NTISthis.com

Evidence Guide: RIICFW303D - Install primary ground support

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

RIICFW303D - Install primary ground support

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare

  1. Access, interpret and apply documentation to install primary ground support and ensure the work activity is compliant
  2. Obtain, interpret and clarify and confirm work instructions before proceeding
  3. Confirm and apply environmental protection and safety requirements
  4. Obtain, interpret and implement traffic management signage requirements
  5. Select, and check for faults, plant, tools and equipment to carry out tasks
  6. Select and wear correct personal protective equipment appropriate for work activities
  7. Identify, address and report environmental issues, potential hazards and risks
  8. Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency
Access, interpret and apply documentation to install primary ground support and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, interpret and clarify and confirm work instructions before proceeding

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm and apply environmental protection and safety requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, interpret and implement traffic management signage requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select, and check for faults, plant, tools and equipment to carry out tasks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and wear correct personal protective equipment appropriate for work activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, address and report environmental issues, potential hazards and risks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set out and prepare for primary ground support

  1. Determine the requirements for ground support construction
  2. Identify and implement method of ground support installation
  3. Obtain material required for primary ground support
  4. Install primary ground support in accordance with the progressive development of the excavation process
  5. Set out position of sets/rings and points of support
  6. Prepare component parts of ground support
Determine the requirements for ground support construction

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and implement method of ground support installation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain material required for primary ground support

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install primary ground support in accordance with the progressive development of the excavation process

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set out position of sets/rings and points of support

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare component parts of ground support

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install primary ground support

  1. Select relevant primary ground support system
  2. Install primary ground support system
Select relevant primary ground support system

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install primary ground support system

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain primary ground support

  1. Carry out daily inspection of primary ground support to ensure system is secure
  2. Identify faults and make adjustments to ensure ground support is maintained
  3. Identify ground faults and determine and carry out support rectifications
Carry out daily inspection of primary ground support to ensure system is secure

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify faults and make adjustments to ensure ground support is maintained

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify ground faults and determine and carry out support rectifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean up

  1. Clear work area and dispose of or recycle materials
  2. Clean, check, maintain and store plant, tools and equipment
Clear work area and dispose of or recycle materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, check, maintain and store plant, tools and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan and prepare

  1. Access, interpret and apply documentation to install primary ground support and ensure the work activity is compliant
  2. Obtain, interpret and clarify and confirm work instructions before proceeding
  3. Confirm and apply environmental protection and safety requirements
  4. Obtain, interpret and implement traffic management signage requirements
  5. Select, and check for faults, plant, tools and equipment to carry out tasks
  6. Select and wear correct personal protective equipment appropriate for work activities
  7. Identify, address and report environmental issues, potential hazards and risks
  8. Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency
Access, interpret and apply documentation to install primary ground support and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, interpret and clarify and confirm work instructions before proceeding

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm and apply environmental protection and safety requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, interpret and implement traffic management signage requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select, and check for faults, plant, tools and equipment to carry out tasks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and wear correct personal protective equipment appropriate for work activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, address and report environmental issues, potential hazards and risks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set out and prepare for primary ground support

  1. Determine the requirements for ground support construction
  2. Identify and implement method of ground support installation
  3. Obtain material required for primary ground support
  4. Install primary ground support in accordance with the progressive development of the excavation process
  5. Set out position of sets/rings and points of support
  6. Prepare component parts of ground support
Determine the requirements for ground support construction

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and implement method of ground support installation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain material required for primary ground support

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install primary ground support in accordance with the progressive development of the excavation process

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set out position of sets/rings and points of support

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare component parts of ground support

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install primary ground support

  1. Select relevant primary ground support system
  2. Install primary ground support system
Select relevant primary ground support system

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install primary ground support system

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain primary ground support

  1. Carry out daily inspection of primary ground support to ensure system is secure
  2. Identify faults and make adjustments to ensure ground support is maintained
  3. Identify ground faults and determine and carry out support rectifications
  4. Clear work area and dispose of or recycle materials
  5. Clean, check, maintain and store plant, tools and equipment
Carry out daily inspection of primary ground support to ensure system is secure

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify faults and make adjustments to ensure ground support is maintained

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify ground faults and determine and carry out support rectifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clear work area and dispose of or recycle materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, check, maintain and store plant, tools and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

1. Plan and prepare

1.1 Access, interpret and apply documentation to install primary ground support and ensure the work activity is compliant

1.2 Obtain, interpret and clarify and confirm work instructions before proceeding

1.3 Confirm and apply environmental protection and safety requirements

1.4 Obtain, interpret and implement traffic management signage requirements

1.5 Select, and check for faults, plant, tools and equipment to carry out tasks

1.6 Select and wear correct personal protective equipment appropriate for work activities

1.7 Identify, address and report environmental issues, potential hazards and risks

1.8 Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

2. Set out and prepare for primary ground support

2.1 Determine the requirements for ground support construction

2.2 Identify and implement method of ground support installation

2.3 Obtain material required for primary ground support

2.4 Install primary ground support in accordance with the progressive development of the excavation process

2.5 Set out position of sets/rings and points of support

2.6 Prepare component parts of ground support

3. Install primary ground support

3.1 Select relevant primary ground support system

3.2 Install primary ground support system

4. Maintain primary ground support

4.1 Carry out daily inspection of primary ground support to ensure system is secure

4.2 Identify faults and make adjustments to ensure ground support is maintained

4.3 Identify ground faults and determine and carry out support rectifications

5. Clean up

5.1 Clear work area and dispose of or recycle materials

5.2 Clean, check, maintain and store plant, tools and equipment

Required Skills and Knowledge

1. Plan and prepare

1.1 Access, interpret and apply documentation to install primary ground support and ensure the work activity is compliant

1.2 Obtain, interpret and clarify and confirm work instructions before proceeding

1.3 Confirm and apply environmental protection and safety requirements

1.4 Obtain, interpret and implement traffic management signage requirements

1.5 Select, and check for faults, plant, tools and equipment to carry out tasks

1.6 Select and wear correct personal protective equipment appropriate for work activities

1.7 Identify, address and report environmental issues, potential hazards and risks

1.8 Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

2. Set out and prepare for primary ground support

2.1 Determine the requirements for ground support construction

2.2 Identify and implement method of ground support installation

2.3 Obtain material required for primary ground support

2.4 Install primary ground support in accordance with the progressive development of the excavation process

2.5 Set out position of sets/rings and points of support

2.6 Prepare component parts of ground support

3. Install primary ground support

3.1 Select relevant primary ground support system

3.2 Install primary ground support system

4. Maintain primary ground support

4.1 Carry out daily inspection of primary ground support to ensure system is secure

4.2 Identify faults and make adjustments to ensure ground support is maintained

4.3 Identify ground faults and determine and carry out support rectifications

5. Clean up

5.1 Clear work area and dispose of or recycle materials

5.2 Clean, check, maintain and store plant, tools and equipment

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies applicable legislation, documentation, policies and procedures

implements the requirements, procedures and techniques for the safe, effective and efficient completion of primary ground support installation including:

using correct method for ground support

works effectively with others to undertake and complete the installation of primary ground support that meets all of the required outcomes including:

communicating clearly and concisely with others to receive and clarify work instructions

using a range of communication technique and systems such as signage to advise others of work activity and exclusion zones

demonstrates completion of installing primary ground support that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

setting out position of sets/rings and points of support

installing at least one of the following primary ground support systems to specifications:

sets and rings for two (2) projects

sheet piling for one (1) project

panel and box sets for two (2) projects

maintaining primary ground support through inspections, fault identification and implementation of adjustments/rectifications

The candidate must demonstrate knowledge of installing primary ground support through:

applying organisation, site requirements and procedures for:

site and equipment safety requirements

foundation work

construction principles

water erosion

project quality requirements

civil construction terminology

selecting and using relevant tools and equipment safely

describing primary ground support systems and their installation techniques

describing scaffolding and work platform installation

interpreting engineering drawings

identifying soil, sand, rock, clay, shale, gravel and silt types and characteristics

identifying equipment types, characteristics, technical capabilities and limitations

applying and monitoring operational, maintenance and basic diagnostic procedures

applying site isolation and traffic control responsibilities and authorities

interpreting and complying with materials safety data sheets and materials handling methods

project quality requirements

civil construction terminology

preparing and/or implementing JSA/JSEA/safe work method statements