The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

RIICFW301D - Construct underpinning

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare

  1. Access, interpret and apply construct underpinning documentation and ensure the work activity is compliant
  2. Obtain, interpret, clarify and confirm work instructions before proceeding
  3. Confirm and apply environmental protection and safety requirements
  4. Obtain, interpret and implement traffic management signage requirements
  5. Select and check for faults tools and equipment to carry out tasks
  6. Select and wear correct personal protective equipment appropriate for work activities
  7. Identify, address and report hazards, risks and environmental issues
  8. Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency
Access, interpret and apply construct underpinning documentation and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, interpret, clarify and confirm work instructions before proceeding

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm and apply environmental protection and safety requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, interpret and implement traffic management signage requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and check for faults tools and equipment to carry out tasks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and wear correct personal protective equipment appropriate for work activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, address and report hazards, risks and environmental issues

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set out and prepare sections

  1. Confirm and apply setout requirements
  2. Identify and record underpinning requirements for adjoining properties and roadways
  3. Identify and implement sections and sequence of excavations
  4. Check existing shoring system for soundness
  5. Set out sections for excavation
  6. Identify and protect areas for excavation and surrounding working space requirements
  7. Erect barricades and signage
  8. Position plant and equipment for excavations
Confirm and apply setout requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and record underpinning requirements for adjoining properties and roadways

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and implement sections and sequence of excavations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check existing shoring system for soundness

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set out sections for excavation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and protect areas for excavation and surrounding working space requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Erect barricades and signage

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Position plant and equipment for excavations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Excavate sections

  1. Excavate designated sections to the designed depth of footings
  2. Install trench and excavation support
Excavate designated sections to the designed depth of footings

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install trench and excavation support

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Construct underpinning

  1. Construct underpinning
  2. Backfill excavated sections
  3. Underpin alternate sections in sequence
Construct underpinning

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Backfill excavated sections

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Underpin alternate sections in sequence

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean up

  1. Clear work area and dispose of or recycle materials
  2. Clean, check, maintain and store plant, tools and equipment
Clear work area and dispose of or recycle materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, check, maintain and store plant, tools and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan and prepare

  1. Access, interpret and apply construct underpinning documentation and ensure the work activity is compliant
  2. Obtain, interpret, clarify and confirm work instructions before proceeding
  3. Confirm and apply environmental protection and safety requirements
  4. Obtain, interpret and implement traffic management signage requirements
  5. Select and check for faults tools and equipment to carry out tasks
  6. Select and wear correct personal protective equipment appropriate for work activities
  7. Identify, address and report hazards, risks and environmental issues
  8. Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency
Access, interpret and apply construct underpinning documentation and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, interpret, clarify and confirm work instructions before proceeding

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm and apply environmental protection and safety requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, interpret and implement traffic management signage requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and check for faults tools and equipment to carry out tasks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and wear correct personal protective equipment appropriate for work activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, address and report hazards, risks and environmental issues

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set out and prepare sections

  1. Confirm and apply setout requirements
  2. Identify and record underpinning requirements for adjoining properties and roadways
  3. Identify and implement sections and sequence of excavations
  4. Check existing shoring system for soundness
  5. Set out sections for excavation
  6. Identify and protect areas for excavation and surrounding working space requirements
  7. Erect barricades and signage
  8. Position plant and equipment for excavations
Confirm and apply setout requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and record underpinning requirements for adjoining properties and roadways

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and implement sections and sequence of excavations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check existing shoring system for soundness

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set out sections for excavation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and protect areas for excavation and surrounding working space requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Erect barricades and signage

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Position plant and equipment for excavations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Excavate sections

  1. Excavate designated sections to the designed depth of footings
  2. Install trench and excavation support
Excavate designated sections to the designed depth of footings

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install trench and excavation support

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Construct underpinning

  1. Construct underpinning
  2. Backfill excavated sections
  3. Underpin alternate sections in sequence
  4. Clear work area and dispose of or recycle materials
  5. Clean, check, maintain and store plant, tools and equipment
Construct underpinning

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Backfill excavated sections

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Underpin alternate sections in sequence

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clear work area and dispose of or recycle materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, check, maintain and store plant, tools and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

1. Plan and prepare

1.1 Access, interpret and apply construct underpinning documentation and ensure the work activity is compliant

1.2 Obtain, interpret, clarify and confirm work instructions before proceeding

1.3 Confirm and apply environmental protection and safety requirements

1.4 Obtain, interpret and implement traffic management signage requirements

1.5 Select and check for faults tools and equipment to carry out tasks

1.6 Select and wear correct personal protective equipment appropriate for work activities

1.7 Identify, address and report hazards, risks and environmental issues

1.8 Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

2. Set out and prepare sections

2.1 Confirm and apply setout requirements

2.2 Identify and record underpinning requirements for adjoining properties and roadways

2.3 Identify and implement sections and sequence of excavations

2.4 Check existing shoring system for soundness

2.5 Set out sections for excavation

2.6 Identify and protect areas for excavation and surrounding working space requirements

2.7 Erect barricades and signage

2.8 Position plant and equipment for excavations

3. Excavate sections

3.1 Excavate designated sections to the designed depth of footings

3.2 Install trench and excavation support

4. Construct underpinning

4.1 Construct underpinning

4.2 Backfill excavated sections

4.3 Underpin alternate sections in sequence

5. Clean up

5.1 Clear work area and dispose of or recycle materials

5.2 Clean, check, maintain and store plant, tools and equipment

Required Skills and Knowledge

1. Plan and prepare

1.1 Access, interpret and apply construct underpinning documentation and ensure the work activity is compliant

1.2 Obtain, interpret, clarify and confirm work instructions before proceeding

1.3 Confirm and apply environmental protection and safety requirements

1.4 Obtain, interpret and implement traffic management signage requirements

1.5 Select and check for faults tools and equipment to carry out tasks

1.6 Select and wear correct personal protective equipment appropriate for work activities

1.7 Identify, address and report hazards, risks and environmental issues

1.8 Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

2. Set out and prepare sections

2.1 Confirm and apply setout requirements

2.2 Identify and record underpinning requirements for adjoining properties and roadways

2.3 Identify and implement sections and sequence of excavations

2.4 Check existing shoring system for soundness

2.5 Set out sections for excavation

2.6 Identify and protect areas for excavation and surrounding working space requirements

2.7 Erect barricades and signage

2.8 Position plant and equipment for excavations

3. Excavate sections

3.1 Excavate designated sections to the designed depth of footings

3.2 Install trench and excavation support

4. Construct underpinning

4.1 Construct underpinning

4.2 Backfill excavated sections

4.3 Underpin alternate sections in sequence

5. Clean up

5.1 Clear work area and dispose of or recycle materials

5.2 Clean, check, maintain and store plant, tools and equipment

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies applicable legislation, documentation, policies and procedures

implements the requirements, procedures and techniques for the safe, effective and efficient completion of underpinning construction including:

using correct drilling and excavation techniques

works effectively with others to undertake and complete the construction of underpinnings that meets all of the required outcomes including:

communicating clearly and concisely with others to receive and clarify work instructions

using a range of communication technique and systems such as signage to advise others of work activity and exclusion zones

demonstrates completion of underpinning construction that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

identifying and record in writing underpinning requirements for adjoin properties and roadways from site drawing and survey of the surrounding construction

excavating and backfilling the designated sections

conducting construction of underpinning for a minimum of two (2) projects:

one (1) using drilling techniques and;

one (1) using excavation techniques to the required job specifications

The candidate must demonstrate knowledge of construction underpinning through:

applying legislative, organisational and site requirements and procedures for:

site and equipment safety requirements

foundation work

civil construction terminology

underpinning techniques

water erosion

using construction principles

interpreting engineering drawings

identifying soil, sand, rock, clay, shale, gravel and silt types and characteristics

identifying equipment types, characteristics, technical capabilities and limitations

applying site isolation and traffic control responsibilities and authorities

interpreting and complying with safety data sheets and materials handling methods

monitoring project quality requirements

preparing and/or implementing JSA/JSEA/safe work method statements