NTISthis.com

Evidence Guide: RIICBS304D - Compact asphalt with rollers

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

RIICBS304D - Compact asphalt with rollers

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare to compact asphalt with rollers

  1. Access, interpret and apply compact asphalt with rollers documentation and ensure the work activity is compliant
  2. Obtain, read, interpret, clarify and confirm work requirements
  3. Identify and address potential risks, hazards and environmental issues, and implement control measures
  4. Select and wear personal protective equipment appropriate for work activities
  5. Confirm and apply environmental protection and safety requirements
  6. Obtain, interpret and implement traffic management signage requirements
  7. Select and check for faults plant, tools and equipment to carry out tasks
  8. Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency
Access, interpret and apply compact asphalt with rollers documentation and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, read, interpret, clarify and confirm work requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and address potential risks, hazards and environmental issues, and implement control measures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and wear personal protective equipment appropriate for work activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm and apply environmental protection and safety requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, interpret and implement traffic management signage requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and check for faults plant, tools and equipment to carry out tasks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare roller

  1. Perform start-up, park, shutdown and secure equipment procedures
  2. Plan water usage and replenishment
  3. Set tyres to required pressure (self-propelled, multi-wheeled pneumatic tyred rollers)
Perform start-up, park, shutdown and secure equipment procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan water usage and replenishment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set tyres to required pressure (self-propelled, multi-wheeled pneumatic tyred rollers)

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Compact asphalt

  1. Determine speed and rolling patterns
  2. Set amplitude and frequency as directed for vibratory steel wheeled rollers
  3. Avoid damage to other structures
  4. Monitor watering system to prevent pick up
  5. Maintain uniform speed and rolling pattern
  6. Compact joints
  7. Compact final surface free of blemishes or rolling marks
  8. Maintain safe distance between rollers, other plant and the paving crew
Determine speed and rolling patterns

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set amplitude and frequency as directed for vibratory steel wheeled rollers

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Avoid damage to other structures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor watering system to prevent pick up

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain uniform speed and rolling pattern

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Compact joints

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Compact final surface free of blemishes or rolling marks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain safe distance between rollers, other plant and the paving crew

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out operator maintenance

  1. Prepare machine for maintenance
  2. Conduct inspection and fault finding
  3. Carry out scheduled maintenance tasks
  4. Process written maintenance records
Prepare machine for maintenance

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct inspection and fault finding

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out scheduled maintenance tasks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Process written maintenance records

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relocate roller

  1. Prepare roller for relocation
  2. Drive roller safely on highways and construction sites
Prepare roller for relocation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Drive roller safely on highways and construction sites

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean up

  1. Clear work area and dispose of or recycle materials
  2. Clean, check, maintain and store plant, tools and equipment
  3. Carry out housekeeping requirements
Clear work area and dispose of or recycle materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, check, maintain and store plant, tools and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out housekeeping requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan and prepare to compact asphalt with rollers

  1. Access, interpret and apply compact asphalt with rollers documentation and ensure the work activity is compliant
  2. Obtain, read, interpret, clarify and confirm work requirements
  3. Identify and address potential risks, hazards and environmental issues, and implement control measures
  4. Select and wear personal protective equipment appropriate for work activities
  5. Confirm and apply environmental protection and safety requirements
  6. Obtain, interpret and implement traffic management signage requirements
  7. Select and check for faults plant, tools and equipment to carry out tasks
  8. Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency
Access, interpret and apply compact asphalt with rollers documentation and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, read, interpret, clarify and confirm work requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and address potential risks, hazards and environmental issues, and implement control measures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and wear personal protective equipment appropriate for work activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm and apply environmental protection and safety requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, interpret and implement traffic management signage requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and check for faults plant, tools and equipment to carry out tasks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare roller

  1. Perform start-up, park, shutdown and secure equipment procedures
  2. Plan water usage and replenishment
  3. Set tyres to required pressure (self-propelled, multi-wheeled pneumatic tyred rollers)
Perform start-up, park, shutdown and secure equipment procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan water usage and replenishment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set tyres to required pressure (self-propelled, multi-wheeled pneumatic tyred rollers)

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Compact asphalt

  1. Determine speed and rolling patterns
  2. Set amplitude and frequency as directed for vibratory steel wheeled rollers
  3. Avoid damage to other structures
  4. Monitor watering system to prevent pick up
  5. Maintain uniform speed and rolling pattern
  6. Compact joints
  7. Compact final surface free of blemishes or rolling marks
  8. Maintain safe distance between rollers, other plant and the paving crew
Determine speed and rolling patterns

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set amplitude and frequency as directed for vibratory steel wheeled rollers

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Avoid damage to other structures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor watering system to prevent pick up

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain uniform speed and rolling pattern

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Compact joints

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Compact final surface free of blemishes or rolling marks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain safe distance between rollers, other plant and the paving crew

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out operator maintenance

  1. Prepare machine for maintenance
  2. Conduct inspection and fault finding
  3. Carry out scheduled maintenance tasks
  4. Process written maintenance records
Prepare machine for maintenance

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct inspection and fault finding

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out scheduled maintenance tasks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Process written maintenance records

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relocate roller

  1. Prepare roller for relocation
  2. Drive roller safely on highways and construction sites
  3. Clear work area and dispose of or recycle materials
  4. Clean, check, maintain and store plant, tools and equipment
  5. Carry out housekeeping requirements
Prepare roller for relocation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Drive roller safely on highways and construction sites

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clear work area and dispose of or recycle materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, check, maintain and store plant, tools and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out housekeeping requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

1. Plan and prepare to compact asphalt with rollers

1.1 Access, interpret and apply compact asphalt with rollers documentation and ensure the work activity is compliant

1.2 Obtain, read, interpret, clarify and confirm work requirements

1.3 Identify and address potential risks, hazards and environmental issues, and implement control measures

1.4 Select and wear personal protective equipment appropriate for work activities

1.5 Confirm and apply environmental protection and safety requirements

1.6 Obtain, interpret and implement traffic management signage requirements

1.7 Select and check for faults plant, tools and equipment to carry out tasks

1.8 Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

2. Prepare roller

2.1 Perform start-up, park, shutdown and secure equipment procedures

2.2 Plan water usage and replenishment

2.3 Set tyres to required pressure (self-propelled, multi-wheeled pneumatic tyred rollers)

3. Compact asphalt

3.1 Determine speed and rolling patterns

3.2 Set amplitude and frequency as directed for vibratory steel wheeled rollers

3.3 Avoid damage to other structures

3.4 Monitor watering system to prevent pick up

3.5 Maintain uniform speed and rolling pattern

3.6 Compact joints

3.7 Compact final surface free of blemishes or rolling marks

3.8 Maintain safe distance between rollers, other plant and the paving crew

4. Carry out operator maintenance

4.1 Prepare machine for maintenance

4.2 Conduct inspection and fault finding

4.3 Carry out scheduled maintenance tasks

4.4 Process written maintenance records

5. Relocate roller

5.1 Prepare roller for relocation

5.2 Drive roller safely on highways and construction sites

6. Clean up

6.1 Clear work area and dispose of or recycle materials

6.2 Clean, check, maintain and store plant, tools and equipment

6.3 Carry out housekeeping requirements

Required Skills and Knowledge

1. Plan and prepare to compact asphalt with rollers

1.1 Access, interpret and apply compact asphalt with rollers documentation and ensure the work activity is compliant

1.2 Obtain, read, interpret, clarify and confirm work requirements

1.3 Identify and address potential risks, hazards and environmental issues, and implement control measures

1.4 Select and wear personal protective equipment appropriate for work activities

1.5 Confirm and apply environmental protection and safety requirements

1.6 Obtain, interpret and implement traffic management signage requirements

1.7 Select and check for faults plant, tools and equipment to carry out tasks

1.8 Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

2. Prepare roller

2.1 Perform start-up, park, shutdown and secure equipment procedures

2.2 Plan water usage and replenishment

2.3 Set tyres to required pressure (self-propelled, multi-wheeled pneumatic tyred rollers)

3. Compact asphalt

3.1 Determine speed and rolling patterns

3.2 Set amplitude and frequency as directed for vibratory steel wheeled rollers

3.3 Avoid damage to other structures

3.4 Monitor watering system to prevent pick up

3.5 Maintain uniform speed and rolling pattern

3.6 Compact joints

3.7 Compact final surface free of blemishes or rolling marks

3.8 Maintain safe distance between rollers, other plant and the paving crew

4. Carry out operator maintenance

4.1 Prepare machine for maintenance

4.2 Conduct inspection and fault finding

4.3 Carry out scheduled maintenance tasks

4.4 Process written maintenance records

5. Relocate roller

5.1 Prepare roller for relocation

5.2 Drive roller safely on highways and construction sites

6. Clean up

6.1 Clear work area and dispose of or recycle materials

6.2 Clean, check, maintain and store plant, tools and equipment

6.3 Carry out housekeeping requirements

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies applicable legislation, documentation, policies and procedures

implements the requirements, procedures and techniques for the safe, effective and efficient compacting of asphalt with rollers including:

selecting and using required tools and equipment

recording job specifications and producing work schedule

preparing roller

compacting asphalt

carrying out maintenance

moving/relocating roller

works effectively with others to undertake and complete the compacting of asphalt with rollers that meets all of the required outcomes including:

organising work activities to meet all task requirements

communicating clearly and concisely with others to receive and clarify work instructions

using a range of communication techniques and systems such as signage to advise others of work activity and exclusion zone

demonstrates completion of compacting asphalt with rollers that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

identifying, reporting and recording hazards and risks

compacting a minimum of 2000m2 of asphalt to the determined pattern, the measured density, with the minimum number of passes specified and to job specifications for five projects, with at least one project under 50mm thick and one project over 50mm thick

a minimum of three longitudinal joints of 100 metres each and two transfer joints to be matched

The candidate must demonstrate knowledge of compacting asphalt with rollers through:

applying legislative, organisational and site requirements and procedures:

site and equipment safety requirements

asphalt compacting techniques

asphalt paving operations

asphalt strength and performance characteristics

edge and joint treatments

safe operating techniques in all terrain

housekeeping

equipment types, characteristics, technical capabilities and limitations

applying and monitoring operational, maintenance and basic diagnostic procedures

applying site isolation and traffic control responsibilities and authorities

applying processes for the calculation of material uniformity and travel speed

safety data sheets and materials handling methods

monitoring project quality requirements

preparing and/or implementing JSAs/JSEA/safe work method statements