NTISthis.com

Evidence Guide: RIICBS402D - Apply the principles for the application of bituminous sprayed treatment

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

RIICBS402D - Apply the principles for the application of bituminous sprayed treatment

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare for applying the principles of bituminous sprayed treatment

  1. Access, interpret and apply, the principles of bituminous sprayed treatment application, documentation and ensure the work activity is compliant
  2. Obtain, read, interpret, clarify and confirm work requirements
  3. Ensure a job plan, is available which makes best use of the available resources and the task requirements
  4. Identify the training requirements of team members and develop training plans
Access, interpret and apply, the principles of bituminous sprayed treatment application, documentation and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, read, interpret, clarify and confirm work requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure a job plan, is available which makes best use of the available resources and the task requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify the training requirements of team members and develop training plans

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure appropriate initiation for tasks is carried out

  1. Ensure clear and timely instructions are communicated to team members and others involved
  2. Confirm that the necessary resources are available
  3. Ensure appropriate set out of tasks
Ensure clear and timely instructions are communicated to team members and others involved

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm that the necessary resources are available

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure appropriate set out of tasks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Oversee the execution of tasks

  1. Monitor bituminous sprayed treatment task performance to ensure it achieves the required outcomes
  2. Initiate adjustments to work practice or job plan and ensure safe execution of work and achievement of required outcomes
  3. Ensure plant equipment and tools maintenance requirements are carried out and recorded
  4. Implement training plans
Monitor bituminous sprayed treatment task performance to ensure it achieves the required outcomes

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Initiate adjustments to work practice or job plan and ensure safe execution of work and achievement of required outcomes

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure plant equipment and tools maintenance requirements are carried out and recorded

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Implement training plans

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Report on the execution of tasks

  1. Complete and submit reports
  2. Recommend changes to improve the safety, efficiency and effectiveness of the execution of bituminous sprayed treatment tasks
Complete and submit reports

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Recommend changes to improve the safety, efficiency and effectiveness of the execution of bituminous sprayed treatment tasks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan and prepare for applying the principles of bituminous sprayed treatment

  1. Access, interpret and apply, the principles of bituminous sprayed treatment application, documentation and ensure the work activity is compliant
  2. Obtain, read, interpret, clarify and confirm work requirements
  3. Ensure a job plan, is available which makes best use of the available resources and the task requirements
  4. Identify the training requirements of team members and develop training plans
Access, interpret and apply, the principles of bituminous sprayed treatment application, documentation and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, read, interpret, clarify and confirm work requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure a job plan, is available which makes best use of the available resources and the task requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify the training requirements of team members and develop training plans

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure appropriate initiation for tasks is carried out

  1. Ensure clear and timely instructions are communicated to team members and others involved
  2. Confirm that the necessary resources are available
  3. Ensure appropriate set out of tasks
Ensure clear and timely instructions are communicated to team members and others involved

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm that the necessary resources are available

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure appropriate set out of tasks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Oversee the execution of tasks

  1. Monitor bituminous sprayed treatment task performance to ensure it achieves the required outcomes
  2. Initiate adjustments to work practice or job plan and ensure safe execution of work and achievement of required outcomes
  3. Ensure plant equipment and tools maintenance requirements are carried out and recorded
  4. Implement training plans
Monitor bituminous sprayed treatment task performance to ensure it achieves the required outcomes

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Initiate adjustments to work practice or job plan and ensure safe execution of work and achievement of required outcomes

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure plant equipment and tools maintenance requirements are carried out and recorded

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Implement training plans

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Report on the execution of tasks

  1. Complete and submit reports
  2. Recommend changes to improve the safety, efficiency and effectiveness of the execution of bituminous sprayed treatment tasks
Complete and submit reports

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Recommend changes to improve the safety, efficiency and effectiveness of the execution of bituminous sprayed treatment tasks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

1. Plan and prepare for applying the principles of bituminous sprayed treatment

1.1 Access, interpret and apply, the principles of bituminous sprayed treatment application, documentation and ensure the work activity is compliant

1.2 Obtain, read, interpret, clarify and confirm work requirements

1.3 Ensure a job plan, is available which makes best use of the available resources and the task requirements

1.4 Identify the training requirements of team members and develop training plans

2. Ensure appropriate initiation for tasks is carried out

2.1 Ensure clear and timely instructions are communicated to team members and others involved

2.2 Confirm that the necessary resources are available

2.3 Ensure appropriate set out of tasks

3. Oversee the execution of tasks

3.1 Monitor bituminous sprayed treatment task performance to ensure it achieves the required outcomes

3.2 Initiate adjustments to work practice or job plan and ensure safe execution of work and achievement of required outcomes

3.3 Ensure plant equipment and tools maintenance requirements are carried out and recorded

3.4 Implement training plans

4. Report on the execution of tasks

4.1 Complete and submit reports

4.2 Recommend changes to improve the safety, efficiency and effectiveness of the execution of bituminous sprayed treatment tasks

Required Skills and Knowledge

1. Plan and prepare for applying the principles of bituminous sprayed treatment

1.1 Access, interpret and apply, the principles of bituminous sprayed treatment application, documentation and ensure the work activity is compliant

1.2 Obtain, read, interpret, clarify and confirm work requirements

1.3 Ensure a job plan, is available which makes best use of the available resources and the task requirements

1.4 Identify the training requirements of team members and develop training plans

2. Ensure appropriate initiation for tasks is carried out

2.1 Ensure clear and timely instructions are communicated to team members and others involved

2.2 Confirm that the necessary resources are available

2.3 Ensure appropriate set out of tasks

3. Oversee the execution of tasks

3.1 Monitor bituminous sprayed treatment task performance to ensure it achieves the required outcomes

3.2 Initiate adjustments to work practice or job plan and ensure safe execution of work and achievement of required outcomes

3.3 Ensure plant equipment and tools maintenance requirements are carried out and recorded

3.4 Implement training plans

4. Report on the execution of tasks

4.1 Complete and submit reports

4.2 Recommend changes to improve the safety, efficiency and effectiveness of the execution of bituminous sprayed treatment tasks

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies relevant legislation, documentation, policies and procedures

implements the procedures and techniques for the safe, effective and efficient application of bituminous sprayed treatment including:

interpreting project contract and specification requirements and procedures

interpreting project site soil and geological data

identifying soil and rock types

interpreting meteorological data

interpreting material properties and test results, including compaction test results

interpreting project engineering

ring survey information

interpreting project plans and drawings

interpreting project specifications

works effectively with others to plan, prepare and conduct the application of bituminous sprayed treatment including:

communicating clear and timely instructions to those involved

preparing for and conducting briefings, toolbox and site meetings

maintaining clear and legible written records and the reports

demonstrates completion of applying the principles for the application of bituminous sprayed treatment that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

preparation of job plan, which includes at least five (5) of the following;

human resource requirements

plant and machinery requirements

construction materials requirements

sub-contractor support requirements

waste disposal requirements

coordination requirements

activity scheduling

materials delivery scheduling

risk assessment and management requirements

occupational health and safety requirements

quality management requirements, including testing scheduling requirements

traffic management requirements

environmental requirements

task monitoring requirements

task performance monitoring requirements

communication requirements

reporting requirements

assessment of resource requirements including at least two (2) of the following;

labour

plant, equipment and tools

material supply vehicles

construction materials, such as bitumen, sealing aggregates and additives

sub-contractor services

ensuring set out completed to requirements including;

control lines

off-sets

The candidate must demonstrate knowledge in applying the principles for the application of bituminous sprayed treatment through:

accessing, interpreting and applying legislative, organisation and site requirements and procedures for:

risk assessment and management

statutory compliance

workplace health and safety

environmental management

workplace communication

quality management

work zone traffic management

contract management

job administration

plant, equipment and tools maintenance

materials deliveries

supervising workplace relationships

job set out

plant and equipment capabilities and application

operational techniques for the execution of various operations

bituminous sprayed treatment tasks including:

priming or pre-sealing

normal bitumen sealing

polymer modified binder sealing

use of different aggregate sizes

requirements for low, low-medium, high and very high traffic conditions

pavement preparation requirements and procedures

sprayer and spreader calibration requirements and procedures

design rates of application of bituminous spray treatment materials

bituminous sprayed treatment task resource requirements and procedures

potential operational problems in the execution of operations

scheduling work activities

relationship between various areas of resources and infrastructure industries

resource requirements

conducting activities scheduling

applying estimating principles

applying road construction sequencing

using asphalt placement and compaction and related activities terminology

road geometry

pavement drainage requirements

characteristics, application and requirements and procedures for different types of asphalt

applying asphalt mix design philosophy and test methods

identifying ground surface treatment requirements and procedures e.g. proof rolling