and use safe operating techniques to minimise risk

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Adjust screed during operation to ensure work remains within specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify faults in the mat and take correct action to rectify faults

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor work of rake hands and rollers to ensure they are keeping up with the paver

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain communication with paver operator monitoring the progress of the job

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Notify paver operator of problems with the mat

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Perform operator maintenance in accordance with manufacturer's or company instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean up

  1. Handle/dispose of waste material safely in accordance with requirement of regulatory bodies, OHS, MSDS and EPA
  2. Clear work area and dispose of or recycle materials in accordance with project environmental management plan
  3. Clean, check, maintain and store plant, tools and equipment
Handle/dispose of waste material safely in accordance with requirement of regulatory bodies, OHS, MSDS and EPA

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clear work area and dispose of or recycle materials in accordance with project environmental management plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, check, maintain and store plant, tools and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit

The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:

knowledge of the requirements, procedures and instructions for conducting paver screeding operations

implementation of requirements, procedures and techniques for the safe, effective and efficient completion of paver screeding operations

working with others to undertake and complete paver screeding operations that meets all of the required outcomes

consistent timely completion of paver screeding operations that safely, effectively and efficiently meets the required outcomes

the conduct of paver screeding operations are to be performed in a minimum of two different bituminous material types/surface types and are to include the mandatory tasks:

three longitudinal joints (of at least 100m) to be constructed to required thickness, uniformity, line and level, on both matching and unsupported edge in accordance with project specifications and/or work instructions

six transverse joints to be constructed to required thickness, uniformity, line and level, on both matching and unsupported edge in accordance with project specifications and/or work instructions

five sections of straight paving (one of at least 100 linear metres) to required thickness, uniformity, line and level, on both matching and unsupported edge in accordance with project specifications and/or work instructions

three intersections to required thickness, uniformity, line and level, on both matching and unsupported edge in accordance with project specifications and/or work instructions

one of the above tasks to include at least one mode of automatic screed levelling

Context of and specific resources for assessment

This unit must be assessed in the context of the work environment. Where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills.

Assessment of this competency requires typical resources normally used in a resources and infrastructure sector environment. Selection and use of resources for particular worksites may differ due to the site circumstances.

The assessment environment should not disadvantage the participant. For example, language, literacy and numeracy demands of assessment should not be greater than those required on the job.

Customisation of assessment and delivery environment to sensitively accommodate cultural diversity.

Aboriginal people and other people from a non English speaking background may have second language issues.

Where applicable, physical resources should include equipment modified for people with disabilities. Access must be provided to appropriate learning and/or assessment support when required.

Method of assessment

This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:

written and/or oral assessment of the candidate's required knowledge

observed, documented and/or first hand testimonial evidence of the candidate's:

implementation of appropriate requirement, procedures and techniques for the safe, effective and efficient achievement of required outcomes

consistent achievement of required outcomes

first hand testimonial evidence of the candidate's:

working with others to undertake and complete paver screeding operations

Guidance information for assessment

Consult the SkillsDMC User Guide for further information on assessment including access and equity issues.

Required Skills and Knowledge

Required skills

Specific skills are required to achieve the Performance Criteria of this unit, particularly for its application in the various circumstances in which this unit may be used. This includes the ability to carry out the following, as required to conduct paver screeding operations:

apply legislative, organisation and site requirements and procedures for conducting paver screeding operations

organise work activities

select and use relevant tools and equipment safely

identify and report on hazards related to the worksite and work activity

communicate effectively to receive and clarify work instructions

Required knowledge

Specific knowledge is required to achieve the Performance Criteria of this unit, particularly for its application in the various circumstances in which this unit may be used. This includes knowledge of the following, as required to conduct paver screeding operations:

site and equipment safety requirements

paver screed operations

aggregate types and sizes

bituminous materials

longitudinal and transverse joints

equipment types, characteristics, technical capabilities and limitations

operational, maintenance and basic diagnostic procedures

site isolation and traffic control responsibilities and authorities

processes for the calculation of material uniformity and travel speed

materials safety data sheets and materials handling methods

project quality requirements

civil construction terminology

safe operating techniques in all terrain

JSAs/safe work method statements

Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Relevant compliance documentation may include:

legislative, organisational and site requirements and procedures

manufacturer's guidelines and specifications

Australian standards

Employment and workplace relations legislation

Equal Employment Opportunity and Disability Discrimination legislation

Safety requirements may include:

OHS requirements in accordance with state or territory legislation and regulations, organisational safety policies and procedures, and project safety plan, including protective clothing and equipment, use of tools and equipment, workplace environment and safety, handling of materials, use of fire fighting equipment, use of First Aid equipment, hazard control and hazardous materials and substances

safe parking practices including ensuring access ways are clear, equipment/machinery is away from overhangs and refuelling sites, safe distance are kept from excavations, and areas secured from unauthorised access or movement

safe operating procedures including recognising and preventing hazards associated with uneven/unstable terrain, trees, pits, poles, trip hazards, dirt mounds, overhead service lines, bridges, surrounding buildings, obstructions, structures, facilities, dangerous materials, recently filled trenches, other machines, personnel, traffic control, working in proximity to others, worksite visitors and the public

recognising hazards and risks including uneven/unstable terrain, trees, fires, overhead and underground services, bridges, buildings, excavations, traffic, embankments, cuttings, structures and hazardous materials

emergency procedures related to equipment operation including emergency shutdown and stopping, extinguishing equipment fires, organisational First Aid requirements and evacuation

Site may include:

car parks

airport runways

container yards

hard stands

footpaths

bikeways

roadways

Signage may include:

escort vehicle

highway traffic signs

site safety signage

temporary signage for the benefit of motorists and pedestrians

traffic conditions signage

Traffic conditions may include:

congested urban environments

low traffic rural areas

off-road un-trafficked areas

buildings

parking sites

pedestrian areas

Tools and equipment may include:

paver screeds

shovels

measuring tapes

depth gauges

standard tool kits

string lines

thermometers

straight edges

Environmental protection requirements may include:

organisational/project environmental management plan

waste management

water quality protection

noise

vibration

dust and clean-up management

Set equipment may include:

use of boards to correct the height for transverse joint construction

setting up string lines and sensors to job specifications

adjusting machine attachments to string line

preparing and setting a screed to achieve a specified level and texture of asphalt

Surface may include:

formed/prepared roads

pads

sealed

primersealed

primed

asphalt

profiled

profile concrete

slurry

Electronic levelling equipment may include:

grade sensors/averaging sensors

matching shoes

levelling beams

sonic, contact and laser

Paver screeding operations may include:

uniform flow of asphalt

electronic/manual levelling

auguring

width of the screed

adjustment of the crown

control of burners,

hot and cold transverse and longitudinal joints

manual screed level control

automatic screed level control

Operation may include:

spreading bituminous materials

mixing materials

spreading granular materials

spreading concrete materials

Communication method may include:

verbal instructions

two way radio

hand signals

mobile phone

Materials may include:

aggregates

gravel asphalt

granular materials