The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare
|
|
Access, interpret and apply compliance documentation relevant to the work activity Completed |
Evidence:
|
Obtain safety requirements from the site safety plan Completed |
Evidence:
|
Identify, obtain and implement signage requirements from the project traffic management plan Completed |
Evidence:
|
Select plant, tools and equipment to carry out tasks consistent with the requirements of the job, check for serviceability and rectify or report any faults Completed |
Evidence:
|
Identify, confirm and apply environmental protection requirements from the project environmental management plan Completed |
Evidence:
|
Set out and excavate
|
|
Prepare work area and materials to support the efficient installation of the pipe work Completed |
Evidence:
|
Determine and apply dewatering requirements Completed |
Evidence:
|
Determine location, alignment direction, level and grade of stormwater system from job drawings/specifications Completed |
Evidence:
|
Set out works to specification Completed |
Evidence:
|
Advise plant operator of excavation requirements and monitor levels Completed |
Evidence:
|
Install stormwater system bedding in accordance with plans, specifications and standards Completed |
Evidence:
|
Install stormwater system
|
|
Lower pipes and place in position to design specifications Completed |
Evidence:
|
Join pipes in accordance with manufacturer's specifications Completed |
Evidence:
|
Check alignment level and grade continuously for conformance with design plans and specifications Completed |
Evidence:
|
Position side support and/or overlay beside the pipes Completed |
Evidence:
|
Fit inspection openings in accordance with job specifications Completed |
Evidence:
|
Monitor backfill procedure to ensure work is completed to specification, where specified Completed |
Evidence:
|
Test stormwater system
|
|
Perform test to relevant authority requirements as determined by the specifications Completed |
Evidence:
|
Perform stormwater system test procedures establishing functionality and serviceability Completed |
Evidence:
|
Record and report test results Completed |
Evidence:
|
Clean up
|
|
Clear work area and dispose of or recycle materials in accordance with project environmental management plan Completed |
Evidence:
|
Clean, check, maintain and store plant, tools and equipment Completed |
Evidence:
|