Evidence Guide: RIICBS308A - Load aggregate using a purpose built loader

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

RIICBS308A - Load aggregate using a purpose built loader

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare

  1. Access, interpret and apply compliance documentation relevant to the work activity
  2. Obtain and confirm safety requirements from the site safety plan and organisational policies and procedures, and apply to the allotted task
  3. Identify, obtain and implement signage requirements from the project traffic management plan
  4. Select plant, tools and equipment to carry out tasks consistent with the requirements of the job, check for serviceability and rectify or report any faults
  5. Identify environmental protection requirements from the project environmental management plan, and confirm and apply to the allotted task
Access, interpret and apply compliance documentation relevant to the work activity

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain and confirm safety requirements from the site safety plan and organisational policies and procedures, and apply to the allotted task

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, obtain and implement signage requirements from the project traffic management plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select plant, tools and equipment to carry out tasks consistent with the requirements of the job, check for serviceability and rectify or report any faults

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify environmental protection requirements from the project environmental management plan, and confirm and apply to the allotted task

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare loader for operation

  1. Conduct pre-operational checks on loader in accordance with manufacturer's handbook or company instructions
  2. Check type and quantity of pre-coat in tank and adjust to required level
  3. Check loader vehicle for functionality
  4. Check pre-coating requirements and select correct loader size
  5. Record material quantities and screen sizes
  6. Select screens appropriate to the aggregate size
Conduct pre-operational checks on loader in accordance with manufacturer's handbook or company instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check type and quantity of pre-coat in tank and adjust to required level

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check loader vehicle for functionality

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check pre-coating requirements and select correct loader size

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Record material quantities and screen sizes

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select screens appropriate to the aggregate size

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Manage stack site

  1. Identify and record aggregate sizes
  2. Check ground conditions at stack site to minimise contamination
  3. Estimate and record quantities in aggregate stockpiles
  4. Identify suitable parking availability and reserve for trucks while waiting and loading
  5. Position truck entry/exit signs as required
  6. Keep stack site free from contamination by pre-coat material
Identify and record aggregate sizes

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check ground conditions at stack site to minimise contamination

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Estimate and record quantities in aggregate stockpiles

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify suitable parking availability and reserve for trucks while waiting and loading

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Position truck entry/exit signs as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Keep stack site free from contamination by pre-coat material

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Load/screen/pre-coat aggregate

  1. Direct trucks into position to minimise dust to workers and contamination of aggregates in windy conditions
  2. Load appropriate aggregate quantities into trucks without contamination
  3. Apply pre-coating uniformly to aggregate at specified rate
  4. Load aggregate quantities accurately and record to company requirements
Direct trucks into position to minimise dust to workers and contamination of aggregates in windy conditions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Load appropriate aggregate quantities into trucks without contamination

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Apply pre-coating uniformly to aggregate at specified rate

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Load aggregate quantities accurately and record to company requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean up

  1. Clear work area and dispose of or recycle materials in accordance with project environmental management plan
  2. Clean, check, maintain and store plant, tools and equipment
Clear work area and dispose of or recycle materials in accordance with project environmental management plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, check, maintain and store plant, tools and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit

The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:

knowledge of the requirements, procedures and instructions for loading aggregate using a purpose built loader

implementation of requirements, procedures and techniques for the safe, effective and efficient loading of aggregate using a purpose built loader

working with others to undertake and complete the loading of aggregate using a purpose built loader that meets all of the required outcomes

consistent timely loading of aggregate using a purpose built loader that safely, effectively and efficiently meets the required outcomes

a minimum of four truck loads of aggregate from two separate stock piles are to be loaded, screened and pre-coated to job specifications

a minimum of four truck loads of aggregate from two separate stock piles are to be loaded and screened to job specifications

site is cleaned in accordance with operational requirements

Context of and specific resources for assessment

This unit must be assessed in the context of the work environment. Where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills.

Assessment of this competency requires typical resources normally used in a resources and infrastructure sector environment. Selection and use of resources for particular worksites may differ due to the site circumstances.

The assessment environment should not disadvantage the participant. For example, language, literacy and numeracy demands of assessment should not be greater than those required on the job.

Customisation of assessment and delivery environment to sensitively accommodate cultural diversity.

Aboriginal people and other people from a non English speaking background may have second language issues.

Where applicable, physical resources should include equipment modified for people with disabilities. Access must be provided to appropriate learning and/or assessment support when required.

Method of assessment

This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:

written and/or oral assessment of the candidate's required knowledge

observed, documented and/or first hand testimonial evidence of the candidate's:

implementation of appropriate requirement, procedures and techniques for the safe, effective and efficient achievement of required outcomes

consistent achievement of required outcomes

first hand testimonial evidence of the candidate's:

working with others to undertake and complete the loading of aggregate using a purpose built loader

Guidance information for assessment

Consult the SkillsDMC User Guide for further information on assessment including access and equity issues.

Required Skills and Knowledge

Required skills

Specific skills are required to achieve the Performance Criteria of this unit, particularly for its application in the various circumstances in which this unit may be used. This includes the ability to carry out the following, as required to load aggregate using a purpose built loader:

apply legislative, organisation and site requirements and procedures for loading aggregate using a purpose built loader

organise work activities

select and use relevant tools and equipment safely

identify and report on hazards related to the worksite and work activity

communicate effectively to receive and clarify work instructions

Required knowledge

Specific knowledge is required to achieve the Performance Criteria of this unit, particularly for its application in the various circumstances in which this unit may be used. This includes knowledge of the following, as required to load aggregate using a purpose built loader:

site and equipment safety requirements

aggregate types, characteristics and uses

aggregate loading procedures

aggregate screening and pre-coating procedures

stock pile control

dust control

silica, its properties and dangers

equipment types, characteristics, technical capabilities and limitations

operational, maintenance and basic diagnostic procedures

site isolation and traffic control responsibilities and authorities

processes for the calculation of material quantities

materials safety data sheets and materials handling methods

project quality requirements

civil construction terminology

JSAs/safe work method statements

Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Relevant compliance documentation may include:

legislative, organisational and site requirements and procedures

manufacturer's guidelines and specifications

Australian standards

Employment and workplace relations legislation

Equal Employment Opportunity and Disability Discrimination legislation

Safety requirements may include:

OHS requirements in accordance with state or territory legislation and regulations, organisational safety policies and procedures, and project safety plan, including protective clothing and equipment, use of tools and equipment, workplace environment and safety, handling of materials, use of fire fighting equipment, use of First Aid equipment, hazard control and hazardous materials and substances

safe parking practices including ensuring access ways are clear, equipment/machinery is away from overhangs and refuelling sites, safe distance are kept from excavations, and areas secured from unauthorised access or movement

safe operating procedures including recognising and preventing hazards associated with uneven/unstable terrain, trees, pits, poles, trip hazards, dirt mounds, overhead service lines, bridges, surrounding buildings, obstructions, structures, facilities, dangerous materials, recently filled trenches, other machines, personnel, traffic control, working in proximity to others, worksite visitors and the public

recognising hazards and risks including uneven/unstable terrain, trees, fires, overhead and underground services, bridges, buildings, excavations, traffic, embankments, cuttings, structures and hazardous materials

emergency procedures related to equipment operation including emergency shutdown and stopping, extinguishing equipment fires, organisational First Aid requirements and evacuation

Site may include:

car parks

airport runways

container yards

hard stands

footpaths

bikeways

roadways

Signage may include:

escort vehicle

highway traffic signs

site safety signage

temporary signage for the benefit of motorists and pedestrians

traffic conditions signage

Traffic conditions may include:

congested urban environments

low traffic rural areas

off-road un-trafficked areas

buildings

parking sites

pedestrian areas

Tools and equipment may include:

purpose built aggregate loaders

screens

tool kits

Environmental protection requirements may include:

organisational/project environmental management plan

waste management

water quality protection

noise

vibration

dust and clean-up management

Loader may include:

truck mounted loader that can load, screen and pre-coat aggregate in one operation

trailer mounted that can screen and pre-coat in one operation (usually fed by a front end loader)

Materials may include:

sealing aggregates

pre-coated aggregates

coating materials